Benchmark - Build Analysis Solution Using PowerBI

profileRiri01
Benchmark-BuildAnalysisSolutionUsingPowerBI.docx

Benchmark - Build Analysis Solution Using PowerBI

Assessment Description

Step 1:

The purpose of Step 1 is to build, visualize, and interpret data models using Power BI. 

Review the Canyon Sales dimensional model you built in the Topic 1 assignment "Design a Relational Schema" and perform the following Power BI: 

1. Load the Canyon Sales database into Power BI. 4 dimensions and a fact should be loaded.

2. Use bar chart to visualize units sold by product name. Take a screenshot of the bar chart to be used in Step 3. 

3. Use bar chart to visualize units sold by year. Take a screenshot of the bar chart to be used in Step 3.

4. Use bar char to visualize units sold by store region name. Take a screenshot of the bar chart to be used in Step 3.

5. Use bar chart to visualize units sold by store region name and product vendor name. Take a screenshot of the bar chart to be used in Step 3.

Step 2:

In this step, the student will learn how to perform feature extractions using DAX in Power BI.

In Power BI, create a table named Calendar with the following columns:

· Date column populated with the most recently completed 2 years' worth of data from January 1st to December 31st.

· Month column to display the name of the month.

· Year column to display the year.

· Month number to display the number of the month (e.g., 1 for January).

· Week number to display the number of the week (e.g., Jan 1 to Jan 7 is week number 1).

· Weekday to display the name of the day (Jan 01 has a weekday name of Sunday).

· Weekday number to display the day number of the weekday (ex: Sunday has a weekday number 7).

· Workday: display 1 if it is a workday, otherwise 0.

Take a screenshot that shows all the information from Step 2 to be used in Step 3.

Step: 3

Write an academic paper, using Microsoft Word, presenting your models and extractions from Steps 1 and 2. Submit your paper through the digital classroom.

The paper will include the following:

· An introductory paragraph

· Presentation, explanation, and interpretation of each of bar chart (Step 1: b-e) as if this report were being presented to your manager and the team. Include the screenshots of each bar chart along with their explanations.

· Presentation of an excerpt of your calendar that shows all the information from Step 2. Include the screenshot.

· A concluding paragraph

This assignment uses a rubric. Please review the rubric prior to beginning the assignment to become familiar with the expectations for successful completion.

Rubric Criteria

Expand All Rubric CriteriaExpand All

Introduction

3.25 points

Visualize Units Sold by Product Name and Screenshot with Interpretation (B)

9.75 points

Visualize Units Sold by Year and Screenshot with Interpretation (B)

9.75 points

Visualize Units Sold by Store Region Name and Screenshot with Interpretation (B)

9.75 points

Visualize Units Sold by Store Region Name & Product Vendor Name & Screenshot & Interpretation (B)

9.75 points

Calendar Table

13 points

Conclusion

3.25 points

Mechanics of Writing

3.9 points

Format/Documentation

2.6 points

Total65 points

PART TWO

Create a professional, 7 to 10-slide presentation (e.g., PowerPoint) that would be appropriate to deliver to your manager and team, presenting the information in your academic paper from "Benchmark - Build Analysis Solution Using Power BI." Include the screenshots.