BUS375WK4ActivityTemplate-ProjectResourcesandBudget-Spreadsheet.xlsx

Instructions

Week 4 Activity - Project Resources and Budget Instructions: Carefully look through the "Sample" tab. Pay close attention to the amount of detail included, and the formatting and organization of the list. You will use this sample list as a guide to create your own list of resources. Navigate to the third tab titled, "Blank Template - Fill This In" and complete the following: 1. In the “Resources” column, outline a plausible list of resources, goods, and services needed to complete your chosen project. Include at least five resources in your list. 2. In the “Type” column, assign each resource a type. Include at least two different types in your list. You may categorize each resource using the same types as in the Sample tab or utilize your own. 3. In the “Cost” column, estimate appropriate costs for each resource. Though these figures are hypothetical estimates, they should relate to each other and be proportional. . Then, in the fourth tab titled, "Sources," list your resources in proper SWS style.

Sample

Project Resources and Budget Developed by John Smith August 2022
Resource Type Cost
Foundation Contractor Labor $10,000.00
Framing Contractor Labor $10,000.00
Roofing Contractor Labor $5,000.00
Windows Contractor Labor $2,500.00
Doors Contractor Labor $2,500.00
Bricks Contractor Labor $5,000.00
Siding Contractor Labor $5,000.00
Insulation Contractor Labor $5,000.00
Drywall Contractor Labor $5,000.00
Plumbing Contractor Labor $5,000.00
Electrical Contractor Labor $10,000.00
HVAC Contractor Labor $5,000.00
Cabinet Contractor Labor $2,500.00
Flooring Contractor Labor $2,500.00
Appliances Contractor Labor $2,500.00
Driveway/Sidewalk Contractor Labor $2,500.00
Fencing Contractor Labor $2,500.00
Deck Contractor Labor $2,500.00
Landscaping Contractor Labor $2,500.00
Government Inspector Labor $500.00
Inspection Resolvers Labor $500.00
Cleaning Service Labor $500.00
Lumber Materials $100,000.00
Bricks Materials $50,000.00
Windows Materials $10,000.00
HVAC Equipment $10,000.00
Appliances Equipment $20,000.00
Fence Equipment $10,000.00
Deck Equipment $10,000.00
Flooring Materials $10,000.00
Bathroom / Kitchen Fixtures Equipment $10,000.00
Cabinets Equipment $5,000.00
$324,000.00

Blank Template - Fill This In

Project Resources and Budget Developed by Tashina Tupai Date October 31, 2022
Resource Type Cost
Contractors
Plumber Labour $2,700
Electrician Labour $1,800
Painters Labour $900
Drywall installation Labour $3,200
Interior designer Labour $10,000
Flooring Labour $1,900
Insulation Labour $6,300
HVAC Labour $2,700
Fixtures materials $3,200
Light fixture materials $300
Vanity/Sinks (4) materials $3,000
Countertops materials $1,500
Doors and Windows materials $1,500
Paint materials $200
Mirrors (8) materials $4,000
Plumbing materials $2,000
Lotion Bottles (4) materials $800
Doors and Windows materials $2,000
$ 48,000.00

Sources

Sources
Tom Grupa. July 5, 2021. How much does it cost to remodel a bathroom? https://www.homeguide.com/costs/bathroom-remodel-cost#breakdown