Project Plan-Business Requirement Document
Ali Allami
CIS 599 Graduate Information Systems Capstone
Supported by: Professor. Mark Cohen
Oct 27, 2019
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 2 Abstract
The project plan inception has been complete in last week with introduction documenting the cur-
rent IT network and that system is very important. Many kinds of businesses have an operation in place
to help with project management and implementation requirement. There is a chance for improvement
includes making suitable assessments of how to size a project is and project cost estimated.
There are multiple various names for tools that used with for this process: business needs requirement
and specification, requirements specification or, simply, business requirements. Business requirements
are the significant works of a company that must be done to make the company successful. And a busi-
ness requirements document (BRD) means company work documentation. The BRD process can be
incorporated within a Six Sigma DMAIC Define, Measure, Analyze, Improve, and Control culture.
Completion of a quality requirements document allows user needs and expectations to be captured, so
that infrastructure and information systems can be designed properly. Using the requirements document
provided in the course shell as a part of the requirements gathering process. You are to assess the needs
of the company as it prepares to become a multinational organization. You must consider current and
future trends and requirements; however, assumptions should be realistic and carefully considered. The
needs of the organization should be documented. Later deliverables will focus on specifics of all re-
quirements.
In the Business Require Document of this project I will describe the project summary and project
scope of work. In the scope, I will explain how to control the scope. Then I will describe the possible
risks, then integration with database and data warehousing, cloud technology and Virtualization, and
security level. The Project plan in MS Project (.mpp file) will be in the second attaced.
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 3
Document Control
Change Record
Date Author Version Change Reference
11/1/12 Mr. Jen 1.1 Introduction
12/14/12 Dr Joe 1.2 Add 3 main.5 subtask
12/24/12 Mr. Jenny 1.3 Database work
1/4/13 Mr. Jenny 1.4 Bug fix in software
Reviewers
Name Position
Dr. Lli Project Manager
Dr. Jen CIO
Mr. Joe Assistant Project Manager
Mr. Jenny Sr. Software engineer
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 4 Table of Contents
Document Control ....................................................................................................................................... 3
Business Requirements ............................................................................................................................. 5
SCOPE ........................................................................................................................................................................ 5
Describe the scope and analyze how to control the scope. .............................................................................................5
Speculate and give justifications for how to control scope ..............................................................................................6
Assess the human capital that may be needed to complete the project, ensuring that .....................................8
necessary skill sets are identified. .................................................................................................................................................9
Speculate on possible outsourcing or offshoring needs that may be required to accomplish project. ......9
Define relevant terms that will be used throughout the Project ............................................................................... 90
Include Cost projection for staffing, infrastructure and other resources. .............................................................. 11
Costs of Project ...................................................................................................................................................... 11
Noticeable costs associated are listed in the following table ........................................................................... 11
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 5
Business Requirements
Project Overview Our business project plan will deliver a description of the project, which
contain the project’s aims. Furthermore, the plan designed to coordinate between company teams:
Project Sponsor, Steering Committee, Project Manager, Project Team, and any other personnel
associated with the project. The project includes the followings: project purpose, business and project
goals and objectives, scope and expectations, roles and responsibilities, assumptions and constraints,
project management approach, ground rules for the project, project budget, project timeline, the
conceptual design of new technology.
Background including current process I will be the Chief Information Officer (CIO) of
the company and I should merge my company to a multinational company of equal size as requested
from me and I will be responsible for developing a project plan to integrate all systems, including all IT
requirements. The IT part of the project contains network storage and retrieval and it includes the
telecommunication parts also. IT manages the technology that handles a company's information: online,
on computers, on servers and on telephones.
SCOPE
Describe the scope and analyze how to control the scope.
The project seeks to improve the operations of the organization, ensuring that various processes are
conducted effectively. The scope is collecting the required information to start a project, "The work
that needs to be accomplished to deliver a product, service, or result with the specified features and
functions. Notice that project scope is provided work direction, while product scope is more oriented
toward functional requirements. So it is very important to complete defined and described. And if there
is no effective change control in a project, scope or requirement creep may ensue. Projects are expected
to meet strict deadlines with resource restraints. Scope change sometimes causes cost overrun. Any
changes in the scope of the project will be controlled through consultation with the parties in the
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 6 agreement and the permission of the Chief Executive Officer. If control scope is allowed to creep you
will lose control of the project and unofficial changes in product scope will cause the project to get be-
hind schedule and to over-run its budget. The most important aspect of this is to take consideration of
the impact of control scope on schedule, cost, quality, resources, risk, etc. on any such potential chang-
es to scope. Also important is to ensure that the underlying causes of scope change requests are fully
understood and managed, and while doing so to prevent any unnecessary change requests for proceed-
ing further. In the scope of the project, any change will be controlled through consultation with the par-
ties to get approval. If control scope is allowed to creep you will lose control of the project and unoffi-
cial changes in product scope will cause the project to get behind schedule and to over-run its budget.
