Wk8 DQ - Managerial Eonomics
The Economics of Information
© 2017 by McGraw-Hill Education. All Rights Reserved. Authorized only for instructor use in the classroom. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Chapter 12
Learning Objectives
Identify strategies to manage risk and uncertainty, including diversification and optimal search strategies.
Calculate the profit-maximizing output and price in an environment of uncertainty.
Explain why asymmetric information about “hidden actions” or “hidden characteristics” can lead to moral hazard and adverse selection, and identify strategies for mitigating these potential problems.
Explain how differing auction rules and information structures impact the incentives in auctions, and determine the optimal bidding strategies in a variety of auctions with independent or correlated values.
© 2017 by McGraw-Hill Education. All Rights Reserved.
2
Measuring Uncertain Outcomes
A variable that measures the outcome of an uncertain event is called a random variable.
Probabilities can be attached to different values of a random variable that denote the chance that a value occurs.
Information about uncertain outcomes can be summarized by the mean (or, expected value) and variance of a random variable.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-3
The Mean and the Variance
3
Measuring Uncertain Outcomes: Mean
The mean of a random variable is the sum of the probabilities that different outcomes will occur multiplied by the resulting payoffs.
If denote the possible outcomes of the random variable and the corresponding probabilities of the outcomes, then the mean of is:
, where .
The mean does not provide information about the risk associated with the random variable.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-4
The Mean and the Variance
4
Measuring Uncertain Outcomes: Variance and Standard Deviation
The variance of a random variable is the sum of the probabilities that different outcomes will occur multiplied by the squared deviation from the mean of the resulting payoffs.
If denote the possible outcomes of the random variable, their corresponding probabilities are , and the expected value of is , then the variance of is:
The variance is a common measure of risk.
The standard deviation is the positive square root of the variance: .
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-5
The Mean and the Variance
5
Risk Aversion
Attitudes toward risk differ among consumers.
A risk-averse consumer prefers a sure amount of to a risky prospect with an expected value of .
A risk-loving consumer prefers a risky prospect with an expected value of to a sure amount of .
A risk-neutral consumer is indifferent between a risky prospect with an expected value of and a sure amount of .
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-6
Uncertainty and Consumer Behavior
6
Managerial Decisions with Risk-Averse Consumers: Product Quality
Risk analysis can used to examine situations where consumers are uncertain about product quality.
Consider a consumer who regularly uses Brand X. If a new product enters the market, Brand Y, under what conditions will the consumer be willing to try the new product?
Issues to overcome and consider:
Relative certainty about Brand X.
At equal prices among other things, a risk averse consumer will continue to purchase Brand X, since a risk averse consumer prefers the sure thing (Brand X) to a risky prospect (Brand Y).
Two tactics can be employed to induce a risk averse consumer to try a new product:
Lower the price of Brand Y.
Try to convince consumer the new product’s quality is higher than the old product.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-7
Uncertainty and Consumer Behavior
7
Managerial Decisions with Risk- Averse Consumers
Chain stores: may be in a firm’s best interest to become part of a chain store
Standardization, reputation, increased chance of survival
Online reviews
Insurance: the fact that consumers are risk averse implies they are willing to pay to avoid risk.
© 2017 by McGraw-Hill Education. All Rights Reserved.
8
Consumer Search
To identify the low-price seller from among many firms selling an identical product, consumers sometimes incur a cost, , to obtain each price quote.
After observing each price quote, a consumer faces must weigh the expected benefit from acquiring an additional price quote with the additional cost.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-9
Uncertainty and Consumer Behavior
9
Consumer Search
Suppose that three-quarters of stores in a market charge and one-quarter charge .
A consumer observing a price of should stop searching since there is no price below .
What should a risk-neutral consumer do after observing a price of , if search occurs with free recall and with replacement?
One-quarter of the time the consumer will save .
Three-quarters of the time the consumer will save nothing.
The expected benefit from an additional search is: .
A consumer should search for a lower price as long as the expected benefits for an additional search are greater than the cost of an additional search.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-10
Uncertainty and Consumer Behavior
10
Optimal Search Strategy
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-11
Uncertainty and Consumer Behavior
Price
Reservation price:
Price at which a consumer
is indifferent between
purchasing at that price and
searching for a lower price.
Expected
benefits
and costs
Acceptance Price Region
Rejection Price Region
11
Consumer’s Search Rule
The optimal search rule is such that the consumer rejects prices above the reservation price, , and accepts prices below the reservation price. Stated differently, the optimal search strategy is to search for a better price when the price charged by a firm is above the reservation price and stop searching when a price below the reservation price is found.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-12
Uncertainty and Consumer Behavior
12
Increasing Cost of Search
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-13
Uncertainty and Consumer Behavior
Price
Expected
benefits
and costs
Due to
Increase
in search
costs.
13
Manager’s Risk Attitudes
While manager must understand the impact of uncertainty on consumer behavior, uncertainty also impacts the manager’s input and output decisions.
Manager’s risk profiles:
Risk averse: a manager who prefers a risky project with a lower expected value if the risk is lower than a project with a higher expected value.
Risk loving: manager who prefers a risky project with higher expected value and higher risk to one with lower expected value and lower risk.
Risk neutral: manager interested in maximizing expected profits; the variance of profits does not impact a risk-neutral manager’s decisions.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-14
Uncertainty and the Firm
14
Risk Aversion In Action: Problem
A risk-averse manager is considering two projects. The first project involves expanding the market for bologna; the second involves expanding the market for caviar. There is a 10 percent chance of recession and a 90 percent chance of an economic boom. The following table summarizes the profits under the different scenarios. Which project should manager undertake, and why?
a
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-15
Uncertainty and the Firm
| Project | Boom (90%) | Recession (10%) | Mean | Standard Deviation |
| Bologna | -$10,000 | $12,000 | -$7,800 | $6,600 |
| Caviar | 20,000 | -8,000 | 17,200 | 8,400 |
| Joint | 10,000 | 4,000 | 9,400 | 1,800 |
| Safe (T-Bill) | 3,000 | 3,000 | 3,000 | 0 |
15
Risk Aversion In Action: Answer
Managers should not invest in T-Bills
The joint project is assured of making at least $4,000, which is greater than $3,000 under the T-Bill scenario.
Since the expected returns of the bologna project are negative, neither a risk-neutral nor a risk-averse manager would choose to undertake this project.
The manager should adopt either the caviar project or the joint project. Which project will depend on his or her risk preferences.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-16
Uncertainty and the Firm
| Project | Boom (90%) | Recession (10%) | Mean | Standard Deviation |
| Bologna | -$10,000 | $12,000 | -$7,800 | $6,600 |
| Caviar | 20,000 | -8,000 | 17,200 | 8,400 |
| Joint | 10,000 | 4,000 | 9,400 | 1,800 |
| Safe (T-Bill) | 3,000 | 3,000 | 3,000 | 0 |
16
Manager’s Risk Attitudes and Diversification
Notice from the previous problem that by investing in multiple projects, the manager may be able to reduce risk.
The process of potentially reducing risk by investing in multiple projects is called diversification.
Whether it is optimal to diversify depends on a manager’s risk preferences and the incentives provided to the manager to avoid risk.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-17
Uncertainty and the Firm
17
Producer Search
When producers are uncertain about the prices of inputs, an optimizing firm will use optimal search strategies.
These strategies mimic consumer search previously developed.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-18
Uncertainty and the Firm
18
Profit Maximization and Uncertainty
The basic principles of profit maximization can be modified to deal with uncertainty.
If demand (hence, revenue) is uncertain and the manager is risk neutral, then the manager will want to maximize expected profits by producing the output where the expected marginal revenue equals marginal cost:
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-19
Uncertainty and the Firm
19
Profit Maximization and Uncertainty In Action: Problem
Appleway Industries produces apple juice and sells it in a competitive market. The firm’s manager must determine how much juice to produce before he knows what the market (competitive) price will be. Economists estimate that there is a 30 percent chance the market price will be $2 per gallon and a 70 percent chance it will be $1 per gallon when the juice hits the market. If the firm’s cost function is , how much juice should be produced to maximize expected profits? What are the expected profits of Appleway Industries?
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-20
Uncertainty and the Firm
20
Profit Maximization and Uncertainty In Action: Answer
Appleway Industries’ profits are
Since price is uncertain, the firm’s revenues and profit are uncertain. To maximize expected profits, the manager equates expected price with marginal cost.
The expected price is: .
Therefore, manager should produce output where gallons.
Expected profits are $645.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-21
Uncertainty and the Firm
21
Asymmetric Information
Uncertainty can profoundly impact markets abilities to efficiently allocate resources.
Some markets are characterized by individuals who have better information than others.
Implication: Those individuals with the least information may choose not to participate in a market.
When some people have better information than others in a market, the information people have is called asymmetric information.
There are two specific manifestations related to asymmetric information in markets:
Adverse selection
Moral hazard
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-22
Uncertainty and the Market
22
Asymmetric Information: Adverse Selection
Adverse selection refers to situations where individuals have hidden characteristics and in which a selection process results in a pool of individuals with undesirable characteristics.
In this context, a hidden characteristic is something that one party to a transaction knows about itself but which are unknown by the other party.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-23
Uncertainty and the Market
23
Asymmetric Information: Moral Hazard
Moral hazard refers to a situation where one party to a contract takes a hidden action that benefits his or her at the expense of another party.
In this context, a hidden action is an action taken by one party in a relationship that cannot be observed by the other party.
One way to mitigate the moral hazard problem is an incentive contract.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-24
Uncertainty and the Market
24
Signaling
Another way to mitigate the problem of moral hazard is signaling, which is an attempt by an informed party to send an observable indicator of his or her hidden characteristics to an uninformed party.
For signaling to be effective it must be:
observable by the uninformed party.
a reliable indicator of the unobservable characteristic(s) and difficult for parties with other characteristics to easily mimic.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-25
Uncertainty and the Market
25
Screening
A final way to mitigate the moral hazard problem is by screening, which is an attempt by an uninformed party to sort individuals according to their characteristics.
Screening may be achieved through a self-selection device.
A self-selection device is a mechanism in which informed parties are presented with a set of options, and the options they choose reveal their hidden characteristics to an uninformed party.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-26
Uncertainty and the Market
26
Types of Auctions
An auction is a mechanism where potential buyers compete for the right to own a good, service, or, more generally, anything of value.
Sellers participating in an auction offer an item for sale, and wish to obtain the highest price.
Buyers participating in an auction seek to obtain the item at the lowest possible price.
Bidders’ risk preferences can affect bidding strategies and the expected revenue a seller receives.
Four basic auction types:
English (ascending-bid)
First-price, sealed-bid
Second-price, sealed-bid
Dutch (descending-bid)
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-27
Auctions
27
Differences Among Auctions Types
The timing of bidder decisions (simultaneously or sequentially)
The amount the winner is required to pay.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-28
Auctions
28
English Auction
An English auction is an ascending sequential-bid auction in which bidders observe the bids of others and decide whether or not to increase the bid. The auction ends when a single bidder remains; this bidder obtains the item and pays the auctioneer the amount of the bid.
Bidders continually obtain information about one another’s bids.
Bidder who values the item the most will win.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-29
Auctions
29
First-Price, Sealed-Bid Auction
A first-price, sealed-bid auction is a simultaneous-move auction in which bidders simultaneously submit bids to an auctioneer. The auctioneer awards the item to the highest bidder, who pays the amount bid.
Bidders obtain no information about one another’s bids.
