$63 fixed project work
Unit Name/Code ISY3002/ISY302 IS Project 1
|
|
Assessment Number |
3 |
|
|
|
|
|
|
|
|
|
|
Assessment Name |
Software Design Document (SDD) – Individual |
|
|
|
|
|
|
|
|
|
|
Unit Learning Outcomes |
4. Demonstrate skills in project |
Graduate Attributes Assessed |
|
|
|
|
|
Communications |
|
|
|
Assessed |
planning and management, problem |
Collaborations |
|
|
|
|
solving, analysis, and evaluation. |
Research |
|
|
|
|
|
|
|
|
|
|
|
Critical thinking & problem solving |
|
|
|
|
|
Ethical behaviour |
|
|
|
|
|
Flexibility |
|
|
|
|
5. Demonstrate skills in software |
Graduate Attributes Assessed |
|
|
|
|
design, development, |
Communications |
|
|
|
|
implementation, |
Collaborations |
|
|
|
|
testing, and documentation of an |
Research |
|
|
|
|
authentic industry type project, that |
Critical thinking & problem |
|
|
|
|
is, a less well-structured or messy |
solving Ethical behaviour |
|
|
|
|
problem, requiring demonstration |
Flexibility |
|
|
|
|
of high-level skills. |
|
|
|
|
|
|
|
|
|
|
Due Date and Time |
Week 12, Friday 18.10.2019 by 5 PM AEST |
|
|
|
|
|
|
|
|
|
|
Weighting |
30% |
|
|
|
|
|
|
||
|
|
Assessment Description A 3500-word or equivalent effort report on Software Design based on your |
|
||
|
|
|
client’s project details. Refer to the document titled “AIH - Project Details |
|
|
|
|
|
ISY3002 2019T2.pdf” for the project specifications. This report should be in |
|
|
|
|
|
MS Word format. Software Design Documents typically contain several types |
|
|
|
|
|
of UML/other diagrams and tables. If you are using other tools to generate the |
|
|
|
|
|
diagrams paste the generated images on to the Word document. |
|
|
|
|
|
|
|
|
|
|
Detailed Submission |
Upload the document via Moodle/Turnitin. |
|
|
|
|
Requirements |
Follow the instructions as required by this assessment brief. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 | P a g e
INSTRUCTIONS
This is an individual activity. You will participate in weekly tutorial/workshop activities to complete most of the contents required in the report.
NATURE OF THE TASK
This is an individual assessment.
MATERIALS REQUIRED / SUGGESTED RESOURCES
Refer to the document titled “AIH - Project Details ISY3002 2019T2.pdf” for your project specifications. You will need to use many tools to create the report. The tools required could be GitHub, Balsamiq, MS Access, UML diagramming editors such as LucidChart or Visio.
HOW TO PRESENT YOUR ASSIGNMENT / SUBMISSION INSTRUCTIONS
Your report should follow the structure specified in the table of contents in Section 2.3.2 in “AIH - Project Details ISY3002 2019T2.pdf”. You will submit the work via Moodle/Turnitin.
RETENTION OF RECORDS
Students are required to keep a copy of all items submitted or completed for assessment or evaluation until the end of the grade appeal period.
INFORMATION ABOUT HOW AND WHEN FEEDBACK WILL BE PROVIDED
Since this is the last assessment in the unit, the results of the assessment will be available based on AIH policies that guide the outcome of a unit.
MARKING CRITERIA
See the rubric in the next page.
BRIEF 2 | P a g e
ASSESSMENT RUBRIC - TASK BASED
|
|
Section Requirements |
|
Total |
|
Highly |
|
Fairly Competent |
|
Competent |
|
Needs improvement |
|
Work needs review |
|
|
|
|
|
|
|
Competent |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Overview:
1. Introduction to the topic
2. Introduction to the structure of the document
3. Introduction to the deliverables
4. Follows structure specified in the introduction
5. Grammar & logical flow
|
|
Completes |
ALL Completely fulfils |
Partially fulfils |
Completes any |
Has not completed |
|
|
|
FIVE criteria |
FOUR out of FIVE |
|
THREE |
any THREE out of |
|
|
|
|
|
|
|
|
|
|
10% CORRECTLY |
criteria CORRECTLY |
ALL FIVE criteria |
out of FIVE criteria |
FIVE requirements |
|
|
|
|
|
|
|
|
|
|
|
10 |
8 |
6 |
4 |
0 |
|
|
|
Software Design Specifications |
|
Completes |
ALL |
Completely fulfils |
|
Completes any |
Has not completed |
|
|||||||
|
|
1. |
|
Business component design (why, what, when, how) |
|
|
|
|
Partially fulfils |
|
|
|
|||||
|
|
|
|
|
|
FIVE criteria |
|
|
|
FOUR out of FIVE |
|
THREE |
any THREE out of |
|
|||
|
|
2. |
|
Front-end design based on user roles |
20% |
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
CORRECTLY |
|
|
|
criteria CORRECTLY |
ALL FIVE criteria |
out of FIVE criteria |
FIVE requirements |
|
|||
|
|
3. |
|
Workflow & Process design |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. |
|
Security and control design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
20 |
|
|
|
16 |
|
|
12 |
8 |
0 |
|
|
|
|
5. |
|
Database design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Management |
|
|
Completes |
ALL |
Completely fulfils |
Partially/ |
|
Has not completed |
|
||||||
|
|
1. |
|
Traceability matrix from SRS indices to SDD |
|
|
|
|
Inaccurately |
Completes any two |
|
|
|||||
|
|
|
|
|
|
three criteria |
|
|
|
TWO out of THREE |
|
|
any two out of three |
|
|||
|
|
|
|
components |
|
10% |
|
|
|
|
|
fulfils ALL three |
out of three criteria |
|
|
||
|
|
|
|
|
|
|
CORRECTLY |
|
|
|
criteria CORRECTLY |
|
|
criteria |
|
||
|
|
2. |
|
Following risk management plan in A2 |
|
|
|
|
|
|
criteria |
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
|
Monitoring & Control mechanisms |
|
10 |
|
|
|
8 |
|
|
6 |
4 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
|
TOTAL MARK |
/40 |
Overall comments: |
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BRIEF 3 | P a g e