3.8 Conduct a brainstorming exercise to develop 10 operational features and 5 quality attributes for an HCU.
3.9. I dentify three kinds of stakeholders for a Home Control Unit and briefl y describe how they would interact with, or be affected by, individual HCUs and introduction of HCUs into the local community.
3.10. State fi ve operational requirements for an HCU that would always be design goals; that is to say, it is not likely they could be, or would be, converted into technical specifi cations.
4.2. What risk factors are created if a project does not have a written project plan?
4.4. Briefl y describe the ways in which each of the following provides a basis for project planning:
a. operational requirements
b. software specifi cations
c. process constraints
d. product constraints
4.6 W hy is planning for overtime effort an unacceptable option in a project plan?