Cost Accounting Case Study
Eileen Peacock
AACSB International
Paul Juras
Wake Forest University
“We invested a great deal of time and money into developing the
activity-based costing (ABC) system, and now I am not sure if it
provides the information we really need for long-term decision-
making purposes,” Amy Wesling, plant manager of Precision
Paint Shop’s (PPS) Southern Plant, told her administrative team.
“The ABC data helped us understand our costs better, but now
I’m wondering if it’s the right information to serve as the basis for
helping us achieve our strategic goals.”
COMPANY DESCRIPTION
Precision Paint Shop (a fictionalized version of an actual
Midwest company) is a privately-held custom coater
(painter) of automotive components for original equipment
manufacturers (OEMs) and tier 1 and tier 2 suppliers.
The company has annual revenues of $90 million per year,
with $35 million in sales from the Southern plant, which
specializes in spray topcoat applications.
PPS specializes in the application of a series of coatings.
Raw metal parts are received on consignment from the
customer, finished with the desired application(s) of paint
and other coatings, and shipped back to the same customer.
The product lines consist of a large number of combinations
of paint colors, types of coating, and paint finishes. Figure
1 provides a diagram of the production process, and “PPS’s
Production Process” (Sidebar 1) provides a narrative of the
production process.
Historically, PPS accepted most of the work assignments
offered. Prices were market driven, and management used
a form of standard costing to evaluate product profitability.
Over the past three years demand had significantly
increased, especially in the higher-grade coatings. In fact,
the product mix flip-flopped from 80% low-gloss (LG) finish
two years ago to 85% high-gloss (HG) finish in the current
year. Unfortunately, along with the increase in volume came
a decrease in profits.
The immense number of combinations of coatings and
color created complexity for the company. Also, the parts to
be painted varied in size and shape, further complicating the
painting process. The end result was that four characteristics—
coating, color, shape, and size—were instrumental in
determining the complexity of the operation. This variety
initiated a mix of activities unique to each job. The very
nature of the painting process and the need for a near-100%
perfection level in the industry resulted in a high level of
inspections, refinishing, rework, and scrap. Complexity had
driven up overhead costs, leaving direct materials accounting
for only 26% of total manufacturing costs.
THE COSTING SYSTEM
Recently had PPS moved away from a conventional standard
costing system to ABC. The change was made to better
understand the costs associated with painting the various
products. The ABC analysis revealed the fundamental
differences that existed between the different mixes of
product characteristics. Table 1 provides an illustrative
comparison of two versions of a bumper: an LG finish
and an HG finish. After the ABC analysis, Chad Leaders,
plant accountant, provided a report showing a significant
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 01
ISSN 1940-204X
Alternative Costing Methods: Precision Paint Shop’s Dilemma
change in the reported profitability levels of the various
product lines. Table 2 summarizes the types of changes that
took place. Once implemented, the ABC information was
used to negotiate product pricing and to report financial
performance.
PLANNING FOR CAPACITY USE
The conveyor line was definitely a constraining resource of
the painting process. Through her knowledge of theory of
constraints (TOC), Mandy James, production supervisor,
had developed a method for factoring in the various process
elements into demand levels on conveyor capacity. Using
bumpers as an example, she presented the template
appearing in Table 3, and compared an LG bumper to an
HG bumper. The template starts with the quality issue.
The greater the percentage of defects, the lower the yield
rate (YR) for a production run. The more complex shapes
and finishes have lower yield rates than those that are less
complex. LG bumpers currently have a YR of about 95%,
while HG bumpers run about 92%.
Defective products can be worked on in-house, and
some can be recovered. For bumpers, the recovery rate
(RR) is about 5% of units started. Since the recovered
bumpers are brought up to an acceptable quality level, they
contribute toward meeting customer demand and put no
further demand on the conveyor capacity. The YR and RR
can be combined to determine how many products must be
processed to generate one unit of acceptable quality, which
is called the run factor (RF). The RF is equal to 1/(YR+RR).