Speculate and give justifications for how to control scope
Control Scope process changes to scope are an ongoing process starting when a create scope baseline.
There are 5 inputs to the control scope processing:
1- Project management plan- describe how control scope happens and explaining the project
change control system.
2- Work performance information- in this action provides the information about the deliverable
status and describes which deliverables are done, which are still remains.
3- Requirements documentation- in this action, the requirements documentation work as a refer-
ence for any change.
4- Requirements traceability matrix- In this action, the project manager checks the value of project
changes
5- Organizational process assets- this action covers any special policies from the organization re-
garding scope management.
Also there are 5 outputs to the control scope processing:
1- Work performance measurements- this action shows how actual progress is different from the orig-
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 7
inal plan.
2- Organizational process assets updates- this action will help to update the change for future projects.
3- Change requests- If any changes are made to the scope baseline, then these must be included as
updates to the WBS.
4- Project management plans updates- as mentioned above, any change in scope will need to be up-
dated within the project management plan.
5- Project document updates- In this action, update any other documentation needs to change.
Identify possible risks, constraints, and assumptions.
Risk factors and Constraints
The potential risks that could be encountered in the project lifecycle may include part of the
software used in the system. There might be a slight functionality of the software that is used in the
system, causing errors, deviations from expected results. The risks could not be avoided entirely since
every application program is not perfect. The risks could be minimized by doing continuous review and
update of software.
Time constraint is present, and the project may not be completed in the stipulated time frame.
There may be opposition from management and staff to change organizational structure, for fear of
losing control and authority.
Describe the needed integration with other systems and infrastructure.
The system is designed to be integrated with other business applications like database systems, cloud
computing, network infrastructure, as it has the capabilities of Enterprise Resource Planning Systems.
For ERP to function well, it is essential to coordinate and connect the various points of database storage
in the organization, to create a single access point for the company’s information and data. Data
Management system is incorporated in the system to manage the organization’s movement and
retention of data, and to ensure the quality of information (O’Brien, 2005).
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 8 The system should be integrated with cloud technology, virtualization, and security system to
ensure efficient management of flow of information from one point to another (Goodman, 2016). A
security control system is thus vital to permit information safety, reduced risk of data loss. Security will
be approached by instituting Information Control System, installing security software and firewall, and
security frameworks to manage and control various access points to information, beginning from
database servers, network servers, application servers, web servers (Goodman, 2016). The different
security frameworks will be approached in compliance with set standards, like NIST (National Institute
of Standards and Technology), ISO (International Organization of Standardization).
Assess the human capital that may be needed to complete the project, ensuring that necessary
skill sets are identified.
According to et al’. (Gamage, 2013) Human Capital is one of the key areas, which an
organization should consider, when thinking about the organizational success and existence.
Particularly task related human capital helps to detect new business opportunities such as new projects,
and it’s easy to understand new knowledge. Therefore business-related human capital is more
positively related to business success than non-task related human capital. And human capital is an
important factor for industries with higher level of technology.
So, since the project is multidimensional in the sense that it would require a cross-functional team
to coordinate and collaborate, evaluation of specialists from different fields is necessary. This is so to
benefit from the advantages of specialization. The project may specifically require computer
networking specialist that will be in charge evaluating the various hardware platform and software,
laying down the foundation of network infrastructure, and monitoring the progress of the system.
People that are qualified for this particular kind of job must have certification in computer networking.
We may require a Network Administrator, Network Engineer, Network Analyst, Information Systems
Administrator, and Network Technician.
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 9 Information systems specialists are also required to perform IT-related tasks like programming,
software developing, designing and managing the information system and database, evaluating and
monitoring system performance, analyzing various IT infrastructure, designing system security, they
are also required to have skills in planning, organizing and solve the multiple problems that are
encountered in the project life cycle. We may require Cyber Security Analysts, Application Analysts,
Data Scientists, IT consultants, Database Administrators, Software Engineers, Systems Analysts,
Application Developer, Web Content Manager, Business Analyst, IT Sales Professional, Technical
Support Officer.
