CHAPTER 7

Project Communication Management

Projects require teamwork, and team members must communicate with each other in a variety of ways. The documents they produce must be collected, distributed, and stored in an appropriate manner to assure timely and accurate communication between team members. This process is often assisted by a variety of technologies and computer software products. Communication tech- nology can facilitate faster and better communication, or it can become a barrier if the technologies are not well understood and applied appropriately.

7.1 Project Communication Plan

Learning Objectives

1. Describe the importance of a project communication plan.

2. Identify the elements of a project communications plan.

The project communication plan defines the information that is important to project performance and identifies the methods and processes for creating the most efficient and effective communica- tion. Appropriate communications, as defined in the communication plan, is critical to both project success and the perception of project success (Diallo & Thuillier 2005).[1] The information needed on a project varies significantly depending on the project profile. Most projects will develop per- formance reports based on cost, schedule, quality, and risk. The amount of detail and the method of distribution will also vary depending on the complexity level of the project. The following ques- tions provide a good basis for developing a project communication plan.

• What information needs distributing?

• Who needs the information?

• When is it needed?

• Where should the information be stored?

• What format should be used?

• How information can be retrieved.

• Time zone, cultural implications, language, etc.

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Your communication plan should consider the following:

1. Stakeholder Analysis and Management Strategy that Defines Preferred Communications Methods

Based on the project stakeholder analysis, the communication management plan includes any special communication needs of stakeholders with high influence.

2. Communication Matrix

The communication matrix includes the information needed by the project team to effectively disseminate information to the appropriate project stakeholders. Below are two examples of project communication matrices.

FIGURE 7.1 Communication Matrix/Receiver Based

200 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.2 Communication Matrix/Object Based

Escalation Paths

Communicating to the project leaders anomalies or problems that arise on the project is essential to making timely decisions and aggressively supporting project schedule and cost goals. Developing an escalation path or decision-making matrix helps the project team understand and manage the communication of issues and concerns to appropriate management of the project. Tables of this type provide an opportunity for discussion of the project priorities, decision-making guidelines, and the importance of quickly addressing issues or concerns that emerge on the project.

FIGURE 7.3 Communication Escalation

Constraints

Project communication constraints address any barriers to successful communication of the pro- ject.

Chapter 7 Project Communication Management 201

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Potentials constraints to project communications could include language barriers, cultural differences, and communication technology issues. For example, on complex projects or global pro- jects with team members representing more than one language, it is important to address the language of important documents and procedures for translating documents and communications as needed on the project. On a project in South America, members of the project worked in a culture that highlighted good news and hid bad news or any information that indicated that the project was behind schedule. The project leadership addressed this constraint to communications by con- ducting more frequent review meetings.

Roles; Relative to Project Communications

Developing the communications roles of project team members on complex projects develops a higher degree of confidence in the communication process. This can be added to existing roles and responsibility charts or developed as a separate chart.

Team Directory

The development of a team directory aids in quick and accurate communications. Update the pro- ject directory on a frequent basis.

FIGURE 7.4 Team Directory

Escalation Paths

Communicating to the project leaders anomalies or problems that arise on the project is essential to making timely decisions and aggressively supporting project schedule and cost goals. Developing an escalation path or decision-making matrix helps the project team understand and manage the communication of issues and concerns to appropriate management of the project. Tables of this type provide an opportunity for discussion of the project priorities, decision-making guidelines, and the importance of quickly addressing issues or concerns that emerge on the project.

202 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Key Takeaways

• Appropriate project communications is important to both project success and the perception of project success.

• The project communication plan defined the information to be communicated and the meth- ods and processes for communicating on a project.

• The composition of the project communication plan depends on the project profile.

• The project communication plan typically includes:

• stakeholder analysis

• communication matrix

• escalation paths

• constraints

• roles

• team directory

Exercises

1. Two examples of communication matrixes are _______________ and ________________.

2. Based on a project with which you are familiar, what would you include in the project com- munication plan? Justify each component.

3. List three possible communications constraints.

7.2 Types of Communication Technology

Learning Objectives

1. Identify characteristics and examples of synchronous communication.

2. Identify characteristics and examples of asynchronous communication.

3. Identify questions to answer when considering new communications technologies.

Completing a complex project successfully requires good communication among team members. If those team members work in the same building, they can arrange regular meetings, simply stop by each other’s office space to get a quick answer, or even discuss a project informally at other office functions. Many projects are performed by teams that interact primarily through electronic com- munication and are, therefore, called virtual teams.[2] To avoid miscommunication that can harm trust and to include team members in a project culture, the project team needs a plan for com- municating reliably and in a timely manner. This planning begins with understanding two major categories of communication.

Chapter 7 Project Communication Management 203

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.5 Video conferencing by laptop.

© 2010 Jupiterimages Corporation

Synchronous Communications

If all the parties to the communication are taking part in the exchange at the same time, the communication is synchronous. A telephone conference call is an example of synchronous com- munication. When the participants are not interacting at the same time, the communication is not synchronous, or asynchronous.

The following are examples of synchronous communications:

• Live meeting. Gathering of team members at the same location.

• Audio conference. A telephone call between two individuals or a conference call where several people participate.

• Computer-assisted conference. Audio conference with a connection between computers that can display a document or spreadsheet that can be edited by both parties.

• Video conference. Similar to an audio conference but with live images of the par- ticipants. Some laptop computers have built-in cameras to facilitate video conferencing, as shown in Figure 7.5.

• IM (instant messaging). Exchange of text or voice messages using pop-up win- dows on the participants’ computer screens, as shown in Figure 7.6.

FIGURE 7.6

Instant messaging pop-up window.

204 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.7 Texting via cell phone.

© Shutterstock

personal digital assistant (PDA)

Device that holds a calendar, a contact list, a task list, and other support programs.

• Texting. Exchange of text messages that are 160 characters or fewer between mobile phones, pagers, or personal digital assistants (PDAs)—devices that hold a calendar, a contact list, a task list, and other support programs. See Figure 7.7.

