Rise of arch, r (m) 0.1 Total mass (gm) Total mass of hangers (gm) Uniform distributed load (N/m) Measured thrust force (N) Calculated thrust force (N) % Error
Length of arch, L (m) 0.5 540 110 4.8
1080 130 8.1
Table 2
Added mass 100 gm 500 gm
Hanger mass 10 gm 10 gm
Total mass 110 gm 510gm Hb = (5*P*x) / (8 * r * L^3) * (L^3 + x^3 - 2 * L * x^2) part A
Total weight (N) 1079.1 5003.1 Hb = (w * L^2) / (8 * r) part B
Table 3
Load Location x (mm) Measured thrust force for 100 gm load (N) Measured thrust force for 500 gm load (N)
0 0 0
50 0.3 1.7
100 0.6 3
150 1 4
200 0.9 5.5
250 1 5.3
300 0.9 5.5
350 0.9 5.1
400 0.6 3.5
450 0.3 1.7
500 0 0