Speculate on possible outsourcing or offshoring needs that may be required to accomplish project.
While we are merging with multinational company we need outsourcing and offshoring both. All
the designing, manufacture, architecture clerk work will be offshore. Some Technical Job Specification
in the skills requirements will be useful if we employ the services from outside. It will be more
expensive to develop and train employees to do the technical part of the project. The project will
correctly outsource the following experts, Network Analyst, IT Consultants, Security Analysts, from
well renowned IT firms. Most of the system software will be outsourced from other firms provided the
services. Proper evaluation and selection procedures will be applied to determine the supplier of the
computer packages software.
Offshore software development will be the main off-shoring, especially programs where the
needed skills and technology are not available and installing one in the organization will be expensive.
The project will be executed by the organization itself, as it involves many stakeholder involvements.
Define relevant terms that will be used throughout the Project
The terms of reference for a project are often referred to as the project charter which help to
achieve the project goals. Terms of reference show how the scope will be defined, developed, and
verified. In order to meet these criteria, success factors/risks and restraints should be fundamental keys.
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 10 Creating detailed terms of reference is very important:
Creating detailed terms of reference is critical, as they determine the following:
Vision, objectives, scope and deliverables (i.e. what has to be achieved)
Stakeholders, roles and responsibilities (i.e. who will take part in it)
Resource, financial and quality plans (i.e. how it will be achieved)
Work breakdown structure and schedule (i.e. when it will be achieved
On the other hands, the "terms of reference" are created during the earlier stages of project
management, immediately after the approval of a project business case. They are documented by the
project manager and presented to project sponsor or sponsors for approval. Once the terms have been
approved, the members of the project team have a clear definition of the scope of the project.
Include Cost projection for staffing, infrastructure and other resources.
The particular components relate to what is required besides the elements already in place in the organization.
Costs of Project
Noteworthy, costs associated to the project are listed in the following table
Particulars Requirements Cost
Consulting and system
integration services
Outsourcing and Off-shoring
services, specialist services
Rate of $125, the total for the
project is $ $1,500
Internet platforms Website, e-commerce and Cloud
services, web-hosting
Estimated at a total of
$100,000
Networking and
telecommunications
platforms
LINUX operating system for
servers, application accelerators
Estimated at $21,000
Data management and
storage
HPE expansion module storage
servers
Around $10,175
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 11 Computer hardware
platforms, like server
machines, mainframes
Microsoft Exchange servers
standard editions
For $ 23,500
Routers and switches Cisco routers and switches
required 12 pieces
For $31,120
Firewalls Enterprise Firewalls For $25,000
Storage Area Network
(SAN)
Cisco SAN installation For $20,000
DNS server Cloud DNS Rate of $0.2 per month, for
$2.4
Server Rooms Storage room and facilities For $6,000
Infrastructure Software Operating systems, middleware For $5,000
Installation Costs Oracle ERP implementation About $130,000
Human Resource services Salaries, wages, allowances About $100,000
Miscellaneous expenses Shipment, transport About $24,500
PROJECT PLAN-BUSINESS REQUIREMENT DOCUMENT 12
Reference:
Goodman, S., Straub, D. W., & Baskerville, R. (2016). Information security: policy, processes, and
practices. Routledge.
O’Brien, J. A., & Marakas, G. M. (2005). Introduction to information systems (Vol. 13). New York City,
USA: McGraw-Hill/Irwin.
Tanya Berezin. Writing a Software Requirements Document.
Science Direct. Network Infrastructure. Retrieved from:
https://www.sciencedirect.com/topics/computer-science/network-infrastructure
Business Requirements Document (BRD), understanding the basics. Retrieved from:
https://reqtest.com/requirements-blog/business-requirements-document-brd/
How to Write a Business Requirements Document. Retrieved from:
http://www.requirementsnetwork.com/documents.htm
Schwalbe, K. (2013). Information technology project management. (6th ed.). Cram101. Varianceanalysis.org. (n.d.). Retrieved from http://www.varianceanalysis.org/Gamage. (2013). Human Capital is an important factor for the Success of an organization. Retrieved Lamoreaux, Naomi R. “The great merger movement in American business, 1895-1904.” Cambridge University Press, 1985