Time Zones

The worldwide communication network makes it possible to assemble project teams from anywhere in the world. Most people work during daylight hours, which can make synchronous meetings difficult if the participants are in differ- ent time zones, where they start, end, and take meal breaks at different times. It can be an advantage in some circumstances. For example, if something must be done by the start of business tomorrow, team members in Asia can work on the problem during their normal work hours while team members in North America get some sleep.

FIGURE 7.8 World time zones.

© 2010 Jupiterimages Corporation

As the earth turns, the sun appears to move across the sky from east to west. Local noon occurs when the sun is at its highest position in the sky. Cities and countries to the north or south of each other all observe local noon at the same time. For example, noon in New York occurs at the same time as it does in Bogotá, Colombia, in South America. Be aware that many well-educated people in the United States think of South America as directly south of North America. As you can see in Figure 7.8, most of South America is one or two time zones east of the United States.

To prevent confusion between a.m. and p.m., times are given using a twenty-four-hour clock. Noon is 12:00 and 1 p.m. is 13:00, and parts of an hour are divided by colons. For example, 13:25:21 is thirteen hours, twenty-five minutes, and twenty-one seconds.

Chapter 7 Project Communication Management 205

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Greenwich Mean Time (GMT)

Time zone system historically based on the naval observatory at Greenwich, England.

Universal Time (UT)

Time zone system that is compatible with GMT but without the historical reference.

telefacsimile (fax) machine

Device that scans a document and converts it to electronic signals that can be transmitted by telephone to another fax machine, which can reproduce the original document.

facsimile

A duplicate (see telefacsimile).

Local Time

Local time is compared to the time zone that is centered at the historically significant naval obser- vatory at Greenwich, England. The time at that location is Greenwich Mean Time (GMT). More recent references use UT for Universal Time (UT) instead of GMT.

Conference Call between New York and Paris

A project manager in New York is five time zones west of the reference zone, so the time is given as UT –5 (or GMT –5). If it is noon in the reference zone, it is 7 a.m. (five hours earlier) in New York. The manager would like to contact a project team member in Paris, France. Paris is one time zone west of the reference zone (UT +1 or GMT +1). If it is noon (12:00) in the reference zone, it is 13:00 (1 p.m.) in Paris.

This means that there is a six-hour difference between New York and Paris. If the project manager waits until after lunch to place the call (1 p.m. in New York), it might be too late in the day in Paris (7 p.m.) to reach someone.

Asynchronous Communications

Getting a team together at the same time can be a challenge—especially if they are spread out across time zones. Many types of communication do not require that the parties are present at the same time. This type of communication is not synchronous; it is asynchronous. There are several choices of asynchronous communications.

Mail and Package Delivery

Many companies prefer that final contracts are personally signed by an authorized representative of each party to the agreement. If several signatures are required, this can take weeks to get all the signatures if the contracts are transferred by the postal service. If this process is holding up the start of the project, you can use an overnight delivery service to minimize the time spent transfer- ring the documents.

Fax

A telefacsimile (fax) machine is a device that scans a document one narrow band at a time, con- verting it into tones that can be conveyed over traditional telephone lines to a receiving device that reproduces a facsimile—exact duplicate—of the document. A fax machine typically has a paper feeder that can be used for feeding multiple-page documents, a telephone key pad and handset, and a status display, as shown in Figure 7.9.

206 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Group 3 fax machine

Model of fax machine that uses digital scanning and data compression.

FIGURE 7.10 Multifunction printer, scanner, fax, and copier.

© 2010 Jupiterimages Corporation

FIGURE 7.9 Fax machine.

© 2010 Jupiterimages Corporation

Transmission rates of fax machines are typically limited by the use of traditional telephone lines. The data transmission uses the same method as a dial-up computer modem. A Group 3 fax machine has a maximum data rate of 14.4 kilobits per second (Kbps), but if the phone connection is poor, it will drop down to lower speeds automatically until it can establish a reliable connection between machines.

The Group 3 fax machine digitizes data in a form that is compatible with computers and the fax function is often integrated with other computer functions. A multifunction device, such as the one shown in Figure 7.10, can scan a document and save it as an image, send it as a fax, or print mul- tiple copies.

Fax machines have been around a long time and enjoy a high level of trust for transmitting documents accurately. In many countries, a fax of a signed contract is legal, but a computer- scanned image is not.

Electronic Mail

Electronic mail (e-mail) is widely used to coordinate projects and to communicate between team members. It has several valuable characteristics for project management:

• Copies can be sent to a list of team members.

• A preconference-call e-mail can list the agenda items of the conference call.

• A postconference e-mail can summarize the results of the discussion on each topic.

• Messages can be saved to document the process in case of a misunderstanding or miscommu- nication.

• Files can be attached and distributed.

Chapter 7 Project Communication Management 207

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

web log

Online personal journal.

Really Simple Syndication (RSS)

Communications technology that allows news to be sent to a computer screen.

FIGURE 7.11 Link to RSS Feed on a Web Page Link to RSS feed on a web page.

© Shutterstock

Project Log and Web Log (Blog)

A web log is typically called a blog. It is an online journal that can be private, shared by invitation, or made available to the world. Some project managers keep a journal in which they summarize the day’s challenges and triumphs and the decisions they made. They return to this journal at a later date to review their decision-making process after the results of those decisions are known to see if they can learn from their mistakes. Many decisions in project management are made with incom- plete knowledge, and reflecting on previous decisions to develop this decision-making skill is important to growth as a project manager.

Really Simple Syndication (RSS)

Some projects are directly affected by external factors such as political elections, economic trends, corporate mergers, technological or scientific breakthroughs, or weather. To keep informed about these factors, you can subscribe to online news sources. A method that facilitates this process is Really Simple Syndication (RSS). To use an RSS feed, team members download a free news reader on the Internet. Web pages with RSS news feeds have labeled links, as shown in Figure 7.11.

If the user clicks on the RSS feed, news from the website is automatically sent to the user’s news reader. The news reader can be set to filter the news for key words to limit the stories to those that are relevant to the project.

The following are examples of asynchronous communications:

• Mail and package delivery. Transfer of objects and contracts that need signatures.

