DIP-Fr-AD
1
Project Title: Combined Sewer Overflow Power Generation Project Report
Department of Mechanical and Construction Engineering
Northumbria University, Newcastle upon Tyne, NE18ST, United Kingdom
Module Title: MSc Advanced Practice
Module Code: KB7056
Author Name : ARATHI REDDY
Id : W20027842
Business Name
Company/business location
North East
Pity Me, Durham
2
Executive Summary
Combined Sewer Overflow Power Generation is a project aimed to determine a range of
power requirements for the environmental remediation solutions that could be implemented at
each CSO. Northumbria University students were tasked to completing the Combined Sewer
Overflow Power Generation, and this report provides them with the information they need to
guarantee that the project is successfully completed and managed. In order to accomplish this,
the report has produced Programs and Schedules that may be implemented to the project based
on the project's characteristics and the needs of the client. Because of this, the report established
Management of relevant training programs for the project based on the demands of the client,
including the requirement for early project delivery and regular client engagement in the project.
On the basis of this, the Northumbria student recommends the most relevant solutions to be
employed in the project, which it is believed will be most effective in achieving the largest
possible benefit for the client.
3
Introduction
The advanced practices semester will help a lot of things to lean in my upcoming projects and
real-time experiences. Each stage of work is very challenging for me and makes me give the best
output to the client and prove myself as the best. Mainly this semester teach me how to engage
the client and what type of work I have to be present in a real-time project, and how to engage in
the project phases and the engagement of work has expressed below.
How students engaged the work
Stage.1
The Northumbrian pupils showed a high level of enthusiasm for the task. The student’s
determination to do their best was evident in their demeanor and positive attitude, which all
indicated how they were going to approach the job. In order to participate in the project, the
students divided themselves into groups, with each group being assigned a specific aspect of the
work.
Stage.2
Each group was led by a group leader, whose primary responsibility was to ensure that the work
flowed smoothly. Each group was given a specific amount of time in which to complete their
tasks. The goal of establishing a time restriction for completion of the task was to ensure that the
entire project was completed on schedule.
Stage.3
The project manager was responsible for ensuring that the project was presented efficiently and
on time. The students devised four distinct steps for delivering high-quality project presentations
as part of the process of ensuring high-quality project presentation.
The steps are as follows:
Preparation of a bio
Project allocation
Midterm presentation
Final presentation
4
Step One
Students were expected to prepare data. The preparation of data was a vital
component of the project's overall success. At this point, students were given the responsibility
of preparing their own data, following which they were divided into groups based on the
information contained in their data forms. Stage one was extremely important since it
necessitated the application of individual knowledge and skills for the students. Many students
attempted to be critical in the application of their own expertise in order to prepare data
throughout the stage one.
Step Second
Project allocation, the advanced groups that had been formed were assigned a project to
work on. It was necessary for the groups to organize themselves in order to work on the project.
It was envisaged that each group would have a group leader as well as distinct positions inside
the group for the purpose of subdivision of work. The group leaders were responsible for
ensuring that all proper procedures were followed within their respective groups. In addition,
they were expected to submit the completed project to their supervisor for review and approval.
The formation of separate groups was necessary in order to ensure that the project was presented
in a professional manner.
Step Three
The students were required to produce a midterm presentation for the client at the third
stage, which was called the midterm presentation. This stage was critical in determining the
direction of the group's endeavor. The students were obliged to present their project to the client,
after which the client would provide positive feedback on both the project and the students'
presentation abilities. Additionally, the client was required to either give a clear pass for the
continuation of the project or turn down the project and request the students to participate in the
project from the beginning again. Following the presentation of the project and the receipt of
feedback from the client, the group leaders were required to deliver a final presentation to the
group.
5
Step Four
The final and most important stage is the final presentation. At this point, the project's final
presentation was given to the audience. It was decided that the projects that had passed would
have the opportunity to make a final presentation. This stage signified the conclusion of the
project presentation and the awarding of final grades or an award to the best project. The project
managers and students got heartfelt acclaim for the efforts they put forth to see that the projects
were completed and delivered to the client on time. In addition, the client praised their efforts
because they were collaborative.
