const cost & Bid project 6
WEEK 6
COURSE: CONSTRUCTION COST ANALYSIS AND BIDDING
LEVEL: GRADUATE
ASSIGNMENT # 6
TOTAL POINTS: 100
LEARNING OBJECTIVES:
After successfully completing this assignment, students will be able to:
• Prepare an estimate for studs and drywall
• Estimate cost of electrical work
Note: Your work should be professionally presented and all the steps for calculations must
be included.
Q1.
a) Determine the number of steel studs needed for the tenant finish shown in Figure below. The exterior walls are existing. The studs are spaced 16 inches on center. Add two studs
for each door and each intersection.
b) Also, determine the number of 4-foot-wide by 8-foot-high sheets of drywall needed for the tenant finish in Figure below. The walls are 8 feet high. The exterior walls need
drywall on the interior side only. The interior walls need drywall on both sides. Add 5
percent waste. 60points
WEEK 6
Q2.
Determine the estimated cost of the electrical for the residence shown in Figure below using the
following assembly costs. The associated wiring is included in the cost of each assembly. What
is the fixture allowance for the residence?
Switches = $50 Duplex outlets = $50 GFCI outlets = $60 Light fixtures (includes $30
fixture allowance) = $80 Main service = $1,000
40 points