• Fax. Document transmittal over telephone. Facsimiles are accepted for some documents.

• Electronic mail (e-mail). Text messages with attachments can be distributed and managed by computer programs.

• Web log (blog). An online journal may be used to record events, thoughts, and lessons learned.

• Really Simple Syndication (RSS). News feeds that push relevant content to a reader to keep the manager informed of new events that could affect the project.

Assessing New Communication Technologies

New technologies for communicating electronically appear with increasing frequency. Using a new technology that is unfamiliar to the team increases the technology complexity, which can cause delays and increase costs. To decide if a new technology should be included in a communications plan, seek answers to the following questions:

• Does the new communication technology provide a competitive advantage for the project by reducing cost, saving time, or preventing mistakes?

• Does the project team have the expertise to learn the new technology quickly?

• Does the company offer support such as help desk and equipment service for new communi- cation technology?

• What is the cost of training and implementation in terms of time as well as money?

Key Takeaways

• Synchronous communications take place when all the parties are present at the same time. Examples are telephone calls and video conferencing.

208 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

• Asynchronous communications take place when the parties are not present at the same time. Examples are e-mail, fax, package delivery, blogs, and RSS feeds.

• Determine if a new technology can save time, reduce cost, or prevent mistakes and if the increased complexity can be handled by the team and support staff for an affordable cost in time and money.

Exercises

1. Communications methods that do not require both parties to participate at the same time are called _______________.

2. A telephone call is an example of __________ communication.

3. An exchange of e-mail messages is an example of _______________ communication.

4. A __________ is an online journal used to share an individual’s thoughts and experiences.

5. A video conference is an example of _____________ communications.

6. What are two examples of synchronous communications technologies that you have used?

7. What are two examples of asynchronous communications technologies that you have used?

8. What is a virtual team?

9. Where is the reference time zone and why is it sometimes referred to as both GMT and UT?

10. Why are fax machines still used for legal documents?

Internalize your learning experience by preparing to discuss the following.

If you were managing a functional team that included people from three other countries, which synchronous communications technologies would you include in your communications plan and for what purposes? Which asynchronous technologies would you use and for what purposes? What new technologies would you consider?

7.3 Selecting Software

Learning Objectives

1. Identify the types of software that are appropriate for projects of low complexity.

2. Identify the types of software that are appropriate for projects of medium complexity.

3. Identify the types of software that are appropriate for projects of high complexity.

4. Describe strategies for sharing documents that can be edited by a team.

Part of a communications plan is determining the type of computer software that will be used to create documents, spreadsheets, diagrams, and reports. The choice of software is related to the com- plexity of the project.

Simple Projects

Basic projects can be managed using some of the features available in general purpose software that is available in most offices.

Chapter 7 Project Communication Management 209

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Word Processing

Even the most basic project will generate numerous documents using word processing software. A communications plan can specify standards for these documents that makes it easier to create, edit, combine, store, and retrieve the documents. Document standards include the following:

• Specifying the file format

• Using templates for commonly used forms

File Format

Word processing software programs display a document on a computer’s screen and allow the user to enter and edit text. When the file is saved to a storage device, the text and all the various format- ting such as font and font size are converted to a code for efficient storage. The code varies from one word processing program to another and even between releases of the same program.

The most common word processing program, by a wide margin, is Microsoft Word (MS Word). Several releases of MS Word run on the Windows operating system and on the Macintosh operating system. Versions of MS Word released prior to 2007 save files in a proprietary format. The format is indicated by a period and a three-letter extension—.doc—that is automatically attached to the file when it is saved. Beginning with MS Word 2007 for Windows and MS Word 2008 for Macintosh, files are saved using a different format that is indicated by a period and a four-letter exten- sion—.docx—that identify the newer format.

Almost all word processing programs have the ability to save files in the .doc file format, and it is a common standard for word processing files. Newer versions of word processing programs, including MS Word 2007 and MS Word for Mac 2008, can save files in the older .doc format. There are new features in MS Word 2007—such as the ability to format citations in a variety of styles, including APA, MLA, and Chicago—that are lost when the file is saved in the .doc format. Older versions of MS Word can be adapted to read the newer .docx file formats by downloading and installing a compatibility program that is available at no cost from Microsoft’s website. Display of document file extensions is hidden by default in the Windows operating system. They can be dis- played by turning off this feature. Instructions for displaying the file extensions are available from the operating system’s help menu. In the Windows Vista operating system, the option is found on the Control Panel, in Appearance and Personalization, in Folder Options, on the View tab, under Advanced Settings, as shown in Figure 7.12.

210 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

style

Combination of formatting, including font, font size, font color, shading, and other attributes used to display a segment of text and to identify its level of importance.

FIGURE 7.12 Displaying File Name Extensions

When a list of files is displayed in a dialog box, choose the Details option. In Windows Vista, the Details option is on the View button, as shown in Figure 7.13.

FIGURE 7.13 File Extensions Displayed in Details View

Styles

The combination of formatting, including font, font size, font color, shading, and other attributes used to display a segment of text and to identify its level of importance, is called a style. A style can be given a name and applied repeatedly to different portions of a document. Predefined styles are available in MS Word 2007 on the ribbon, on the Home tab, in the Styles group, as shown in Figure 7.14. Users can define their own styles and give them names. Some organizations prefer that all of their documents have similar fonts and styles for headings, body text, and figure captions.

FIGURE 7.14 Style Choices

Chapter 7 Project Communication Management 211

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

template

An example document that uses standard design features that can be completed to create similar documents.

Outlines

An outline of a document consists of topic headings and subheadings, and it is useful when orga- nizing or reorganizing a document. The Styles group in MS Word 2007 includes predefined styles for nine levels of headings. In addition to using different fonts, each heading is assigned a level of importance. A document that uses headings with assigned levels can be viewed in the Outline view, such as the book outline shown in Figure 7.15. In this view, the level of detail displayed in the outline is selected to display the first two levels of the outline. The headings and the hidden text associated with each heading can be moved by selecting and dragging headings from one location in the outline to another.