About the Client
1Northumbria water is a water-based company to provides water & sewerage services to
northeast locations in England. It was founded in 1989 with a base in Durham city, England. It
occupies almost 9400 km2 urban area which contributes majorly populated rural districts of
Durham and Northumberland.
About the project
The Northumbria Combined Sewer Overflow Power Generation project was sponsored by
University of Northumbria water. The primary goal of the client, to determine a range of power
requirements for the environmental remediation solutions that could be implemented at each
CSO (Rizzo et al., 2020). Following the recommendations of this project, in order to fulfill its
objectives of from various sources and Hydro power is a very efficient source of renewable
energy.
1 Northumbria water
6
Source:https://images.app.goo.gl/2HL3AHhArP2vAjBR8
Project Challenges
This document gives a report based on the project Combined Sewer Overflow Power
Generation. Main goal of Combined Sewer Overflow is to Determining a range of power
requirements for the environmental remediation solutions that could be implemented at each
CSO (Botturi et al., 2020). Northumbrian Water has 1500 CSOs within their sewer network.
Combined sewer networks transport sewerage from domestic and industrial facilities as well as
rainwater from streets and pavements. During times of heavy rain, when the flow capacity
within the sewer is likely to be exceeded, CSO’s allow the discharge of raw sewerage into water
courses such as streams and rivers. CSO’s are effectively overflow valves that avoid discharge
of raw sewerage in homes and streets. It was expected of the students to produce plans and
schedules that might be employed in the project, taking into consideration the features of the
project as well as the needs of the client. It was expected that in the report, the students would
describe clear solutions for this project that were suited for client needs, including the need for
early delivery of the project and the necessity for constant client involvement in the project. A
students from Northumbria University people made recommendations for the most appropriate
solutions to be used in the project and for the client ratifications.
7
Project Team: Team Members and Responsible tasks
In total, there are three people on the project team.
ARATHI REDDY: Project Manager (PM),
Each member of the team was responsible for completing a certain assignment. ARATHI
REDDY was to Plan and develop the project ideas, lead the team, Monitor the project progress,
and Evaluate the project Performance.
OMER KHAN: Communication Lead, and
OMER KHAN was to develop the communication plans, Implementing the work
strategies and Barrier between the client and team.
RANGA SAI: Resource Investigator.
RANGA SAI was to Exploring & Reporting Back on ideas, develop the outside sources
and implementing the new sources.
My role in the project
I was hired as a project manager. My responsibilities included Planning and developing
the project ideas, leading the team, Monitoring the project progress, and Evaluating the project.
As a project manager, I make it a point to involve team members in the completion of their tasks.
I was also required tomanage the production of the required deliverables, planning and
monitoring the project, adopting any delegation and use of project assurance roles within agreed
reporting structures and preparing and maintaining project, stage and exception plans as required.
What I learnt from the project stages
Being a member of a student's team has provided me with numerous opportunities to
learn about communication, leadership, and teamwork. Throughout the course of the project, I
came to realize that communication is essential for any effective collective effort. Because we
were not permitted to consult during the initial stage, it was a little difficult for me. I took my
time to figure out what was needed to be accomplished. The second step was a little less difficult
8
because we were working in groups and were permitted to express our thoughts. I have come to
know that communication is really effective, especially when working in a group. We were able
to create a suitable working environment because of effective communication.
As previously noted, another thing I have learned is the importance of leadership. During
the project group stages, we were given the opportunity to select leaders for each group. The
leaders' role was to organize and ensure that high-quality work was being done at the group and
individual levels of organization. It was necessary to maintain steady leadership throughout the
stage group project in order for the project to be completed. Many other groups failed to deliver
their project to the client as a result of inadequate leadership on the part of the project team. As a
result, I have learned that effective leadership is essential for every project's success.
