Week 7 Final Project BUSN 420

profilek.warren5
BUSN420_FinalProjectGradingRubric.pdf

Possible Points Actual Points

The data entered into the Excel

worksheet matches the data

presented in Figure T11.3

The data entered into the Excel

worksheet does not match the

data presented in Figure T11.3 10 10

The first legend entries (series)

contains the Start Date for the series

name and the Start Dates data for the

series values.

The first legend entries (series)

contains a different field other

than the Start Date field for the

series name and series data.

5 5

The second legend entries (series)

contains the Duration (Days) for the

series name and the Duration (Days)

data for the series values.

The second legend entries

(series) contains a different field

other than the Duration (Days)

field for the series name and the

series data.

5 5

The horizontal (category) axis labels

have been added from the task

column.

The horizontal (category) axis

labels do not represent the

tasks listed in the task column. 5 5

The Gantt chart is in a 2-D stacked

horizontal bar chart format.

The Gantt chart is not in a 2-D

stacked horizontal bar chart

format. 5 5

The legend has been deleted from the

chart.

The legend appears in the

chart. 5 5

The start date chart field has no fill

and no border, as illustrated in Figure

T11.5.

The start date chart field is filled

in and has a border. 5 5

The task categories appear in reverse

order on the y-axis of the Gantt chart,

as illustrated in Figure T11.6.

The task categories do not

appear in reverse order on the y-

axis of the Gantt chart as

illustrated in Figure T11.6.

5 5

45 45

Possible Points Actual Points

The Gantt Chart has been properly

constructed.

The Gantt Chart has not been

properly constructed. 10 10

The Gantt chart clearly identifies 15 or

more steps involved in the process

identified.

The Gantt chart does not clearly

identify 15 or more steps

involved in the process

identified.

10 10

Gantt Chart

BUSN 420 Final Project Grading Rubric (100 points)

Using Gantt Charts to Solve a Problem

Comments:

The Gantt chart clearly identifies the

tasks, resources, and timeframes

involved in completing the project.

The Gantt chart does not clearly

identify the tasks, resources,

and timeframes involved in

completing the project. 5 5

The Gantt chart clearly identifies a

clear and understandable solution for

the project.

The Gantt chart does not clearly

identify a clear and

understandable solution for the

project.

5 5

The student has provided a robust 400

to 600-word analysis of their Gantt

chart experience with evidence that

they had someone else review their

Gantt chart.

The student has not provided a

robust 400 to 600-word analysis

of their Gantt chart experience

with evidence that they had

someone else review their Gantt

chart.

10 10

The student has supported their text

with at least one peer-reviewed

scholarly journal reference.

The student has not supported

their text with at least one peer-

reviewed scholarly journal

reference.

5 5

Spelling, punctuation, APA formatting,

and grammar are stellar.

Spelling, punctuation, APA

formatting, and grammar are

poor. 10 10

55 55

100 100Final Score:

Overall Comments:

Comments:

Late deductions (e.g., -10):