FIGURE 7.15 Outline View in MS Word 2007

Templates

If a particular type of document will be used repeatedly, it might be worth the time to create an example document—a template—that is formatted using the appropriate styles with blanks or placeholder text where the user can insert the information that describes a particular situation. A variety of templates are already available for download at no additional cost. For example, when a new document is created in Microsoft Word 2007, there is an option to choose a template such as the invoice template shown in Figure 7.16.

212 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.16 Standardized Document Used as a Template

The template may be customized and used repeatedly for all the documents of that type, or the organization can design its own.

Diagrams

Reporting relationships and the flow of work are often described using diagrams that consist of boxes connected by arrows. Recent releases of popular word processing programs include drawing tools that can be used for basic diagrams. In MS Word 2007, a variety of shapes and connectors are available on the Insert tab, in the Illustrations group on the Shapes button, as shown in Figure 7.17.

FIGURE 7.17 Menu of Diagramming Shapes and Connectors in Word 2007

Chapter 7 Project Communication Management 213

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

spreadsheet

Display of data in row and column format.

table

Group of data that is organized in rows and columns, where columns are types of data and rows are individual instances.

Adaptable connecting lines and arrows can be used that redraw automatically when the shapes are moved. This feature facilitates rapid revisions when the shapes must be moved, because the connecting arrows do not need to be redrawn.

A feature named SmartArt was introduced in Microsoft Office 2007 that has a variety of charts that can be used for displaying organization and relationships that use more sophisticated and artistic graphics, as shown in Figure 7.18.

FIGURE 7.18 SmartArt Feature in Microsoft Word

Spreadsheets

Another commonly available software creates a spreadsheet—a display of data in row and column format—in which financial or numerical data can be manipulated. The intersection of the rows and columns are cells into which numbers, text, dates, and formulas can be entered. The formulas can utilize values found in other cells and display the results in the cell in place of the formula. If the value in a cell to which the formula refers is changed, all the formulas that use that cell’s value are immediately recalculated. This feature makes it convenient to examine several options quickly. Spreadsheets are often used to manage data on simple projects instead of a dedicated database or project management software.

Organizing Data in Rows and Columns

If a spreadsheet is used to store data, such as a list of project activities or a list of expenses, it is prudent to arrange the data in some way that would be used by more sophisticated data manage- ment software. Most data management programs arrange data in such a way that each type of data is represented by a column with a label at the top and each row contains the specific data for one type of item. A collection of data arranged in rows and columns is a table. For example, a list of expenses would be arranged so that individual expenses are recorded on each row, and each col- umn would be a type of information related to the expenses, as shown in Figure 7.19.

214 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

filtered

Display is restricted to data that meets criteria.

FIGURE 7.19 Expenses Arranged in a Table in a Spreadsheet

File Format

The most common spreadsheet program, by a wide margin, is Microsoft Excel (MS Excel). There have been several releases of MS Excel that run on the Windows operating system and on the Macintosh operating system. Versions of MS Excel released prior to 2007 save files in a proprietary format. The format is indicated by a period and a three-letter extension—.xls—that is automatically attached to the file when it is saved. Beginning with MS Excel 2007 for Windows and MS Excel 2008 for Macintosh, files are saved using a different format that is indicated by a period and a four-letter extension—.xlsx—that identifies the newer format.

Almost all spreadsheet programs have the ability to save files in the .xls file format, and it is a common standard for spreadsheet files. Newer versions of spreadsheet programs, including MS Excel 2007 and MS Excel for Mac 2008 can save files in the older .xls format. There are a few new basic features in MS Excel 2007 that would be lost by saving files to the older file format.

Using a Spreadsheet to Manage Project Data

If the data in the spreadsheet is arranged in simple rows of the same type of data, it can be manip- ulated to provide reports for basic projects.

If one or more of the columns in a table contain labels, identification numbers, or other descriptions, those labels can be used to specify sorting and filtering options. For example, if the spreadsheet has a list of expenses, the rows of data can be sorted in decreasing or increasing value by one of the data types such as the due date or the amount of the expense. The display can be restricted—filtered—to display only those rows that meet criteria specified by the user. For exam- ple, the table could be filtered to display the expenses for a particular department that were incurred between two dates. This ability facilitates the preparation of monthly progress reports and budgets.

In MS Excel 2007, the sorting and filtering options are on the Data tab, in the Sort and Filter group under the Sort or Filter button. Once a filter is applied, option buttons are placed at the top of each column to facilitate changes in the sorting or filtering options. For example, the list of expenses shown in the previous figure can be sorted by the labels in the Category column and fil- tered to show only costs that are more than $20, as shown in Figure 7.20.

Chapter 7 Project Communication Management 215

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.20 Sorting and Filtering in Microsoft Excel 2007

Subtotals

If the user wants to find a subtotal of the values that belong in a particular group, the groups must be identified by a label in one of the columns. Finding subtotals is a two-step process. First, the table is sorted by that column to bring all the rows in each group together. Next, the subtotal feature is applied. In Excel 2007, the subtotal option is found on the Data tab, in the Outline group. A dialog box allows the user to choose the columns to subtotal and the columns that contain the labels of the groups. A subtotal is inserted below the last row for each group, as shown in Figure 7.21.

216 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.21 Using Subtotals

In a panel at the left of the screen are lines and symbols that indicate the level of detail that is displayed. By clicking on the boxes with minus signs, the rows containing the data can be hidden, leaving the subtotals or grand total, as shown in Figure 7.22 and Figure 7.23. This feature allows a manager to view summary data very quickly without the visual clutter of the details.

FIGURE 7.22 Third level details are hidden.

FIGURE 7.23 All details in rows 2–16 are hidden.

Graphics for Bar Charts and Milestones

Spreadsheets can be used for basic progress reports that show activities, dates, and horizontal bars that represent the duration of an activity. A sequence of dates can be created as column labels by entering the first two dates in the sequence, selecting both dates, and then dragging the fill han- dle—a small square in the lower right corner of the selected cell, as shown in Figure 7.24—to extend the pattern.