Challenges faced when writing the report
Impact on Communication
Poor communication was one of the challenges that were experienced during the course
of drafting this report. When it comes to teamwork, coordination is not considered a separate
activity; rather, it is referred to as the context of group work in some circles. Communication
should be maintained throughout the project, from the planning stage to the control phase. The
absence of this function will cause the group's work to change and become ineffective, and the
effect of the interaction between the positions of authority and the work of the team on the
group's work will be diminished as well. Coordination kicks off all actions in a team's work and
ensures that they are strong and successful in accomplishing the group's goals. As a result, there
is greater harmony between individual efforts to attain group objectives.
Conflict Resolution
Conflicts are reduced, disputes are resolved, time is spent, delays are experienced, apathy
is experienced, and other organizational difficulties are encountered. As a result, with the
assistance of communication, the group can reach its objectives more quickly. Additionally,
networking activities aid in the improvement of relationships inside the group. Team leaders
coordinate their efforts with the member, which aids in the development of positive relationships
9
between the two of them (Locke et al., 2013). Coordination is widely regarded as the essence of
cooperative endeavors. When it comes to achieving common goals, it is necessary for a group's
many features and activities to be harmonized and coordinated. Leaders are unable to bring
together the diverse components of a team into a cohesive whole unless there is effective
communication amongst all members of the team.
Challenges faced when handling Combined Sewer Overflow Power Generation project
The project presented a number of difficulties for me, including the selection of team
roles and functions, communication, project document editing, and final presentation, to name a
few examples. Because everyone is proficient in their respective duties and obligations, I am
only experiencing a minor difficulty in assigning roles and responsibilities to the team at this
moment. To get over this, we did a simple thing: we cut out the forms in the group and collected
all of the ideas, following which we decided on the duties and responsibilities of the group.
Communication is the most difficult obstacle in every project's execution. Because we are all
unfamiliar with this type of culture, editing project documentation presents a significant problem
during the semester of created practices. Initially, we were unsure about how to format various
forms of writings in accordance with the style of the United Kingdom. Everyone in the group, on
the other hand, was quite helpful and assisted one another in preparing texts. Presentation is
another significant issue because, while we initially believe it will be difficult, we eventually
provide an amazing presentation that incorporates all of the client's features and benefits.
Professional & Personal Reflection on Combined Sewer Overflow Power Generation
project
When it comes to project proposals, they are categorized as a sort of language that is
frequently used to streamline the working ties that exist between an institution and its external
partners, according to the International Standardization Organization (Locke et al.,
2013).Whenever it comes to research frameworks, a project is sometimes referred to as a first
phase because it is utilized to develop a project concept and its outcomes, in addition to the
outcomes that the researcher aims to attain as a result of his or her research program. As a
10
general rule, each form of development project should include a list of all the tasks and activities
that will be involved in all of the work, as well as a description of the project vision and a
description of the project's historical context.
Steps Used in the Combined Sewer Overflow Power Generation project
An extensive series of steps were taken in order to Combined Sewer Overflow Power
Generation project including the following:
First step: Introduction of the project
Second step: Explaining various concepts in the project
Third step: Project identification
Fourth step: The project process
Fifth step: Delivery of deliverables and the definition of success and criteria
Sixth step: Outlining the plan and approach
Seventh step: Installation of the project.
Eighth step: outlining the schedules
In addition to project specifics such as the facility's name and its title, a project overview,
a project deadline, and project communications involving anyone who was involved in the
project as a whole were all included in the project details section. This is critical because it
serves as the foundation for carrying out the complete research proposal and obtaining the
resources necessary to carry out the research proposal activities and activities related to the
research proposal. It was necessary to define the problem category in order to identify a broad
issue that the project was attempting to address, as well as the reasons why the issue was deemed
a problem and the reasons why it was necessary to fix the problem in the first place.
In the overview section of the project, the goal linked with this section was to explain the
many factors that drove the project and to indicate the stated objectives (Springer, 2012). The
11
writing in this part is concise and extensive. Why and ‘what’, ‘how’, and the time that would be
spent on the project plan was well outlined. It is at this point when the backdrop of the project is
explained. This included offering short sentences that helped clarify the Project-related issue.