If YR+RR=1, as with the LG bumper, then only one unit
must be put on the conveyor to ultimately yield one unit
of acceptable quality. The RF for the HG bumper is 103%
(computed as 1/(92% + 5%)), meaning PPS must paint 103%
of the total bumpers required to yield enough bumpers of
acceptable quality to satisfy customer demand.
Since the conveyor line is the constraint, the time a
product spends on the conveyor is an important issue. Line
speed can vary from 10 to 18 feet per minute, depending
on the size and shape of the product being painted. Mandy
considers 18 feet per minute to be the standard time unit
for the conveyor line. A complexity factor (CF) ranging
between 1 (for fastest line speed) and 1.8 (for slowest speed)
is determined for each product family and added to the
calculation of demand. The CF is computed by dividing
the standard line speed of 18 feet per minute by the line
speed required for the specific product, so a faster line speed
results in a CF closer to 1. The line speed of the HG bumper
is currently 12 feet per minute, resulting in an CF of 18/12
= 1.5. The CF is then multiplied by the RF to get the total
constraint demand factor (DF).
The DF is actually a demand placed on the conveyor per
unit of finished good of a particular part type. Because parts
can vary in shape and size, PPS needed a standard unit of
measure to compare product profitability that factored in the
total demand placed on the conveyor. The square footage
of each part was chosen as the measurement unit because
it represents the surface area of each part that’s coated. As
a result, the DF is divided by the total square footage of
a particular part (e.g., a bumper) to yield the bottleneck
demand factor (BDF), which is the demand factor per square
foot of a particular size, shape, and finish. The profit level
per square foot of finished good is divided by the BDF to
yield the profit per throughput unit (P/TU) on the conveyor.
Table 3 shows the LG bumper has a lower profit per unit
($10 per bumper, or $1 per sq. ft.), but after adjusting for the
respective demands on the conveyor, the LG bumper has a
higher P/TU.
DECISION POINT
Management of PPS used ABC to obtain a better
understanding of the “true” cost of the products in order
to help make better pricing decisions. Management now
wants to be more proactive in the use of costing information
to help develop and implement organizational strategy
in an environment where the demand exceeds current
productive capacity. Based on the opening question posed
by Amy, PPS’s management was attempting to move away
from merely trying to assign costs more accurately to using
the cost information to support strategic decision making.
Specifically, Amy wants to make strategic decisions about
which product lines to promote and pursue. She is aware of
the ABC process of assigning cost of resources to activities,
but considers this an operational rather than strategic
issue. She isn’t clear about whether ABC supports strategic
decision making.
Mandy pointed out that the conveyor line was being
fully utilized and jobs were being turned down because
of the capacity constraint. She thought the capacity issue
should drive any strategic decisions and that Amy should
adopt the principles of TOC and throughput costing for
strategic decision making. Mandy supported her position
with the following example. “HG bumpers are a big part
of production,” she said. “We evaluated whether or not
to increase the line speed when HG bumpers are being
painted. The increase in speed will reduce the yield rate
from 92% to 90%. There will be more defects, but the
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 02
RR will increase to 6%, and, as Table 3 shows, the P/TU
will increase and the finesse costs per unit would actually
decline.” (See Sidebar 2, “Finessing.”)
Chad disagreed with Mandy’s recommendation. Using
Table 1, Chad noted that the HG finishes have higher
reject rates, require additional painters, more colors, more
inspections and maintenance costs, and slower line speed.
The HG products are also treated as they pass through
Stations 3 and 4. Since some of the costs related to resource
demands are fixed costs, throughput costing shouldn’t be
used because these fixed costs would be ignored. He offered
an alternative, resource consumption accounting (RCA),
which he had heard about at a recent local IMA chapter
meeting. He thought RCA might be what Amy needed, but
he wasn’t entirely sure. Chad presented Amy with a brief
description of the costing method. (See Sidebar 3, “Basics of
RCA.”) He offered to learn more about RCA by attending
a continuing education session offered by IMA, but Amy
wanted more information before making the investment in
having Chad attend the session.
SUGGESTED RESOURCES
Chwen, Sheu, Ming-Hsiang Chen, and Stacy Kovar.
