Shoreline Case

profilereverendany
Case_Study_Shoreline_Stadium_Instructions11.docx

BUSI 680

Case Study: Shoreline Stadium Instructions

Read the Shoreline Stadium Case on pp. 204–205. Considering the information provided, construct a Risk Response Matrix (see text p. 220) that details at least 3 risk events that are likely for this case, your responses to the risks, contingency plans, triggers, and the responsible party for each risk event. Then, using Microsoft Project, create a Gantt chart that details the project schedule (see Table 6.3 p. 205 for task details). Once the chart is created, answer the questions on p. 204 in the format described below. The student is to submit two documents.

1. The first document is a paper completed in Microsoft Word that follows current APA format.

2. The second document is the Microsoft Project file, which is also required.

The paper is to include at least 3 resources (the text and at least 2 peer-reviewed sources) and total of 5–6 pages while including the following:

The paper is to include at least 3 resources (the text and at least 2 peer-reviewed sources) and total of 5–6 pages while including the following:

1. Title page.

2. Project Summary (2–3 pages), including an introduction to the project and recommendations (based on questions 1–3 from p. 204). For this assignment, include research-based rationale for your answers; be sure to include a discussion of possible risks as well as the date the project is scheduled to be completed.

3. Appendix: One-page Risk Response matrix.

4. Reference page.

The Case Study: Shoreline Stadium is due by 11:59 p.m. (ET) on Friday of Module/Week 8.

BUSI 680

C

ASE

S

TUDY

:

S

HORELINE

S

TADIUM

I

NSTRUCTIONS

Read the

Shoreline

Stadium Case on pp.

204

205

. Considering the information provided,

construct a Risk Response Matrix (see text p.

220

) that details at least 3 risk events that are likely

for this case, your responses to the

risks, contingency plans, triggers, and the responsible party

for each risk

event. Then, using Microsoft P

roject, create a Gantt

chart

that details the projec

t

schedule (see Table 6.3 p. 205

for task details). Once the chart is created, answer the questio

ns

on p.

204

in the format described below.

The student is to submit

two docu

ments

.

1.

The

first

document is

a

paper completed in Microsoft Word that follows current APA

format.

2.

The second document is the Microsoft Project file, which is also required.

The paper is to include at least 3

resources (the text and at least

2

peer

-

reviewed

sources) and

total

of

5

6

pages

while including

the following:

The paper is to include at least 3 resources (the text and at least

2

peer

-

reviewed

sources) and

total of

5

6

pages

while including

the follow

ing:

1.

Title page

.

2.

Project Summary (2

3 pages), including an introduction to the project and

recommendations (based on questions 1

3

from p. 204

). For this assignment,

include

research

-

based rationale for your answers

;

be sure to include a discussion of poss

ible

risks

as well as

the date the project is scheduled to be completed.

3.

Appendix

: One

-

page Risk

Response

matrix

.

4.

Reference page

.

The Case Study:

Shoreline

Stadium is due by 11:59 p.m. (ET) on

Friday

of Module/Week 8.

BUSI 680

CASE STUDY: SHORELINE STADIUM INSTRUCTIONS

Read the Shoreline Stadium Case on pp. 204–205. Considering the information provided,

construct a Risk Response Matrix (see text p. 220) that details at least 3 risk events that are likely

for this case, your responses to the risks, contingency plans, triggers, and the responsible party

for each risk event. Then, using Microsoft Project, create a Gantt chart that details the project

schedule (see Table 6.3 p. 205 for task details). Once the chart is created, answer the questions

on p. 204 in the format described below. The student is to submit two documents.

1. The first document is a paper completed in Microsoft Word that follows current APA

format.

2. The second document is the Microsoft Project file, which is also required.

The paper is to include at least 3 resources (the text and at least 2 peer-reviewed sources) and

total of 5–6 pages while including the following:

The paper is to include at least 3 resources (the text and at least 2 peer-reviewed sources) and

total of 5–6 pages while including the following:

1. Title page.

2. Project Summary (2–3 pages), including an introduction to the project and

recommendations (based on questions 1–3 from p. 204). For this assignment, include

research-based rationale for your answers; be sure to include a discussion of possible

risks as well as the date the project is scheduled to be completed.

3. Appendix: One-page Risk Response matrix.

4. Reference page.

The Case Study: Shoreline Stadium is due by 11:59 p.m. (ET) on Friday of Module/Week 8.