The current situation regarding the issue and the essential reasons why the audience needs to care
about coming up with an effective set of answers was outlined in full (Botturi et al., 2021). One
of the primary goals linked with this section was to provide information on how to construct a
timeline for attaining the solution as well as information on the resources available in other areas.
There was a list of all the deliverables that were expected to be finished after the completion of
the full project, which was provided in relation to the project's delivery schedule. There was a
guarantee that all deliveries would arrive at their designated time.
It was determined that the project module phase corresponded to the phase of developing
a specific plan for achieving the various types of objectives identified in the project research.
This is frequently referred to as the first phase of a proposal since it specifies a course of action
that has been identified to assist in providing a solution to the problem and helps to ensure that
appropriate research has been conducted before making a choice (Chen et al., 2019). During the
presentation, the approach that was taken was highlighted, and the development of a goal-
oriented approach was discussed. This included putting together some sort of project summary
consisting of a few phrases that demonstrated the broad type of project design strategy used in
the project. This contains details on how the identified team will be successfully formed, the
types of tools that will be used, and how the adjustments will be taken into account during the
performance evaluation process (Ruppelt et al., 2020). This demonstrates how the entire process
will be carried out as well as the seriousness of the research proposal, since it frequently
describes the technique to be employed to ensure the effective implementation of project
outcomes and delivery schedules.
Delivery Description and Success Conditions section assisted with the presentation of a
picture of the numerous types of activities and Attributes linked to delivery, as well as the main
approaches to comprehend how a project works and functions well (Bonnel et al., 2014). Using
a functioning delivery date, as well as a description of what the target project will produce and
12
what customers may expect from it as cloud computing systems that will perform best without
generating inefficient general cloud computing systems, this has been accomplished successfully.
A risk register, which includes a list of risk factors and potential mitigation efforts, is
included in Step 7, Risk Analysis and Management. This section includes an analysis of the
various types of risks and risks that may affect research, as well as a risk register, which includes
a list of risk factors as well as potential mitigation efforts, which must be used to combat the
various types of risks and risks that may affect research. Part of Step 8, which specifies the
Schedules, was devoted to the division of labor and the estimation of time frames, in addition to
the identification of all project deliverables. There was also a presentation of the Project Plan,
which included the division of labor and time projections. A list of all of the actions required for
this project is created, as well as an estimate of the number of hours required to complete each of
them is provided. One of the primary goals linked with this section was to provide information
on how to construct a timeline for attaining the solution as well as information on the resources
available in other areas.
Finally, the installation section was the final stage of the project's completion. It takes
place after ensuring that all of the steps have been implemented and completed completely.
There was some reworking involved to make the Combined Sewer Overflow Power Generation
projectmore interesting, thorough, and appealing. The project also included soliciting any
relevant comments that may be available and ensuring that the proposed concept is well-planned
and visually appealing. This is vital because it allows you to put the finishing touches on the
entire research proposal and ensure that everything is in place, in the proper order, and with a
thorough knowledge.
The goal for Combined Sewer Overflow Power Generation project was to Review
methods of electrical power generation at a CSO location: light, kinetic movement of sewerage,
and the project was to conduct research and develop extra materials to supplement the already-
developed training program. Several diagrams were utilized in this part, including Generation of
sewage power diagram and Hydro power and storage diagram (Springer, 2012).
13
Future Focus
Generation of sewage power diagram represents a Hydro power which a very efficient
source of renewable energy. Hydropower systems are very efficient because of the density of
water, the force of gravity and the technological advantages of today. These systems can cover
up to 90% of the energy of water into electric energy, which is an astonishing number. Since
hydro power is fueled by water, it has the advantage of being only used when needed, because it
is easy to control the storage and allowable flow of water into a hydropower system.