“Integrating ABC and TOC for Better Manufacturing
Decision Making.” Integrated Manufacturing Systems, May
2003, pp. 433-441.
Grasso, Lawrence P. “Are ABC and RCA Accounting
Systems Compatible with Lean Management?”
Management Accounting Quarterly, Fall 2005, pp. 12-27.
Keys, David, and Anton van der Merwe. “Gaining Effective
Organizational Control with RCA.” Strategic Finance,
May 2002, pp. 41-47.
Resource Consumption Accounting Institute website,
http://www.rcainstitute.org
van der Merwe, Anton, and David Keys. “The Case for
Resource Consumption Accounting.” Strategic Finance,
April 2002, pp 31-36.
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 03
ABOUT IMA With a worldwide network of nearly 60,000 professionals,
IMA is the world’s leading organization dedicated to
empowering accounting and finance professionals to drive
business performance. IMA provides a dynamic forum for
professionals to advance their careers through Certified
Management Accountant (CMA®) certification, research,
professional education, networking and advocacy of the
highest ethical and professional standards. For more
information about IMA, please visit www.imanet.org.
SIDEBAR 1: PPS’S PRODUCTION PROCESS
PPS operates two 8-hour shifts, 240 days per year. The paint
process involves a monorail conveyor line that moves at line
speeds of 10-18 feet per minute, depending on the application
and part complexity. The total paint cycle time is about 2.5
hours. The production schedule is created based on customer
requirements, line speed, minimum lot (or batch) size, and the
availability of racks. The material handlers bring the raw parts
and racks to the line and loaders rack each part, making sure
it is racked properly so that when it enters the E-coat tank a
proper electrical ground is attained.
THE PAINT PROCESS
The part is first treated with chemicals (pre-treatment
stage), a sequence of washing and rinsing to remove any
grease or dirt and to prepare the part for paint adhesion
with a phosphate spraying. Next, the part is submerged
in a 20,000-gallon e-coat tank. As it comes out of the tank,
it is sprayed with fresh, deionized water to rinse off any
“dragout” paint clinging to the parts, thereby eliminating
appearance defects. The part then moves through four paint
booths. Depending on the part type, however, all four booths
may not be used.
• Booth 1 has five automatic spray guns that apply primer.
A part may or may not receive a primer coating, which
provides additional protection against chipping and
rusting.
• Booth 2 has two manual sprayers as well as automatic
sprayers that paint basecoat or enamel topcoat.
• Booth 3 has one manual sprayer and an automatic spray
gun that apply clearcoat. Only high-gloss products receive
the glossy, shiny clearcoat finish.
• Booth 4 has two manual sprayers and automatic spray guns
that also apply clearcoat for parts that require two coats.
While low-gloss products are being painted, booth 3 and
booth 4 painters are idle and the spray guns are turned off. De-
pending on the product line, the part receives a basecoat (high
gloss) or an enamel topcoat (low gloss). After these processes,
the paint is cured in another oven. As the product arrives back
at the unload/load area, it is date-stamped, unracked onto a
floor conveyor, inspected, unloaded, and packaged.
THE SETUP PROCESS
A five-minute setup “gap” is required when changing paint
colors. This gives line workers the time to change the tooling
racks, modify the line speed, purge the line of the old paint,
and run the new paint through the system.
As the setup gap nears the paint booths, paint containers
with the required colors are transported to the paint booth.
While the last part from the prior color is painted, the paint
lines are quickly purged of the old paint, flushed with solvents
to clean the paint lines, and new paint is sprayed through the
spray guns to obtain the desired consistency. As the gap ends
and the raw parts appear, the painting begins again.
QUALITY ASSURANCE OR REWORK PROCESS
The primary sources of rejections are: dirt and dust in the
manual hand sprayers, old equipment, and the nature of
the industry. High-gloss products, which are much more
expensive to reprocess, have substantially higher rejection
rates than low-gloss products.
Rework mostly requires sanding. The product is sanded
down to the e-coat primer and then moved to the line for
reprocessing. Some products are sent to an outside stripper.