Chapter 7 Project Communication Management 217

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.24 Creating a Sequence of Dates

The program is sophisticated enough to correctly fill date sequences between months that have a different number of days and even account for leap years in February. Because more sophis- ticated project management software uses a table design in which the first two columns are description and duration, a similar structure, in which those two columns are adjacent and in that order will make it convenient to transfer the list of activities in a low-complexity project into the project management software at a later date if the spreadsheet is not sufficient. In the duration col- umn, use the following abbreviations:

• d for days

• wk for weeks

• mons for months

The duration of each activity and the relationships between activities can be illustrated using the drawing shapes. In Excel 2007, the same set of shapes and connector arrows are available as those in Word 2007. A long rectangle can represent a bar whose length represents the duration of the activity. Events or significant dates in the project are identified with a diamond. The diamond can be created by using a small square shape and rotating it. Arrows can be drawn between the shapes to indicate their relationships, as shown in Figure 7.25. Unfortunately, the arrows in Excel 2007 connect to handles on the sides of the rotated squares instead of the corners. This detail may be overlooked in a simple project diagram.

FIGURE 7.25 Diagram of Activities

This type of diagram is useful for projects with low complexity where a simple chart of a few activities will suffice.

Software for Moderately Complex Projects

More complex projects involve more people, who are often separated geographically and who contribute to the same documents. Complex projects have more tasks with more complex relation-

218 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

ships. To manage those tasks and relationships, using dedicated project management software and more sophisticated diagraming software is justified.

Sharing Team Documents

If more than one person on a team will be contributing to a document, the document must be accessible to them. To manage documents that are created by a team, it is necessary to control the edits so that work is not lost or confused.

Version Control

Files such as word processing documents and spreadsheets may be stored on an individual’s com- puter and copies sent to participants who then make changes and return the revised version to the person who is responsible for the final version of the document. If more than one person is editing his or her own copy of a document at the same time, different versions of the document with dif- ferent additions or corrections are created. Word processing programs such as MS Word 2007 have a feature that can compare two documents and identify the differences to help bring the two dif- ferent documents back together. This feature is found on the Review tab, in the Compare group, as shown in Figure 7.26.

FIGURE 7.26 Compare Documents Feature

Most software programs make periodic backups to protect from accidental power loss. One of the ways that a user can still lose a lot of work is by replacing a newer version of a document with an older version. It is possible to display the date on which the file was last saved using the Details view. If more than one version of the file exists in two different locations, the dates can be com- pared to determine which is the most recent. These techniques are useful for simple projects with very few participants.

File Storage and Access Control

Managing versions of documents that are edited by more than one person can be done more effec- tively by placing the file in a location that can be accessed by all the team members. This can be a shared drive on the company’s computer or on a document sharing service. People who need to use the document are grouped by their need for access. Three groupings are common:

1. View only

2. Edit only

3. Ownership/administrator

The owner or administrator of the document can set the access levels. These levels of access can be assigned to each individual, or they can be assigned to named groups, and the person can be made a member of a group. The owner of the document can choose to accept or reject changes made by those with edit-only permission.

Chapter 7 Project Communication Management 219

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

virtual private network (VPN)

Method of connecting to a network from the Internet using a code to protect the communication.

encryption

Replacing readable content with a code.

The advantage of this method is that there is only one version of the file. If a file is being edited, it is usually locked so that other team members may view the file but cannot edit it until the first editor closes the file.

If the file is stored on a computer that is on a secure network within an organization, it can be difficult for team members who do not have direct connections to the company’s network to get access to the files. To protect the security of the company’s network, the network administrator can grant an outside user permission to access the network from anywhere on the Internet using a virtual private network (VPN) connection. A VPN uses encryption—replacing readable content with a code—to protect the communication between the network and the user to make it secure. The VPN connection gets the user onto the company network as if they were directly connected, but they still need the appropriate passwords to access the shared documents.

Tracking Changes and Adding Comments

One of the features that is particularly useful for keeping track of the changes made to a document by several users is called Track Changes. In Microsoft Word 2007, it is found on the Review tab, in the Tracking group. Changes may be shown in the document or in balloons at the side.

If a team member wishes to explain a change, it is very important that they do not insert their explanation as text into the document. Such explanations might not be deleted and would end up in the final version of the document with potentially damaging results. Instead, team members can use a form of electronic sticky note to make comments. This feature is found in MS Word 2007 on the Review tab, in the Comments group. A change and a comment are shown in Figure 7.27. The document owner must go through the document and accept or reject each change and delete all the comments before the document is released as a finished product. The Next, Accept, and Reject options are found in Microsoft Word 2007 on the Review tab, in the Changes group.

FIGURE 7.27 Tracking Changes and Adding Comments

Diagraming Software

The processes and relationships in medium- and high-complexity projects usually require more sophisticated software tools for creating reporting diagrams and workflow charts. The market for diagramming software is more diverse than for word processing and spreadsheets, and it is not as likely that most team members will have the same programs that save files in the same formats. Microsoft VISEO 2007 is available as a stand-alone program that sells for several hundred dollars. For medium-complexity projects, a free alternative to VISEO is Open Office Draw. Open Office is a free software alternative that includes a word processing, spreadsheet, presentation, and drawing programs. The Open Office Draw program, and others like it, can create diagrams such as the one shown in Figure 7.28.

220 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.28 Diagram Created Using Open Office Draw

The files created by the various drawing programs might not be compatible with each other, but all the programs can create static image files that can be pasted into word processing docu- ments.

Project Management Software

The relationships between project activities can become complicated in medium- and high-com- plexity projects. Dedicated project management software can compute the sum of activity dura- tions along several different paths through complex relationships and recalculate them immedi- ately if any of the durations or starting times are changed. Similarly, charts and reports are updated automatically based on the new data. The most popular software for medium-complexity projects is Microsoft Project. If a project manager begins work on the project in the belief that it can be man- aged using a list of activities in a word processing program or in a spreadsheet, the list of activities and their durations can be copied and pasted, or imported, into the project management software’s table of activities, if the original document or spreadsheet was designed with that possibility in mind, as shown in Figure 7.29.

