CE 4460 5560 PROJECT MANAGEMENT

PROJECT I B FALL 2017

3. PREPARE AN ENGINEER COST ESTIMATE FOR PERFORMING THE WORK

ON THE BASEMENT PORTION OF THE STRUCTURE. FILL IN BLANK SPACES

ITEM ACTIVITY UNIT ESTIMATED2 UNIT PRICE ACTIVITY

QUANTITY COST

1 SURVEY

2 VEGETATION

3 TOPSOIL

4 EXCAVATION

5 FOOTING

6 WALL

7 GRANULAR1

BENEATH FLOOR

8 FLOOR SLAB

9 6 IN. PIPE

10 GRANULAR1

AROUND PIPE

11 BACKFILL1

WALL

12 REPLACE

TOPSOIL

TOTAL ESTIMATED COST: ____________

1 ADD COMPACTION

2 USE PROJECT IA ESTIMATED ACTIVITY/QUANTITY VALUES ON MOODLE

CE 4460 5560 PROJECT MANAGEMENT -2-

PROJECT I B FALL 2017

ACTIVITY MEANS PAGE

1 22

2 205

3 207

4 215

5 62/63

6 63

7 220/532

8 63

9 308

10 220/532

11 532

12 532