Some defects can be corrected by finessing, which elimi-
nates the need for complete reprocessing. Finessing allows
the defect to be buffed out on parts that have the clearcoat
glossy finish. Parts are considered “saved” when they can be
unloaded along with the other painted good parts.
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 04
SIDEBAR 2: FINESSING
Currently PPS finesses approximately 100,000 bumpers per
year, or about 5% of bumpers run on the conveyor. If the line
speed is increased, the decline in the yield rate would create
about 20,000 additional bumpers that the finesse department
could work on. The finesse department can handle 125,000
units per year when operating at maximum efficiency, and
the variable costs for finesse are less than $0.02 per unit, so
the increase in units worked wouldn’t generate much change
in the total costs even though the computed cost per unit
does change. The table provides the supporting detail.
Finesse Cost Per Unit at Various Defect Levels
Annual Cost Units Cost Per Unit
Current Defect Level $480,000 100,000 $4.800
Defect Level with
Increased Line Speed $480,400 120,000 $4.003
Practical Capacity to
Handle Defects $480,500 125,000 $3.844
SIDEBAR 3: BASICS OF RCA
Resource consumption accounting (RCA) is based on costing
methods developed by German companies and the activity
costing philosophy of ABC. RCA takes a resource-based
view of an organization and looks closely at the quantity of
resources consumed and the underlying nature of the cost
of those resources. Some of the key characteristics of RCA
are the treatment of idle capacity, the use of costs other than
historical, and the ability to group and track cost information at
various levels. This comprehensive management accounting
system can lead to improved decision support by providing
more accurate product costs and a better understanding of the
interrelationships between processes and costs.
Table 1 Summary of Items Affected by the Need for High- or Low-gloss Finish on a Bumper
High Low Gloss Gloss
Rejection Rate high low
Number of Colors high low
Batch Size low high
Number of Painters high low
Table 2 Number of Products That Had Changes in Calculated Profit Margin from Standard Costing to ABC
Negative Margin Positive Margin
3 became more negative 5 became more positive
7 moved from negative to positive
1 became less negative 10 became less positive
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 05
(P/TU) Adjusted Product (BDF) Profit per Complexity Demand Sq. Ft. per Bottleneck Profit per Throughput Yield Recovery Run Factor Factor Factor Unit of Demand Unit of Unit Profit Rate Rate (RF) = (CF) (DF) Product Sq. Ft. Finished per Sq. Ft. Product (YR) (RR) 1/(YR + RR) Speed = 18/speed = (RF x CF) (Sq. Ft.) = (DF/Sq. Ft.) Product /BDF
Compare Two Bumper Finishes
Low-Gloss Bumper 95% 5% 100% 15 1.20 1.20 10 .120 $10.00 $8.33
High-Gloss Bumper 92% 5% 103% 12 1.50 1.55 10 .155 $12.00 $7.76
Evaluate a Process Change
Current Process High-Gloss Bumper 92% 5% 103% 12 1.50 1.55 10 .155 $12.00 $7.76
Change Speed and YR 90% 6% 104% 13 1.38 1.44 10 .144 $12.00 $8.32
Table 3 Using Capacity Demand to Rank Profitability
I M A E D U C AT I O N A L C A S E J O U R N A L V O L . 3 , N O . 3 , A R T. 3 , S E P T E M B E R 2 0 1 06
Receive raw (unpainted)
bumpers, luggage racks, etc.
Move to raw material storage
Receive customer release
Load, release, run MRP
Physical count of paints
Yes
Yes
Yes
No
No
No
Order paint, recieve into paint
storage area
Paint available?
Good part?
Schedule production
Run production
Pull paint racks
Hang paint racks
Pretreat/wash dry
Ecoat tank
Ecoat oven cure/bake
Adjust line speed for painters
Booth 1 primer
Booth 2 basecoat/enamel
top coat
Booth 3 clearcoat
Booth 4 clearcoat
Paint oven cure/bake
Ecoat Inspection
Finesse part (save)
Reject part
Unload finished parts
Unload paint racks
Transfer to finish goods storage, ship
Can defect be buffed out?
Figure 1 Diagram of the production process