Chapter 7 Project Communication Management 221

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

open source

Available at no cost for individual users and with fewer restrictions than proprietary software.

tags

Labels that enclose text to describe how it is displayed or to give it meaning as data.

extensible markup language (XML)

Rules for defining tags that can identify text as data or for display purposes.

FIGURE 7.29 List of Activities Transferred to a Project Management Program

Once the data are placed in the project management software, the relationships can be defined and reports created. Organizations on a tight budget might consider using an open source program named OpenProject. Open source software is usually available at no cost for individual users and with fewer restrictions than proprietary software like Microsoft Project. OpenProject is similar to Microsoft Project, as shown in Figure 7.30, and could be used on low- and medium-complexity pro- jects that do not need the more advanced features available in Microsoft Project.

FIGURE 7.30 Open Source Project Management Software

Software for Complex Projects

Complex projects can involve thousands of individual activities, and a company might have several projects going at the same time. Large, complex projects are common in the construction industry. A software that is commonly used for complex projects in construction is P3 or P6 from Primavera. It has the ability to produce sophisticated reports that help project managers to anticipate prob- lems and make projections.

Word processing documents often contain data that could be aggregated and analyzed. Begin- ning with Microsoft Word 2007 and the .docx file format, it is possible to insert characters called tags on either side of a particular section of a form or document and assign a data label. For exam- ple, the name of the supplier on an invoice could be enclosed between two tags: <supplier>Thompson Hardware</supplier>. These tags resemble those used in the hypertext markup language (HTML) to identify how to display text on a web page, but instead of telling a web browser how to display the name of the supplier, it identifies Thompson Hardware as the supplier. These tags can be created by following a set of rules called the extensible markup language (XML). Forms created using XML can be scanned for the content that is marked by tags. The data can be imported into a spreadsheet or database for analysis. Creating documents that use XML to identify

222 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

data in the forms can be done using Microsoft InfoPath. An example that identifies key facts in a document that was prepared using InfoPath is shown in Figure 7.31. Because it takes extra effort to learn to use InfoPath, or a similar XML authoring program, and to create the forms, this approach is normally limited to complex and sophisticated organizations that have the need to manage large amounts of data.

FIGURE 7.31 InfoPath Form with XML Tags

Key Takeaways

• Low-complexity projects might be managed using general purpose word processing and spreadsheet software by using the special features for outlining, managing data, and insert- ing graphic objects

• Medium-complexity projects need special purpose software for managing project activities, such as Microsoft Project, and graphic software such as VISEO. Open source software such as OpenProject and Open Office Draw may suffice.

• High-complexity projects need more sophisticated project management software like P6 from Primavera. Forms can be created using XML tags that allow data to be extracted from the documents.

• Files can be stored at a location that is accessible by all the team members. They can be granted different levels of access, including view only, edit only, and ownership. Features like track changes and compare documents can help manage edits.

Exercises

1. General purpose word processing and spreadsheet software might be sufficient for manag- ing _____ (low-, medium-, high-) complexity projects.

2. Three features that are available in spreadsheet programs such as Microsoft Excel to man- age tables of data are subtotal, sort, and _________.

3. If outline levels are assigned in a word processing document, the outline may be _________ or expanded to hide or display different levels of detail.

Chapter 7 Project Communication Management 223

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

4. ______-________ (two words) software is often available at no cost, and its use is less restricted than proprietary software.

5. A VPN connection uses ___________ to protect the content of the communication.

6. How are XML tags similar to HTML tags and how are they different?

7. How should activity information be organized in a spreadsheet to make it easier to transfer to a project management program?

8. What are three options for creating a diagram that displays a project’s reporting hierarchy for low- or medium-complexity projects?

9. What is an example of a software product that is commonly used for highly complex pro- jects?

10. What are three levels of file access and editing permissions that can be assigned, and what are examples of user groups that would be assigned to each level?

Internalize your learning experience by preparing to discuss the following.

Describe an experience you might have had with editing a word processing document and how you managed the revisions. If you used some of the features described above, how well did they work? What features were described that might have been helpful?

7.4 End-of-Chapter Exercises

Exercises at the end of the chapter are designed to strengthen your understanding and retention of the information recently acquired in the chapter.

Essay Questions

Write several paragraphs to provide more in-depth analysis and consideration when answering the following questions.

1. Assume that you are the leader of a virtual team that includes members who are in New York, Bogotá, Honolulu, and Tokyo. You would like to choose a day and time for a weekly conference call to keep the project on track. Choose a day and time and explain your choice and the compromises and problems it might cause for each member. Use the term “syn- chronous” correctly and identify the specific time zone for each participant.

2. From the list of available templates in your word processing or spreadsheet software, choose a template and describe it. Fill it out and then describe how it could be modified to meet the needs of a particular situation or organization.

Discussion

The exercises in this section are designed to promote exchange of information among students in the classroom or in an online discussion. The exercises are more open ended, which means that what you find might be completely different from what your classmates find, and you can all benefit by sharing what you have learned.

224 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

1. Consider the newer synchronous and asynchronous communications technologies with which you are familiar. Describe how they might be used on projects in new and innovative ways. Relate these ideas to what you learned about project cultures—specifically about inno- vation on projects—and describe how the new communications technologies could be used to innovate.

2. Describe your experience using Excel to manage data such as lists of purchases. Discuss how the features of sorting, filtering, and subtotaling could help answer questions about that list.

7.5 Web Exercise

Learning Objective

1. Determine the local time for team members in other time zones given GMT or UT zone des- ignations.

Using an Online Time Zone Map

Fortunately, there are several websites that provide the information you need to schedule a confer- ence call so that all the participants know the correct time and day of the week regardless of where they are in the world.

How to Use a Website to Help Find Local Time

1. Open a word processing document. Save it as Ch06TZStudentName.doc. Use the .doc file for- mat.

2. On the first line, type Chapter 6 study documentation by and then type your name. Press Enter to move the insertion point to the next line

3. Open a web browser and go to http://www.worldtimezone.com.

4. The map will display the world’s time zones at the time you visit the site. See Figure 7.32. The example in Figure 7.32 was displayed on the author’s computer at 6:40 p.m. EST on Thursday, December 18 (23:40 GMT).

