Assignment 3
IT 509 Information Systems Analysis and Design
Assignment #1
Prepare a list to show all tasks and their duration and then develop
Q1: Work breakdown structure (WBS)
Q2: Gantt Chart (Must reflect the WBS)
Q3: PERT chart that shows the project (Must have the slack time)
Q4: Show the critical Path
Additional Instructions:
• You should add one day Slack time for the preparing and delivery of the printing the copies of the handout materials.
• Make sure you have your name is written on each diagram.
• Once you have done with all sections, place them in MS Word document and then submit