EC
PROCUREMENT (MM) Case Study
Procurement Process using SAP GUIDELINES: 1. In this assignment you are to work through the cash to cash business cycle and processes using SAP. 2. You will be required to capture clear screen shots (using MS Word, please see the given video on how to do this) to document your work. 3. Your USER-ID must be clearly visible in all the screen shots that you take. 4. The tutorial below was prepared on a server named BK8; your assigned server for this assignment is HONDA and client num is 525 as given below: SAP Server information for this semester: System HONDA Server HONDA.UCC.UWM.EDU Number 00 Client 525 5. Throughout the tutorial, wherever you are asked to enter ###, this means enter your 3-digit LEARN-###. 6. In this tutorial the userID being used is GBIFAC-001; You should use your own userID; your userID is LEARN-#### (are given in MyGrades on BB). 7. As soon as you start working on this assignment, create a MS Word document and name it as yourlastNameCH8SAP. Eg. If your last name is Smith, your document must be named SmithCh8SAP. 8. Take screen shots wherever instructed and insert the screen shots into your word document. 9. Upload your Word doc to BB before the due date. 10. If you email me about anything about SAP, please include your LEARN-### in the email. 11. No late submissions will be accepted for any reason. Your submission should be 1 page containing the required 4 screen shots. Note: pay attention to all instructions and what you are supposed to enter. If the tutorial instructions are followed precisely, you should have NO problems with this assignment. If you make a mistake in one of the steps, you may need to redo that step or the step before it. Description of the Procurement Process: The procurement process is the processes of ordering and obtaining raw materials or any other supplies from suppliers or vendors to the business. This process is composed of three major activities: Order (materials or supplies from suppliers); Receive (the ordered material); and Pay (for the material that was ordered and delivered) The procurement process generally at CBI (Chuck Bike International) begins with the placement of an order for purchase from a supplier. This function can be performed by individuals in the purchasing unit within the organization, notably the purchasing manager. The order for procurement would be sent to the supplier who will in turn deliver materials and/or services to the organization. In turn, these materials and/or services must be received by the organization to take ownership of them. This step in the process is generally handled in the warehouse by the warehouse manager (usually only for materials, not services). Ownership of the materials and/or services results in a liability or an obligation to compensate the supplier with payment. The accounting department would then be responsible for settling this liability by sending payment to the supplier. Wally has qualified various suppliers as being able to supply the enterprise with goods (raw materials) needed by the Assembly Manager for production. The suppliers will provide him with quotes on these materials so he can make an informed decision as to which supplier will be selected to supply the needed goods (raw materials). Once this decision has been made, Wally then creates a Purchase Order and sends it to the selected supplier. When the supplier delivers the ordered raw materials, Wally then begins inbound processing by receiving the goods (raw materials) into inventory, where the quantity available is updated. Ann then assumes the next fundamental step in the procurement process by receiving the Bill (invoice) from the supplier. She then uses the Bill (invoice) as a basis for submitting payment to the supplier, completing the fundamental steps in this procurement process. As you can also see, the procurement of the goods (raw materials) is needed to provide an adequate supply of raw materials on inventory to support the Production process. The result of the Production process will thus lead to an increase in Finished Goods Inventory.
|
Table of Contents
Step 1: Create Purchase Order 4
Step 2: Goods Recept Purchase Order 12
Step 3: Enter Incoming Invoice 15
Step 4: Post Outgoing Payments 18
Step 5: Submission of Document to Word 20
|
GBI Enterprise Structure
|
|
Step 2: Goods Recept Purchase Order |
|
Receive into inventory the stock items ordered from Space Bike Composites in the previous task. A goods receipt document will be created referencing our purchase order To create a goods receipt for a purchase order, follow the menu path: Logistics ► Materials Management ► Inventory Management ► Goods Movement ► Goods Receipt ► For Purchase Order ► GR for Purchase Order (MIGO) |
Menu path
|
|
Make sure that Goods Receipt and Purchase Order are selected in the dropdown lists. Enter your PO number in the field next to them.
|
|
|
|
Figure MM2-1 |
|
After you PO number is entered, press Enter or click the Enter icon You should see two lines with 20 each for Water Bottle and 30 each for Water Bottle Cage. If the background color in Line 1 or 2 is blue, then close the detail data section by clicking the Detail Data icon
|
|
|
|
Figure MM2-2 |
|
Checking OK box and Enter TG00 for SLoc (Storage location).
|
|
|
|
Figure MM2-3 |
|
Finally, |
|
|
|
Figure MM2-4 |
|
The Material document number will be displayed at the bottom of the screen. Write down this number for future use. And, take a screen shot of the bottom portion of the screen showing both the Material document Number AND your LEARN-###. Paste the screen shot into a Word document used to document your work.