Chapter 7 Project Communication Management 225

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.32 World Times Compared to 6:40 p.m. EST

5. Capture the screen that displays the World Time Zone Map with your current time and date.

6. Switch to the word processing document and paste the screen capture below the first line of text.

7. Below the image, type The time and date in India would be and then type the time and date in India for your current time and date.

8. Review your work and use the following rubric to determine its adequacy:

Element Best Adequate Poor

File name Ch06TZStudentName.doc Ch06TZStudentName.docx Different file name or incompatible format

Determine the local time for team members in other time zones given GMT or UT zone designations

Title; screen capture with current date and time; correctly calculated day and time in India.

Same as Best Incomplete or an error in the time or date

9. Save the file and submit it as directed by the instructor.

226 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

7.6 Software and Technology Exercises

Learning Objectives

1. Locate the dialing codes for making international telephone calls.

2. Identify dialing techniques used with cell phones to make international telephone calls.

3. Select the appropriate times and methods for making international calls.

4. Subscribe to a news service using a newsreader and RSS.

Placing International Calls

International Telephone Calls Using Wired Phones

The telephone may be used for two-person synchronous communication or in a multipart confer- ence call. Using a telephone to make long-distance and international calls involves using interna- tional telephone numbering conventions.

Calls within North America and the Caribbean

The telephone companies in North America use the North American numbering plan (NANP) that includes the United States, its territories, Canada, Bermuda, and sixteen Caribbean nations.

Wired telephones are connected physically to a local switch that can handle up to ten thousand connections represented by the last four-digit numbers in a telephone number from 0000 to 9999. Each switch is identified by a three-digit number such as 555. A local telephone number consists of the switch number and one of the ten thousand four-digit numbers such as 555 0112. This system can provide up to ten million different unique phone numbers,[3] but it does not have the capacity to provide service to billions of people.

Calling from North America to a Country outside the NANP

The IDD code for the United States is 011.

To make an international call from an NANP member such as the United States to another country, you need to provide two codes: the international direct dialing (IDD) code and the country code. The IDD code for the United States is 011. For example, if you wanted to place a call to a num- ber in Rio de Janeiro, you would enter 011 55 21 xxx xxxx, where 011 is the IDD code for the United States, 55 is the country code for Brazil, 21 is the area code for Rio de Janeiro, and xxx xxxx repre- sents the final seven digits of the number.

Chapter 7 Project Communication Management 227

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Calling to North America from a Country outside the NANP

The IDD and the country code are not simply reversible. The country code for the United States is 1 (not 011).

If you traveled to Rio de Janeiro for a meeting and wanted to call back to a number in the United States from a local phone, you would have to look up the IDD code for the local service provider in Brazil. In Brazil, there is a different code for each of the five phone companies. The IDD for Brasil Telecom is 0014.

The IDD and the country code are not simply reversible. The country code for the United States is 1 (not 011), so you would enter 0014 1 xxx xxx xxxx, where the last ten digits are the area code and telephone number in the United States.

Reading the Phone Number on a Business Card in North America

It is commonly understood in the United States that you do not enter the hyphens, parentheses, spaces, or periods that are used to make a telephone number more readable and that you dial 1 first—even though it is not included—for a call destined for a different area code. For example, if the phone number on the business card shows (555) 222-1111, you know that you would enter 2221111 if you are calling from within the 555 area code[4] or 15552221111 for a call from a different area code, but you would not attempt to enter the parentheses, space, or hyphen. Spaces are used in some instances in the following discussion to make the numbers easier to read in this text, but it will be understood that they are not entered when dialing the number.

Reading the Phone Number on an International Business Card

Unlike those countries participating in the NANP, other countries use different numbers for the national direct dialing (NDD) code and the country code. They might use a different number of dig- its for the area or city code. A business card from a team member in Rio de Janeiro might be +55 (0)21-xxxx xxxx where 55 is the country code and 0 is the NDD code. To call this team member from the United States on a wired telephone, you would enter 011 55 21 xxxx xxxx, where 011 is the IDD for the United States, 55 is the country code for Brazil, and 21 is the code for Rio de Janeiro.

Notice the zero between 55 and 21 is not included when calling from outside the country. This is the NDD code that is used for calls between areas within the country. For example, if you land in the airport at Sao Paulo, Brazil, and want to call the person in Rio de Janeiro from a local phone, you would enter 0 21 xxxx xxxx (without the spaces) where 0 is the NDD code—like 1 in the United States—and 21 is the area/city code.

Finding International Telephone Codes

1. Open a word processing document. Save it as Ch06PhoneStudentName.doc. Use the .doc file format.

2. On the first line, type Chapter 6 study documentation by and then type your name. Press Enter to move the insertion point to the next line.

228 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

3. Open a web browser and go to http://www.kropla.com. This site provides information on inter- national dialing codes.

4. Near the middle of the page, click the International Dialing Codes link.

5. On the CountryCode.org page, in the Country column, scroll down and click Brazil. A list of country codes and city codes is displayed next to a map of the country.

6. Use the browser’s Back button to return to the CountryCode.org web page. Add the address for this page to the Project Management folder in your browser’s favorites or bookmarks.

7. Switch back to the browser. In the Country column, scroll down and click one of the country names other than Brazil.

8. Capture the screen that shows the country’s code and map, paste it into a blank document, and then save the document as Ch06Exercises6.5.doc.

Making International Telephone Calls Using a Mobile Phone

To place an international call to a country outside the NANP using a mobile phone, you use the plus sign (+) instead of the IDD code. For example, the number of the British Museum is +44 (0) 20 7323 8000. To call this number from a wired phone in the United States, you would dial 011 44 20 7323 8000. If you make the call from a mobile phone, you dial +44 20 7323 8000. Notice the plus sign takes the place of the IDD code.

Finding the Plus Sign on a Mobile Phone

Wired phones do not have a plus sign on their keypads, but recent model mobile phones include a method to dial a plus sign. Unfortunately, the method varies by brand of telephone.