14
Conclusion
Combined Sewer Overflow Power Generation project presents a range of electric power
solutions including serving the function of a receiver and collects the wastewater from the
primary treatment unit, allowing the collected wastewater to get purified to some extent thus
allowing non-harmful water to infiltrate into the ground and lastly helping in the recharge of
groundwater. Since hydro power is fueled by water, it has the advantage of being only used when
needed, because it is easy to control the storage and allowable flow of water into a hydropower
system. Hydro power has an advantage over wind power because water is more dense than air, so
collecting the mechanical energy of wind requires a greater force of wind to rotate the turbine
than it would for water in a hydropower system. I manage to gain a great deal of knowledge and
experience. A number of sophisticated processes in the Knowledge Base educate me how to cope
with various types of situations, as well as how to operate in a difficult circumstance. I also
managed to get more insights on how to handle project majorly in groups. Participating in groups
helped me to gain more courage and work perfectly in a group setting.
15
Acknowledgement
I would like to thank Northumbria water for associate with us. And I also thank my team for
making this project a success.
And special thanks to Dr. MOUSA MARZBAND for guiding us as a academic supervisor.
I my warm thanks to John.Arthur, Anne.m.Macdonald & Andrew.Edden to supporting me a
lot in advanced parities semester.
16
References
Bonnel, W. E., Smith, K. V., & ProQuest (Firm). (2014). Proposal writing for nursing capstones
and clinical projects.
Botturi, A., Daneshgar, S., Cordioli, A., Foglia, A., Eusebi, A. L., &Fatone, F. (2020). An
innovative compact system for advanced treatment of combined sewer overflows (CSOs)
discharged into large lakes: Pilot-scale validation. Journal of Environmental
Management, 256, 109937.
Botturi, A., Ozbayram, E. G., Tondera, K., Gilbert, N. I., Rouault, P., Caradot, N., ...&Fatone, F.
(2021). Combined sewer overflows: A critical review on best practice and innovative
solutions to mitigate impacts on environment and human health. Critical Reviews in
Environmental Science and Technology, 51(15), 1585-1618.
Chen, S., Qin, H. P., Zheng, Y., & Fu, G. (2019). Spatial variations of pollutants from sewer
interception system overflow. Journal of environmental management, 233, 748-756.
Locke, L. F., Spirduso, W. W., & Silverman, S. J. (2013). Proposals that work: A guide for
planning dissertations and grant proposals.
Luis, F. M., M, D. S. G., & Bernardo, L. M. (2017). Case Study of Innovative Projects
Successful Real Cases
New York: Springer Pub. Co. Denscombe, M. (2012). Research proposals: A practical guide.
Rizzo, A., Tondera, K., Pálfy, T. G., Dittmer, U., Meyer, D., Schreiber, C., ...&Masi, F. (2020).
Constructed wetlands for combined sewer overflow treatment: a state-of-the-art
review. Science of the Total Environment, 727, 138618.
Ruppelt, J. P., Tondera, K., Wallace, S. J., Button, M., Pinnekamp, J., & Weber, K. P. (2020).
Assessing the role of microbial communities in the performance of constructed wetlands
used to treat combined sewer overflows. Science of The Total Environment, 736, 139519.
17
Appendices
Appendix.1 Code of Conduct
Social Expectations
As a team we should respect each other and should respect one when they express something and
not interrupt them in between their speech.
Communication
Encourage to work co-operatively and discuss the requirements of further tasks to be completed
further. Summarize meeting and improve skills through effective feedback.
Group Commitment
Being punctual and result oriented. Updating work status and assigning work for further meeting.
Group Cohesion
The members should help each other to solve problems and finish the work on time with
efficiency and provide support to improve their skills.
Values
Maintain a positive attitude and good relationships among teammates. Team members must work
reliably.
Module Title: MSc Advanced Practice
Module Code: KB7056
Author Name : ARATHI REDDY
Id : W20027842
18
Goals
To be result-oriented and transparent in communication. To improve productivity and reach the
goals and requirements on time.
Rules
The team members must be secretive about their project and not reveal any information to others
except the clients and supervisor.
Meeting Comportment
Members must be open to invite the new ideas and must stick to the point (or) agenda of the
meeting.