Click on the exit icon to return to the SAP Easy Access screen.
|
|
|
|
|
|
|
Step 3: Enter Incoming Invoice |
|
Enter an invoice received from Space Bike Composites for 470.00 associated with the recent PO and goods receipts. This invoice will be posted to an existing G/L expense account in your Chart of Accounts and saved as an Accounts Payable to Space Bike Composites To record the picking of the material, we change the delivery document. To change the delivery document, follow the menu path: Logistics ► Materials Management ► Logistics Invoice Verification ► Document Entry ► Enter Invoice
|
|
|
Enter today’s date as Invoice date using F4 and enter the amount from the invoice above (470.00) in the Amount field and select XI as Tax Code (field next to Tax Amount). Then, type in Your Number ### as Text and click on |
|
|
|
Figure MM3-1 |
|
Enter (or find) your PO number in the middle of the screen (next to the drop-down field with Purchase Order/Scheduling Agreement) and press Enter or click on The system loads vendor data and displays the updated Invoice screen. Enter TX0000000 in the Jurisd. Code field. |
|
|
|
Figure MM3-2 |
|
Click on
Write down this number for future use. Take a screen shot of the bottom portion of the screen showing both the Invoice Number AND your LEARN-###. Paste the screen shot into a Word document used to document your work. |
Figure MM3-3 |
|
Click on the exit icon to return to the SAP Easy Access screen.
|
|
|
|
|
|
|
Step 4: Post Outgoing Payments |
|
Issue a payment to your Space Bike Composites vendor to settle their entire Accounts Payable balance. Note that the amount due to them includes both of the invoices that you have previously entered To post payments to a vendor, follow the menu path: Accounting ► Financial Accounting ► Accounts Payable ► Document Entry ► Outgoing Payment ► Post |
|
|
In the Post Outgoing Payments: Header Data screen, enter (or select) today’s date as Document Date. In the Bank data field group, enter Account 100000 (Bank Account), the amount you are going to pay (470), and your number in the Text. In the Open item selection field group, your vendor number 105### for Space Bike Composite in the Account box. |
|
|
|
Figure MM4-1 |
|
Select Invoices selected will be displayed in blue. At the bottom of the screen, you should see that the total amount has been fully assigned. |
|
|
|
Figure MM4-2 |
|
The Post Payment Document is updated and Document number screen appears.
|
Figure MM4-3 |
|
Take a screen shot of the screen showing both the Post Payment Document Number AND your LEARN-###. Paste the screen shot into a Word document used to document your work.
Click on the exit icon to return to the SAP Easy Access screen.
|
|
|
|
|
|
|
Step 5: Submission |
|
Write your name and LEARN-### User ID at the top of the Word document and ensure that it contains screen shots with the following elements and submit to Blackboard. |
|
|
Screen Shot #1 (Figure MM1-12): Standard PO (10 points)
|
Figure MM1-12 |
|
Note: LEARN-### is visible in the upper right side of the screen. Screen Shot #2 (Figure MM2-4): Material document number (10 points)
|
Figure MM2-4 |
|
Screen Shot #3 ( Figure MM3-3 ): Invoice document number (10 points)
|
Figure MM3-3 |
|
Screen Shot #4 ( Figure MM4-3 ): Post Payment document number (10 points) The Post Payment Document is updated and Document number screen appears.
|
Figure MM4-3 |
|
|
|
|
|
|
OR
IF you are using a SAP system that shows userID (LERAN-###) at the bottom of the screen (in the status bar. Your screen shots should look like this:
Page 22 of 23