BCN3611 Term Project

profilelalaloops
BCN3611-ProjectSheetTemplates1.xlsx

Summary (MasterFormat)

COST SUMMARY (MasterFormat)
DIVISION MATERIAL LABOR EQUIPMENT TOTAL
01 - General Requirements
03 - Concrete 3,077.80 1,760.50 8.10 4,846.40
04 - Masonry
05 - Metals
06 - Wood
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
11 - Equipment
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
26 - Electrical
31 - Earthwork
32 - Exterior Improvements
GRAND TOTAL $3,077.80 $1,760.50 $8.10 $4,846.40

Summary (Uniformat II)

COST SUMMARY (UNIFORMAT II)
Gross Floor Area GSF = 2250
Division Breakdown $/GSF Cost
A Substructure A10 - Foundations 2.15 4,846.40
A20 - Basement Construction
B Shell B10 - Superstructure
B20 - Exterior Closure
B30 - Roofing
C Interiors C10 - Interior Construction
C20 - Stairs
C30 - Interior Finishes
D Services D10 - Conveying
D20 - Plumbing
D30 - HVAC
D40 - Fire Protection
D50 - Electrical
E Equipment and Furnishings E10 - Equipment
E20 - Furnishings
F Special Construction and Demolition F10 - Special Construction
F20 - Selective Building Demo
G Sitework and Utilities G10 - Site Preparations
G20 - Site Improvements
G30 - Site Civil/Mech. Utilities
G40 - Site Electrical Utilities
G90 - Other Site Construction
Z General Conditions, Overhead, and Profit Z10 - General Conditions
Z20 - Other Indirect Costs
Z30 - Contractor's Fees (Profit)
GRAND TOTAL 2.15 4,846.40

Div. 3

DIVISION 03 - CONCRETE
RS Means Item # Uniformat II Code Item Description Unit Qty Unit Cost ($/unit) Cost ($) Total Cost ($)
Material Labor Equipment Material Labor Equipment
031113450050 A1010 Furnish and install plywood formwork for the concrete footings SFCA 160 3.40 3.09 0.00 544.00 494.40 0.00 1,038.40
031113653000 A1030 Furnish and install formwork for the slab-on-grad in the main residence L.F. 80 0.31 2.27 0.00 24.80 181.60 0.00 206.40
032110600500 A1010 Furnish and install #4 reinforcement steel bars for the concrete footings Ton 0.5 1,000.00 760.00 0.00 500.00 380.00 0.00 880.00
032110600600 A1030 Furnish and install #3 reinforcement steel bars for the slab-on-grade Ton. 0.7 1,000.00 695.00 0.00 700.00 486.50 0.00 1,186.50
033105350100 A1010 Furnish and deliver 2500 psi ready mix concrete for the footings C.Y. 6 93.50 0.00 0.00 561.00 0.00 0.00 561.00
033105350100 A1030 Furnish and deliver 2500 psi ready mix concrete for theslab-on-grade C.Y. 8 93.50 0.00 0.00 748.00 0.00 0.00 748.00
033105701900 A1010 Placnig concrete with a direct chute for the footings C.Y. 6 0.00 14.80 0.55 0.00 88.80 3.30 92.10
033105704300 A1030 Placing concrete with a direct chute for the slab-on-grade C.Y. 8 0.00 16.15 0.60 0.00 129.20 4.80 134.00
GRAND TOTAL 3,077.80 1,760.50 8.10 4,846.40