MAKU residence cost estimation assignment
Summary (MasterFormat)
| COST SUMMARY (MasterFormat) | ||||
| DIVISION | MATERIAL | LABOR | EQUIPMENT | TOTAL |
| 01 - General Requirements | ||||
| 03 - Concrete | ||||
| 04 - Masonry | ||||
| 05 - Metals | ||||
| 06 - Wood | ||||
| 07 - Thermal and Moisture Protection | ||||
| 08 - Openings | ||||
| 09 - Finishes | ||||
| 11 - Equipment | ||||
| 22 - Plumbing | ||||
| 23 - Heating, Ventilating, and Air-Conditioning (HVAC) | ||||
| 26 - Electrical | ||||
| 31 - Earthwork | ||||
| 32 - Exterior Improvements | ||||
| GRAND TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
Summary (Uniformat II)
| COST SUMMARY (UNIFORMAT II) | |||
| Gross Floor Area | GSF = | 2250
tc={1DF46D86-5353-E143-91BC-ED3DDF311C2D}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: Input the correct area of the building |
|
| Division | Breakdown | $/GSF | Cost |
| A Substructure | A10 - Foundations | 2.15 | 4,846.40 |
| A20 - Basement Construction | |||
| B Shell | B10 - Superstructure | ||
| B20 - Exterior Closure | |||
| B30 - Roofing | |||
| C Interiors | C10 - Interior Construction | ||
| C20 - Stairs | |||
| C30 - Interior Finishes | |||
| D Services | D10 - Conveying | ||
| D20 - Plumbing | |||
| D30 - HVAC | |||
| D40 - Fire Protection | |||
| D50 - Electrical | |||
| E Equipment and Furnishings | E10 - Equipment | ||
| E20 - Furnishings | |||
| F Special Construction and Demolition | F10 - Special Construction | ||
| F20 - Selective Building Demo | |||
| G Sitework and Utilities | G10 - Site Preparations | ||
| G20 - Site Improvements | |||
| G30 - Site Civil/Mech. Utilities | |||
| G40 - Site Electrical Utilities | |||
| G90 - Other Site Construction | |||
| Z General Conditions, Overhead, and Profit | Z10 - General Conditions | ||
| Z20 - Other Indirect Costs | |||
| Z30 - Contractor's Fees (Profit) | |||
| GRAND TOTAL | 2.15 | 4,846.40 |
Div. 3
| DIVISION 03 - CONCRETE
tc={3C06DEBA-FDB8-8E44-AF88-8AD084E72A88}: [Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: Copy as many division sheets as needed using this template |
|||||||||||
| RS Means Item # | Uniformat II Code | Item Description | Unit | Qty | Unit Cost ($/unit) | Cost ($) | Total Cost ($) | ||||
| Material | Labor | Equipment | Material | Labor | Equipment | ||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| GRAND TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |