Maintenance Bulletin 29L
To: All offshore rig managers
From: Chief Engineer, Quality Assurance
Subject: Cameron BOP Stack SEM
It has come to the attention of QA that there is a possible issue
with your blowout preventer stack (BOP) arising from your last
overhaul. Upon review by QA of testing performed by the
manufacturer of your BOP's Subsea Electronic Module (SEM)
which was installed during that overhaul, we have concluded
that the manufacturer's (Mansk Controls) testing protocols are
highly flawed and unable to correctly identify faulty SEMs.
As you are aware, your SEM controls power distribution and
signal transmission to the Emergency Disconnect System
(EDS). Without a fully functioning SEM, the EDS will not
activate should it be needed.
QA has developed a protocol for testing Mansk SEMs and
applied it to 87 ready-to-ship SEMs at the Mansk factory.
Twenty-three of these units failed.
SEMs currently in service can be tested using this protocol.
Testing can be done in-situ and does not require bringing the BOP to the surface. It is disruptive to
normal operations, however.
Our testing protocol will require you to shut-in for a significant portion of a round, thereby cutting by
25% your requested production for the test round. We also estimate a cost under $1 million.
Note that this MB 29L is provided for information purposes only at this time. On this specific issue, QA is
making no recommendation on proper course of action (per VP Ops Directive from home office), but
allowing rig managers to make their own call based on their own specific circumstances. FYI, your SEM
will be replaced with a proven unit during your next BOP overhaul.
James A. Scott QA Chief Engineer