Need help with a project scope and wbs
Due: Sunday, 11:59 p.m. EST of Unit 2.
Points: 100
Overview:
In this assignment, you will produce two documents: a project scope and the Work
Breakdown Structure (WBS). Good scope management ensures that all the work
required, and only the work required to complete the project, is included in the project.
As a Project Manager, it is your responsibility to ensure effective scope management
throughout the life of your project. By applying a well-planned and structured approach
to scope management you can ensure this.
From A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Sixth
Edition: “The WBS is a deliverable-oriented hierarchical decomposition of the work to be executed by the project team, to accomplish the project objectives and create the
required deliverables… The WBS represents the work specified in the currently approved project scope statement. Components comprising the WBS assist the
stakeholders in viewing the deliverables of the project” (2004, p. 112)
Instructions:
For the scope plan, may use the template posted in the unit or you can use your
template as long as you obtain an approval from your instructor.
Project Scope Elements:
Who has authority and responsibility for scope management.
How the scope is defined (i.e. Scope Statement, WBS, WBS Dictionary,
Statement of Work, etc.).
How the scope is measured and verified (i.e. Quality Checklists, Scope
Baseline, Work Performance Measurements, etc.).
The scope change process (who initiates, who authorizes, etc.).
Who is responsible for accepting the final project deliverable and approves
acceptance of project scope.
PMG699 – Capstone
Unit 2 Assignment: Develop Scope & WBS
Work Breakdown Structure (WBS) Elements:
The hierarchal diagram that you create must show the entire project using a
minimum of 3 levels: represented as a Level 1 component, subdivided into
Level 2 components, and some or all Level 2 components subdivided into
Level 3 components.
You can continue to subdivide all the components in the same manner until
you reach a point at which you think the components you defined are
sufficiently detailed for planning and management purposes.
Note: If an activity is not part of the WBS, the activity is not part of the project and
when all the activities in all the 3 components are added up, it must equal the scope.
Assignment Guidelines:
Project Score: Three pages in length, excluding the Title and Reference pages. WBS is one page in length – you may use Excel or MS Project. APA format, including in-text citations for referenced works.
Be sure to read the criteria, by which your paper will be evaluated, before you
write, and again after you write.
Evaluation Rubric for Unit 2 Assignment
CRITERIA Deficient
Needs
Improvement
Proficient
Exemplary
0-23 points 24-31 points 32-39 points 40 points
Project Scope
Plan
The project scope
is not substantial
and does not
include most of
the project scope
elements
The project scope
is not detailed and
contains some
elements of the
Requirements,
Scope Statement,
Scope Baseline,
Integrated
Change control,
validate scope
and control scope
elements
The project scope
is detailed and
contains some
elements of the
Requirements,
Scope Statement,
Scope Baseline,
Integrated
Change control,
validate scope
and control scope
elements
The project scope
plan is detailed
and contains all
required
elements.
0-26 points 27-35 points 36-44 points 45 points
Work Breakdown
Structure
WBS is not
substantial and
does not include
most of the
elements.
WBS is detailed
and includes tasks
and activities
decomposed into
1 level. All
activities are listed
and decomposed
in a manageable
manner
WBS is detailed
and includes tasks
and activities
decomposed into
2 levels. All
activities are listed
and decomposed
in a manageable
manner
WBS is detailed
and includes tasks
and activities
decomposed into
at least 3 levels.
All activities are
listed and
decomposed in a
manageable
manner.
0-8 points 9-11 points 12-14 points 15 points
Clear and
Professional
Writing and APA
Format
Errors impede
professional
presentation;
guidelines not
followed.
Significant errors
that do not
impede
professional
presentation.
Few errors that do
not impede
professional
presentation.
Writing and format
is clear,
professional, APA
compliant, and
error free.