Traffic Jams in London
CASE STUDY 11‐2 Dealing with Traffic Jams in London
As London entered the 21st century, it confronted a major issue that plagues many cities
throughout the world—excessive automobile traffic. Many Londoners—particularly the business
community—rated traffic congestion as the city’ s most serious problem. At peak periods, the
average speed was less than 10 miles per hour, a slower speed than the horse‐drawn carriages of
previous centuries. Drivers spent about half their time waiting in traffic. This congestion nightmare
was not only a major source of driver frustration but also a contributor to both environmental and
economic problems. By one estimate, traffic‐related problems cost London businesses roughly £2
million—more than $3 million—every week. Clearly, the city needed an aggressive policy to
address this issue.
The solution, proposed by the government study Road Charging Options for London
(ROCOL) authorized by the 1999 Greater London Authority Act and endorsed by incoming mayor
Ken Livingstone, was congestion charging. As the name suggests, the city would assess a fee, or
charge, on every automobile that entered high‐traffic sections of London during peak hours.
Rather than attempt a broad citywide implementation, the government focused specifically
on the highly congested section of central London where roughly 1 million people entered every
day, about 150,000 of them by private automobile. Beginning in February 2003, drivers who
entered this area between 7 a.m. and 6:30 p.m. had to pay a fee of £5 (roughly $8) by midnight.
The fee has steadily increased over the years, and by 2014 it had increased to £11.50 (roughly
$18). Certain types of vehicles, such as ambulances, buses, and taxis, are exempt. Drivers have the
option to pay the charge by mail (prepay), text messaging, telephone, or in person at various pay
points. Failure to pay the fee results in a fine of £130 (roughly $200).
Significantly, this solution makes extensive use of current technologies. From the start, the
city installed almost 700 cameras at more than 200 sites in the designated high‐traffic area to
photograph the license plates of every vehicle that entered the area. The city transmitted these
photos to a data center that translated the photographic images into license plate numbers utilizing
automatic number plate recognition technology. Drivers who failed to pay the fee received a notice
of the fine in the mail. To create and implement the congestion charge plan, the government had a
number of project risks:
• Tight schedule: The project needed to be completed under tight deadlines in order to meet
multiple statutory requirements and minimize disruptions to commuters.
• Technology: The cameras had to be strategically placed in order to accurately photograph tens
of thousands of license plates every day.
• Lack of pre‐existing models: There were no pre‐existing models in the world to follow. • Limited
experience and expertise: Livingstone had been recently elected mayor, and the supervising
governmental
agency—Transport for London—had only recently been created. Thus, neither was experienced
in building such a system.
• Political fallout: The political risk of a system failure to Livingstone was so huge that it would
be extremely damaging to his career.
Transport for London adopted a series of management strategies to navigate these waters
and limit the risks resulting from its limited experience, IT ability, and management time. Perhaps
the most significant decision was to outsource the basic management activities to firms that
specialized in these areas. For example, PricewaterhouseCoopers first and then Deloitte & Touche
were contracted to manage the competitive bidding process. Early in the project, project managers
identified the critical technical elements and divided the project into five “pack-ages” that could,
if required, be bought and managed separately. These included:
(1) the camera component,
(2) the so‐called image store (storage) component that collected images, converted them into
license numbers, and condensed the images (duplicates would occur when one vehicle was
photographed by several cameras),
(3) the telecommunications links between the cameras and the image store component,
(4) the customer services infrastructure, including the ability to pay by phone, Web, and mail, and
(5) an extensive network of retail outlet kiosks and gas stations where people could pay the toll.
The retail (driver’ s) side of the system was seen as such a big risk that it was bought and
managed separately. To further reduce the risks, it was decided to select the best available
technologies for each of the five packages. Another risk‐aversive move was to utilize only
established technologies for the actual process of identifying the vehicles in the designated zone.
For example, Transport for London rejected proposals to employ electronic tags because this
technology had not been proved effective in scenarios such as this one. Finally, the city added
roughly 200 buses to its fleet to accommodate increased ridership. Transport for London requested
bids on the project early in 2001. The estimated $116.2 million project was large enough to require
listing in the European Union’ s public sector register. Companies throughout Europe were
allowed to bid on it. Separate bids could be tendered for the camera and communications packages
whereas the remaining three packages could receive bids on a combined basis or individually.
