Multiple-Criteria Methods
for Evaluation and Group
Decision Making
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
If this PowerPoint presentation contains mathematical equations, you may need to check that your computer has the following installed:
1) MathType Plugin
2) Math Player (free versions available)
3) NVDA Reader (free versions available)
Figure 6-1 Decision Analysis Paradigm
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-2 Hierarchy of Objectives for Advanced Vehicle Systems
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-3 Graphical Assessment of Indifference Probability
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-4 Sample Interview Question for Relative Fuel Economy
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-5 Example of Utility Curve for Representative Consumer
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-6 Sample Interview Question Used to Determine Scaling Constant for the Relative Fuel Economy Attribute
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-7 Sample Interview Question Used to Determine Order of Importance of Attributes
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-8 Summary Three-Level Hierarchy for Selection Problem
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6-9 Human Productivity Objective Hierarchy
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-1 Scale Used for Pairwise Comparisons
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-2 Priority Vector for Major Criteria
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-3 Local and Global Priorities for the Problem of Selecting an In-Orbit Assembly System
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-4 Example G D S S Features to Support Six Task Types
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-5
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6-6
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6A-1 Universal Self-Deployable Cargo Handler
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6A-2 Objective Hierarchy for Next-Generation Cargo Handler
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Figure 6A-3 Abbreviated Version of the Objective Hierarchy
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-1 Priority Vector for Major Criteria
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-2 Local and Global Priorities
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-3 Comparison of Responses Using the A H P
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-4 Summary of Results for the A H P Analysis
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-5 Attribute Data for Decision Maker 1
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-6 Scale Used for “Mission Objectives” Attribute
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-7 Comparison of A H P Weights and M A U T Scaling Constants for the Five Decision Makers
Copyright © 2017, 2005, 1994 Pearson Education, Inc. All Rights Reserved
Table 6A-8 Summary of Results for M A U T Analysis