$60 fixed draft due in 6hrs ..final paper in 12hrs 3000 words

profileblank87
A2ISY.doc

image2.jpg Unit Name/Code ISY3002/ISY302 IS Project 1

image1.png

Assessment Number

2

Assessment Name

Project Management Plan (PMP) & Software Requirement Specification (SRS)

Report – Individual

2. Demonstrate an understanding

Graduate Attributes Assessed

Communications

of the roles and responsibilities of

Unit Learning Outcomes

Critical thinking & problem solving

software developers, clients and

Ethical behaviour

Assessed

users of a system.

Flexibility

3.Conduct a feasibility study that

Communications

outlines costs, timeframes, a

Collaborations

development schedule, and the

Research

features and benefits of a

Critical thinking & problem solving

Ethical behaviour

prospective software solution.

Flexibility

4. Demonstrate skills in project

Communications

planning and management,

Collaborations

problem solving, analysis, and

Research

evaluation.

Critical thinking & problem solving

Ethical behaviour

Flexibility

Due Date and Time

Week 7, 13.09.2019 by 5 PM AEST

Weighting

40%

Assessment Description

A 3000-word or equivalent effort report on PMP and SRS based on your

client’s project details. Refer to the document titled “AIH - Project Details

ISY3002 2019T2.pdf” for the project specifications. This report should be in

MS Word format. SRS documents typically contain several types of UML/other

diagrams and tables. If you are using other tools to generate the diagrams

paste the generated images on to the Word document.

Note that the report is not an essay and should not be text heavy.

Detailed Submission

Upload the document via Moodle/Turnitin.

Requirements

Follow the instructions as required by this assessment brief.

ISY302 - IS PROJECT 1, T2 2019 A2 ASSESSMENT BRIEF William Infante

1 | P a g e

INSTRUCTIONS

This is an individual activity. You will participate in weekly tutorial/workshop activities to complete most of the contents required in the report.

NATURE OF THE TASK

This is an individual assessment.

MATERIALS REQUIRED / SUGGESTED RESOURCES

Refer to the document titled Project Details.pdf” for your project specifications. You will need to use many tools to create the report. The tools required could be GitHub, Balsamiq, UML diagramming editors such as LucidChart or Visio.

HOW TO PRESENT YOUR ASSIGNMENT / SUBMISSION INSTRUCTIONS

Your report should follow the structure specified in Section 2.3.1 Project Details.pdf”. You will submit the work via Turnitin.

RETENTION OF RECORDS

Students are required to keep a copy of all items submitted or completed for assessment or evaluation until the end of the grade appeal period.

INFORMATION ABOUT HOW AND WHEN FEEDBACK WILL BE PROVIDED

Your results of the assessment will be available within 1 week of the submission of the report. Feedback will be in the form of comments on the document along with the marks awarded following the marking criteria.

MARKING CRITERIA

See the rubric in the next page.

ISY302 - IS PROJECT 1, T2 2019 A2 ASSESSMENT BRIEF William Infante

2 | P a g e

ASSESSMENT RUBRIC - TASK BASED

Section Requirements

Total

Highly

Fairly Competent

Competent

Needs improvement

Work needs review

Competent

Overview:

1.

Introduction to the topic

CompletesALL

Completely fulfils

Partially fulfils

Completes any

Has not completed

FIVE criteria

FOUR out of FIVE

THREE

any THREE out of

2.

Introduction to the structure of the document

ALL FIVE

10% CORRECTLY

criteria CORRECTLY

out of FIVE criteria

FIVE requirements

3.

Introduction to the deliverables

criteria

4. Follows structure specified in the introduction

5.

Grammar & logical flow

10

8

6

4

0

Requirements Engineering

CompletesALL

Completely fulfils

Completes any

Has not completed

1.

Identification of various actors

Partially fulfils

FIVE criteria

FOUR out of FIVE

THREE

any THREE out of

2.

Identification of external entities, boundaries and

CORRECTLY

criteria CORRECTLY

ALL FIVE criteria

out of FIVE criteria

FIVE requirements

interfaces

20%

3.

Identification of core business requirements

20

16

12

8

0

4.

Identification of security requirements

5. Front end prototypes for requirements gathering

Project Management

CompletesALL

Completely fulfils

Partially/

Has not completed

1.

Assumptions, dependencies & concerns

Inaccurately

Completes any two

three criteria

TWO out of THREE

any two out of three

2.

Risk management plan

10%

fulfils ALL three

out of three

criteria

CORRECTLY

criteria CORRECTLY

criteria

3.

Monitoring & Control mechanisms

criteria

10

8

6

4

0

TOTAL MARK

/40

Overall comments:

ISY302 - IS PROJECT 1, T2 2019 A2 ASSESSMENT BRIEF

William Infante

3 | P a g e