Deloitte & Touche reviewed more than 40 bids before deciding on a single contractor to
manage the entire program. Its choice was The Capita Group, England’ s largest business process
outsourcing firm. Significantly, before accepting Capita’ s bid, Deloitte & Touche required both
that firm and the other final candidate to submit technical design studies. In addition, Capita’s
contract included penalties if the company failed to meet the established deadlines.
After awarding the contract to Capita, Deloitte & Touche closely monitored every step of
the process, and it kept additions to the original plan to a minimum. As a result, scope creep—the
process whereby a project increases in both size and costs as new features are added—was never
a serious issue.
One of the few changes added to the requirements was an option for motorists to pay fees
through the popular SMS text‐messaging format. Throughout the implementation of the new
system, the city continually sought feedback from key stakeholders. In addition, it regularly
updated the public concerning the project’s status.
Consequently, few drivers were caught unaware when the new policy went into effect on
February 17, 2003. The mayor also wisely decided to begin operations during a school holiday
period when traffic volumes would be significantly lower. Thus, by the time traffic returned to
normal, drivers generally had adapted to the new procedures. What were the results of these
concerted efforts? Unlike so many systems projects, London’ s congestion charging plan was
completed on time and within budget. Significantly, however, the demanding schedule did not
compromise the quality of the work. Instead, five months after it was begun, the new program
appeared to have achieved its basic goals when a follow‐up study.
improved. A 10‐year study found sustained reductions in central London, averaging 23% over the
longer period. (59) indicated that traffic in central London had diminished by as much as 20%, and
average driving speeds had.
The fines and fees resulted in a project payback period of about one and one‐half years. It
was estimated that total revenues would amount to $2.2 billion over a 10‐year period. Moreover,
vehicular emissions of toxic substances such as nitrogen dioxide were also reduced. However, a
study found it difficult to determine the precise causes of London’ s decreased emissions bet-ween
2003 and 2011. Because half of the European Union’s automobiles have diesel engines, nitrogen
dioxide levels might have fallen further if Volkswagens had proper emission controls. One
potential problem that did not emerge was “rat runs” in which traffic jams would appear in areas
outside the zone as drivers altered their routes to avoid the charges. After reviewing the outcomes
of the London program, many observers predicted that congestion charging would become a
standard practice in cities throughout the world.
Discussion Questions:
1. Assess the risks of this project. Given your assessment of the project complexity, clarity,
and size, what management strategies would you recommend for it? What, if any, of
these strategies were adopted in this project?
2. Describe the development methodology that was applied to this project. Was this the
most appropriate approach? Provide a rationale for your response.
3. When a project is outsourced, who should manage the project—the internal group or the
outsourcer? Why?
Sources: Ken Livingstone , “The Challenge of Driving through Change: Introducing Congestion Charging in
Central London,” Planning Theory and Practice 5, no. 4 (December 2004), 490–98; Bradford Wernie , Wim Oude
Weernink, and Sylviane de Saint‐Seine, “The World Watches As London Tries to End Congestion,”
AutomotiveNewsEurope 8, no. 2 (January 27, 2003) 3–4; Malcolm Wheatley , “How IT Fixed London’ s Traffic
Woes,” CIO 16, no. 19 (July 15, 2003), http://www.cio.com/article/2439968/it‐organization/how‐technology‐fixed‐
london‐s‐traffic‐woes.html (accessed September 3, 2015) ; “Transport for London Study: Public and Stakeholder
Consultation on a Var-iation Order to Modify the Congestion Charging Scheme: Impact Assessment” (January
2014), https://consultations.tfl.gov.uk/roads/ cc‐changes‐march‐2014/user_uploads/cc‐impact‐assessment.pdf
(accessed September 3, 2015).
Pearlson, K. E., Saunders, C. S., Galletta, D. (2015). Managing & Using Information Systems,
6th Edition. [[VitalSource Bookshelf version]]. Retrieved from vbk://9781119255215