CONSTRUCTION PROJECT MANAGEMENT 2

profilemoore05
Assignment2.docx

Suggested format: Times New Roman 12 points, single spaced, 1” margin all around, APA style for references Note: All assignments will be checked for plagiarism using SafeAssign. The similarity index should not be greater than 35% on the report. You should always provide references at the end.

Q1.

a) What are the major parameters to be considered in the prequalification?

Assessment of a contractor (you can use either a Design-Build or Design-Bid Build delivery system)? 30 points

b) Investigate the local criteria in your city* that is being used in the prequalification of general contractors. 20 points

Q2. Activity:

Visit the McGraw-Hill Dodge Construction Reports Website

(http://dodge.construction.com) and find the three largest projects currently being under bidding process in your city* in the categories of commercial, transportation and utilities. Report the provided general description (‘‘type’’), estimated cost (‘‘valuation’’), and their owner. You should include screenshots with your answers.

Please mention your city in the start of your write-up. You should either create a table with three categories or provide the information as separate sections.

50 points

*Distant learning students can pick any city in the United States and complete the assignment accordingly.