Decision Making
The group must involve and make decisions together with everyone’s opinion and make sure you
also inform the supervisor about your decision.
Notification
one must update the progress and changes made in the project to notify other team members.
Work
The whole work must be done in unity to achieve the best outcomes.
Details of consequences for non-compliance to the code of conduct
If in case the members are not obeying the rules established they must face the consequences.
Arathi Reddy
( Arathi Reddy)
19
Appendix .2 Project Deliverables
PD-1
P.D-2
20
P.D-3
P.D-4
21
P.D-5
P.D-6
22
P.D-7
P.D-8
23
Appendix.3 Communication plan
Date Time Meeting Agenda Meeting Platform Attendees Meeting Description and Feedback
25-01-2022 1:00-2:00 PM Meeting the team members Campus
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
This was first meeting attended by team
members. Everyone introduced themselves and
discussed the project brief in detail. We divided
the tasks between the members.
28-01-2022 1:00-2:00 PM meeting with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Project brief was discussed with supervisor and
plan to execute the tasks was defined.
01-02-2022 1:00-2:00 PM regular meeting MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Individual presentation of the ideas about
possible solutions to the project.
03-02-2022 9:00-10:00 PM Regular meeting / updates MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Plan to prepare "personal competence form" and
"code of conduct form" was discussed.
04-02-2022 1:00-2:00 PM Preparing PPT for kick-off
meeting Campus
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
In this in-person meeting, presentation for kick-
off meeting was prepared.
07-02-2022 1:00-2:00 PM Regular meeting/Updates on
tasks MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Reviewed individual presentations and will
decide which idea to work on as a group and
some key challenges are discussed to further
proceed with the project
24
08-02-2022 12:15-12:45 PM
Preparing PPT for academic
supervisor meeting and new
team member involvement
MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella, Jaya Krishna
Challagolla
Prepared a short presentation containing the
progress of each team member on assigned tasks.
08-02-2022 1:00-2:00 PM Meeting with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella, Jaya Krishna
Challagolla
Explained the scenario of the project and is key
elements to the new member of the team and
discussed challenges to generate electrical power
through kinetic movement of sewage water and
provided possible solution.
10-02-2022 11:00-12:00 PM Preparation of presentation for
AP-KL7014 Class MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared a short presentation containing the
progress of each team member on assigned tasks
for previous weeks.
11-02-2022 11:00-12:00 PM Preparation for kick-off meeting MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Made few changes in the kick-off meeting and all
members rehearsed their parts of this
presentation.
15-02-2022 1:20-2:00PM Final preparation for kick-off
meeting MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Presented Final client kick off ppt with required
questions to ask the client.
17-02-2022 12:30-4:30 PM Kick-off meeting with client
(NWL) On-site
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Visited NWL site for our first meeting with the
client. We had brief tour of their site. Delivered
oralexplanation to the client and showed them
our understanding of project brief.
25
18-02-2022 11:00-12:00 PM Preparing PPT for academic
supervisor meeting Campus
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
This regular meeting was arranged to discuss our
progress and prepare a short PPT for our
academic supervisor.
22-02-2022 1:00-2:00 AM Meeting with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Discussed the progress with academic supervisor
and also discussed the outcomes of first kick-off
meeting with client.
24-02-2022 10:00-10:40 AM Review meeting with Dr. John
Arthur Campus
Dr. John Arthur, Arathi
Reddy Balapuram,
Omer Khan, Ranga Sai
Kurella
Progress of the project including client visit,
members participation and teamwork was
discussed with Dr. John Arthur. We were asked
to prepare project plan and Gantt chart in this
meeting.
24-02-2022 10:40-3:00 PM Preparing Project Plan and
Gantt Chart Campus
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared a project plan including all the aims,
objectives, and deliverable of this project. A
basic version of Gannt chart was also prepared.
25-02-2022 11:00-12:00 PM Producing final version of Gantt
Chart MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared the final version of Gannt Chart
including all the tasks dates and dependencies.
