MAKU residence cost estimation assignment

profileiamanz.str
BCN3611-ProjectSheetTemplates.xlsx

Summary (MasterFormat)

COST SUMMARY (MasterFormat)
DIVISION MATERIAL LABOR EQUIPMENT TOTAL
01 - General Requirements
03 - Concrete
04 - Masonry
05 - Metals
06 - Wood
07 - Thermal and Moisture Protection
08 - Openings
09 - Finishes
11 - Equipment
22 - Plumbing
23 - Heating, Ventilating, and Air-Conditioning (HVAC)
26 - Electrical
31 - Earthwork
32 - Exterior Improvements
GRAND TOTAL $0.00 $0.00 $0.00 $0.00

Summary (Uniformat II)

COST SUMMARY (UNIFORMAT II)
Gross Floor Area GSF = 2250
tc={1DF46D86-5353-E143-91BC-ED3DDF311C2D}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: Input the correct area of the building
Division Breakdown $/GSF Cost
A Substructure A10 - Foundations 2.15 4,846.40
A20 - Basement Construction
B Shell B10 - Superstructure
B20 - Exterior Closure
B30 - Roofing
C Interiors C10 - Interior Construction
C20 - Stairs
C30 - Interior Finishes
D Services D10 - Conveying
D20 - Plumbing
D30 - HVAC
D40 - Fire Protection
D50 - Electrical
E Equipment and Furnishings E10 - Equipment
E20 - Furnishings
F Special Construction and Demolition F10 - Special Construction
F20 - Selective Building Demo
G Sitework and Utilities G10 - Site Preparations
G20 - Site Improvements
G30 - Site Civil/Mech. Utilities
G40 - Site Electrical Utilities
G90 - Other Site Construction
Z General Conditions, Overhead, and Profit Z10 - General Conditions
Z20 - Other Indirect Costs
Z30 - Contractor's Fees (Profit)
GRAND TOTAL 2.15 4,846.40

Div. 3

DIVISION 03 - CONCRETE
tc={3C06DEBA-FDB8-8E44-AF88-8AD084E72A88}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: Copy as many division sheets as needed using this template
RS Means Item # Uniformat II Code Item Description Unit Qty Unit Cost ($/unit) Cost ($) Total Cost ($)
Material Labor Equipment Material Labor Equipment
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
GRAND TOTAL 0.00 0.00 0.00 0.00