Bidder who values the item the most will win.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-30
Auctions
30
Second-Price, Sealed-Bid Auction
A second-price, sealed-bid auction is a simultaneous-move auction in which bidders simultaneously submit bids to an auctioneer. The auctioneer awards the item to the highest bidder, who pays the amount bid by the second-highest bidder.
Bidders obtain no information about one another’s bids.
Bidder who values the item the most will win, but pays the second-highest bid.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-31
Auctions
31
Dutch Auction
A Dutch auction is a descending sequential-bid auction in which the auctioneer beings with a high asking price and gradually reduces the asking price until one bidder announces a willingness to pay that price for the item.
Bidders obtain no information about one another’s bids throughout the auction process.
Bidder who values the item the most will win and pay the amount of his or her bid.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-32
Auctions
32
Strategic Equivalence of Dutch and First-Price Auctions
The Dutch and first-price, sealed-bid auctions are strategically equivalent; that is, the optimal bids by participants are identical for both types of auctions.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-33
Auctions
33
Information Structures
While the four auction types differ with respect to the information bidders have about the bids of other bidders, bidders also have different information structures about the value of their own bids.
Perfect information
Independent private values
Affiliated (or correlated) value estimates
Special case: common-value auctions
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-34
Auctions
34
Optimal Bidding Strategies for Risk-Neutral Bidders
An optimal bidding strategy for risk-neutral bidders is a strategy that maximizes a bidder’s expected profit.
Optimal bids depends on the
type of auction.
information available to bidders at the time of bidding.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-35
Auctions
35
Strategies for Independent Private Value Auctions
With independent private values, bidders know his or her own values prior to the auction start.
English auction
Remain active until the price exceeds his or her own valuation of the object.
Second-price, sealed-bid auction
Bid his or her own valuation of the item. This is a dominant strategy.
First-price, sealed-bid auction (strategically equivalent to the Dutch auction)
Bid less than his or her valuation of the item. If there are bidders who all perceive valuations to be evenly (or uniformly) distributed between a lowest and highest possible valuations, and , respectively, then the optimal bid, , for a player whose own valuation is is:
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-36
Auctions
36
Strategies for Independent Private Value Auctions In Action: Problem
Consider an auction where bidders have independent private values. Each bidder perceives that valuations are evenly distributed between and . Sam knows his own valuation is . Determine Sam’s optimal bidding strategy in:
A first-price, sealed-bid auction with two bidders.
A Dutch auction with three bidders.
A second-price, sealed-bid auction with 20 bidders.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-37
Auctions
37
Strategies for Independent Private Value Auctions In Action: Answer
Sam’s optimal bid in a first-price, sealed-bid auction with two bidders is .
Sam’s optimal bid in a Dutch auction with three bidders is .
Sam’s optimal bid in a second-price, sealed-bid auction with 20 bidders is to bid his true valuation, which is .
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-38
Auctions
38
Strategies for Correlated Values Auctions
Bidders do not know their own valuations for an item, nor others’ valuations.
Implication: makes bidders vulnerable to the winner’s curse, which is the “bad news” conveyed to the winner that his or her estimate of the item’s value exceeds the estimates of all other bidders.
To avoid the winner’s curve in a common-value auction, a bidder should revise downward his or her private estimate of the value to account for this fact.
The auction process may reveal information about how much the other bidders value the object.
The winner’s curse is most pronounced in sealed-bid auctions since bidders don’t learn about other player’s valuation.
English auction, in contrast, provides bidders with information. Therefore, bidders may have to revise up their initial bids.
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-39
Auctions
39
Expected Revenues in Alternative Types of Auctions
Comparison of expected revenue in auctions with risk-neutral bidders
© 2017 by McGraw-Hill Education. All Rights Reserved.
12-40
Auctions
| Information structure | Expected revenues |
| Independent private values | English=Second-price = First-Price = Dutch |
| Affiliated value estimates | English > Second-price > First-price = Dutch |
40