01-03-2022 1:00-2:00 PM meeting with academic
supervisor MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Discussed the progress on the tasks where we
were struggling.
04-03-2022 1:20-2:00PM Face to face meeting Campus
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Presented our reference paper ideas so implement
new technology to make the plant improve its
efficiency.
26
08-03-2022 1:00-2:00 PM Regular meeting MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Discussed the progress on assigned tasks for each
member and tried to work out the solutions.
11-03-2022 3:30-4:30 PM Preparation of mid-term review
presentation MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared mid-term review presentation.
15-03-2022 1:00-2:00AM Preparation of mid-term review
presentation with voice over MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared a presentation with the voice over of
each member for different sections of PPT.
31-03-2022 3:00-3:40 PM Mid-term review meeting with
Dr. John Arthur Campus
Dr. John Arthur, Arathi
Reddy Balapuram,
Omer Khan, Ranga Sai
Kurella
Our progress was reviewed by Dr. John Arthur.
Our mid-term presentation was also reviewed by
him, and we received the feedback to improvise
the presentation.
05-04-2022 1:00-2:15 PM Preparation of communication
plan MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared a complete communication plan for the
project from project start time to project closure.
08-04-2022 1:00-2:00 PM Preparation of risk assessment MS Teams
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepared a risk assessment form by listing down
all the possible risks involved in this project with
their possible solutions.
15-04-2022 1:00-2:00 PM meeting with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Progress of the project for each member’s task
has been discussed in a brief presentation form
and received feedback from supervisor to
improve the work of every team member.
27
19-04-2022 1:00-2:00 PM Preparation of final review
presentation MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Final presentation for the client will be prepared
containing all the progress, accomplishment, and
deliverables of this project.
22-04-2022 3:00-3:40 PM Final review meeting with Dr.
John Arthur Campus
Dr. John Arthur, Arathi
Reddy Balapuram,
Omer Khan, Ranga Sai
Kurella
In this last meeting with Dr. John Arthur,final
review of our progress and accomplishments will
be done. Final presentation for the client will also
be reviewed and feedback will be used to
improve this PPT.
22-04-2022 1:00-2:00 PM meeting with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Each member's progress on the project will be
presented and discussed with the academic
supervisor. The next step will be based on the
feedback and recommendations received.
29-04-2022 1:00-3:00 PM Preparation of final PPT for AP
KL-7014 Campus
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
Prepare a final presentation for AP-KL7014
containing all the work and objectives achieved
in this project.
03-05-2022 1:00-2:00PM Fina review with academic
supervisor MS Teams
Dr. Mousa Marzband,
Arathi Reddy
Balapuram, Omer
Khan, Ranga Sai
Kurella
A proper check with supervisor’s advice to meet
the requirement as per Dr. John Arthur.
28
Appendix.4 Gantt chart
29
Appendix.5 Risk Assessment
Risk Description Possibility Actions to Minimize Risk
1 PROJECT COMPREHENSION
1.1 Blankness in brief Aims and objectives of project are not clear
and there is lack of clarity in the concept. Moderate
Have a proper understanding in brief if there is any
confusion make sure you contact the supervisor for clarity.
1.2 Conceptual description As the project begins, we have tons of ideas
to implement. Likely
Understanding the key concept and take actions before time
to avoid any effect on the scope of the project.
1.3 No proper time
management
Failure to finish assigned tasks on time as
this will affect the whole team. Moderate
Plan the structure and make a Gantt chart to have a proper
organisation of work with the list of deliverables along with
the dates to plan the project.
1.4 Unrecognized factors
Most of the elements are not defined at
initial stages and does not cover all the
activities of the project. Unlikely
Fractionate each task of the project in sub-tasks and make a
list of all these tasks.
2 TEAM MANAGEMENT
2.1 Submissions after
deadlines
According to the schedule, the tasks are not
completed at estimated time in the project
plan. Moderate
Make sure to manage it among the team and update the
progress with each other of the given tasks and is ready for
submission in time.