Practice Using International Dialing Codes

Selecting the appropriate numbers to use from a business card for placing an international call requires practice. In this exercise, you practice using your knowledge of international calling codes to compare your answers to reference answers that are hidden on a spreadsheet.

Using a Spreadsheet for Practice

1. Navigate to the location where the student files for chapter exercises are located and then open 7.3.3_PhonePractice.xls. Save the file as Ch07PhonePracticeStudentName.xls using the Excel 2003 file format.

2. Use the skills you practiced in this chapter and in previous exercises to answer the first ques- tion in cell C2. You are allowed to open a browser and refer to websites for assistance.

3. Notice that if you type and enter the correct answer, in exactly the format indicated, the cell background turns green, as shown in Figure 7.33.

Chapter 7 Project Communication Management 229

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

FIGURE 7.33 Background Turns Green If Correct

© Microsoft Corporation. All Rights Reserved. Used with permission from Microsoft Corporation.

4. Observe that column D is hidden. It contains a set of correct answers. The spreadsheet’s con- ditional formatting feature is used to change the background color if the cell content matches the hidden answer.

5. Use your web references and personal knowledge to answer the remaining questions. Place the answers in column C. If some of the answers do not turn green, check your work. If you cannot determine the error, move on to the next question. Answer all the questions, even if some of the answers are wrong or do not match the reference answer exactly.

6. Select columns C through E. To accomplish this, you may click and drag the column headings from C through E, or you can click the column C heading, hold the Shift key, and click the col- umn E heading. Columns C, D, and E are selected, even though column D is hidden, as shown in Figure 7.34.

FIGURE 7.34 Columns C, D, and E Selected

© Microsoft Corporation. All Rights Reserved. Used with permission from Microsoft Corporation.

7. Move the pointer onto either column, then right-click. On the shortcut menu, click Unhide. The answers in column D are displayed.

8. Locate any answers that are still displayed in red. Compare your answer to the reference answer. In the Analysis column on the same row, analyze and explain why your answer did not match the reference answer. Use this opportunity to correct misunderstandings.

9. Save the spreadsheet. Check your work to assure that it is complete using the following table:

Element Best Adequate Poor

File name Ch07PhonePracticeStudentName.xls Ch07PhonePracticeStudentName.xlsx Different file name or incompatible format

Select the appropriate times and methods for making international calls

All incorrect answers are analyzed; the cause of the error correctly identified

All correct Analysis does not correctly identify the cause of the error

10. Save the file and submit it as directed by the instructor.

230 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

Using a Newsreader

Some projects are directly affected by external factors such as political elections, economic trends, corporate mergers, technological or scientific breakthroughs, or weather. To keep informed about these factors, you can subscribe to online news sources. A method that facilitates this process is Really Simple Syndication (RSS). To use this service, you need a newsreader so you can subscribe to RSS feeds. For this activity, you need a Google account. If you do not have one, go to Google.com and create one for no cost.

Endnotes

1. Diallo, A., Thuillier, D. 2005, The success of international development projects, trust and communication: an African perspective International Journal of Project Management Volume 23, Issue 3, April 2005, Pages 237-252

2. Business Dictionary, s.v. “Virtual Team,” http://www.businessdictionary. com/definition/virtual-team.html (accessed January 27, 2010).

3. The three-digit area code plus the next four digits make up a seven-digit number. A seven-digit number has ten million possible combinations from 000 0000 to 999 9999. In practice, some area codes are reserved for special purposes such as trouble-shooting, emergencies, directory assis- tance, and maintenance, so the maximum is less than ten million per area code. For example, numbers 555-0100 through 555-0199 are reserved for fictional use and are not assigned to real customers.

4. Some area codes cover large geographic areas, and the NDD code is required to dial a number from within the same area code if they are far apart.

Chapter 7 Project Communication Management 231

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

232 Project Management

© 2018 Boston Academic Publishing, Inc., d.b.a. FlatWorld. All rights reserved.

C re

at ed

e xc

lu si

ve ly

fo r

S co

tt B

ro w

n <

sb ro

w n@

ce rr

ito s.

ed u>

  • Chapter 7: Project Communication Management
    • 7.1: Project Communication Plan
      • Escalation Paths
        • Constraints
        • Roles; Relative to Project Communications
        • Team Directory
      • Escalation Paths
    • 7.2: Types of Communication Technology
      • Synchronous Communications
        • Time Zones
        • Local Time
      • Asynchronous Communications
        • Mail and Package Delivery
        • Fax
        • Electronic Mail
        • Project Log and Web Log (Blog)
        • Really Simple Syndication (RSS)
        • Assessing New Communication Technologies
    • 7.3: Selecting Software
      • Simple Projects
        • Word Processing
        • File Format
        • Styles
        • Outlines
        • Templates
        • Diagrams
        • Spreadsheets
        • Organizing Data in Rows and Columns
        • File Format
        • Using a Spreadsheet to Manage Project Data
        • Subtotals
        • Graphics for Bar Charts and Milestones
        • Software for Moderately Complex Projects
        • Sharing Team Documents
        • Version Control
        • File Storage and Access Control
        • Tracking Changes and Adding Comments
        • Diagraming Software
        • Project Management Software
        • Software for Complex Projects
    • 7.4: End-of-Chapter Exercises
    • 7.5: Web Exercise
      • Using an Online Time Zone Map
        • How to Use a Website to Help Find Local Time
    • 7.6: Software and Technology Exercises
      • Placing International Calls
        • International Telephone Calls Using Wired Phones
        • Calls within North America and the Caribbean
        • Calling from North America to a Country outside the NANP
        • Calling to North America from a Country outside the NANP
        • Reading the Phone Number on a Business Card in North America
        • Reading the Phone Number on an International Business Card
        • Finding International Telephone Codes
        • Making International Telephone Calls Using a Mobile Phone
        • Finding the Plus Sign on a Mobile Phone
      • Practice Using International Dialing Codes
        • Using a Spreadsheet for Practice
      • Using a Newsreader
    • Endnotes