2.2 Failure to follow
instructions
The team members do not follow
instructions for the work submission and
communication. Likely
Following the given guidelines for producing work/tasks,
work files submissions, communication, and meetings.
Make sure to strictly follow the given guidelines for each
and every task during the project.
2.3 Failure to follow
methodology
Not following the defined/correct methods and approaches for completing the given
tasks in the project. Likely
Stick to the project plan and objectives; follow the defined methods for completing each task during the project.
30
2.4 Management issues Planning, lack of communication,
distribution in tasks. Likely
Team needs to plan the tasks as a group communication is
really important to meet the deadlines for deliverables and
track the progress of work on each stage.
3 TEAM COMMUNICATION
3.1 Communication Failure to have a proper chat with team
members, managers, supervisor, and client. Unlikely
Follow the plan according to the Gantt chart at each stage of
the project then work is not affected due to lack of
communication.
3.2 Misunderstand task
requirements
Deficient client communication will result in
lack of confusion. Moderate
Communicating with the client to have a clear
understanding of project's outcomes, study the requirements
from the starting of the project, analyse and discuss with
academic supervisor.
3.3 No update in progress
Not completing the work on given time and
not following the guidelines given by the
university/client. Moderate
Each team member should complete the given tasks on time
and update the other team members on this so that each
member of the team is aware of the progress of the tasks.
3.4 Failed in communicate
with the client
Failure to communicate with the client
results in insufficient data for measurement
and design of the proposed solution. Moderate
Write down all the data, requirements, results, and queries
in prior to the meeting with the client so that team have
everything to discuss with the client. In case of delayed
response from the client, discuss these queries with
academic supervisor and make suitable assumptions in
terms of project's requirements.
3.5
Failure in
communication with
management
Failure to communicate with the project
team and missing important submission
guidelines, meetings, and key information. Moderate
Constant follow up with the management team through
emails, MS Teams, and face to face meetings to make sure
everything is on track.
4 CLIENT MANAGEMENT
31
4.1
Inadequate
communication with the
client
Inadequate communication with the clients
will lead to the loss of important information
for the project. Likely
Make presentations to showcase your ideas in the meetings
with the client and ask queries to grab information required
for the project execution. Request AP management team to
get the answers from the client for the important queries
regarding the project
4.2 Sudden changes in
deliverables
Unexpected change of deliverables during
project can lead to failure of deliverables in
proper manner. Unlikely
Understand and communicate the need behind the change, document the change, evaluate the change, and understand
the impact in scope and schedule. Consider the implications
and get any change approved, implement, and communicate
to the team.
5 TEAM AND RESOURCES
5.1 Health issues of team
member
Sudden illness of any member might disrupt
the team's work schedule and have an impact on the team.
Likely
To avoid the impact of team member not available due to
illness, create a share folder on MS Teams to share the update on tasks.
5.2 Irresponsible team
member
A group member's lack of dedication will
result in the project not being completed on
time, as well as disrespect for the efforts of
other team members.
Likely
Members must be committed to the work they are assigned
and complete the tasks before the deadlines. If there are any
delays or change in circumstances, they should inform
others as soon as possible.
5.3 Inadequate skill
A team member's lack of knowledge of
software and tools will have an impact on the project's goal and timelines.
Moderate Team members need to get knowledge and skills if they use
any software or application for the project.
6 Technical
6.1 Incorrect estimations
for system design
In the event of an incorrect load calculation,
the proposed system's design would be inappropriate.
Likely
Proper study and research are needed in required field.
Moreover, discuss these estimations with the academic
supervisor before making any assumptions in the design of the system.
6.2
Inaccurate
estimations from
programs
Using incorrect estimations design produces
inaccurate results. Moderate
Discuss the estimations and solutions of the simulation with
academic supervisor to avoid incorrect results in design of
the system.
6.3 No feasible design If the suggested system will become unstable
and break down. Unlikely
Proper research for the proposed systems is important to make the system feasible.
32
Appendix.6 Project Engagement
Project Engagement
33
Appendix.7 SWOT Analysis of our project
Positives Negatives
Internal
External