Control of quality system
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
Donald Wheeler stated in his second article "Transforming the Data Can Be Fatal to Your Analysis,"
"out of respect for those who are interested in learning how to better analyze data, I feel the need to
further explain why the transformation of data can be fatal to your analysis."
My motivation for writing this article is not only improved data analysis but formulating analyses so
that a more significant business performance reporting question is also addressed within the
assessment; i.e., a paradigm shift from the objectives of the traditional four-step Shewhart system,
which Wheeler referenced in his article.
The described statistical business performance charting methodology can, for example, reduce
firefighting when the approach replaces organizational goal-setting red-yellow-green scorecards,
which often have no structured plan for making improvements. This article will show, using real
data, why an appropriate data transformation can be essential to determine the best action or non-
action to take when applying this overall system in both manufacturing and transactional processes.
Should Traditional Control Charting Procedures be Enhanced?
I appreciate the work of the many statistical-analysis icons. For example, more than 70 years ago
Walter Shewhart introduced statistical control charting. W. Edwards Deming extended this work to
the business system with his profound knowledge philosophy and introduced the terminology
common and special cause variability. I also respect and appreciate the work that Wheeler has done
over the years. For example, his book Understanding Variation has provided insight to many.
However, Wheeler and I have a difference of opinion about the need to transform data when a
transformation makes physical sense. The reason for writing this article is to provide additional
information on the reasoning for my position. I hope that this supplemental explanation will provide
readers with enough insight so that they can make the best logical decision relative to considering
data transformations or not.
In his last article, Wheeler commented: "However, rather than offering a critique of the points raised
in my original article, he [Breyfogle] chose to ignore the arguments against transforming the data
and to simply repeat his mantra of ‘transform, transform, transform.' "
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
In fact, I had agreed with Wheeler’s stated position that, "If a transformation makes sense both in
terms of the original data and the objectives of the analysis, then it will be okay to use that
transformation."
What I did take issue with was his statement: "… Therefore, we do not have to pre-qualify our data
before we place them on a process behavior chart. We do not need to check the data for normality,
nor do we need to define a reference distribution prior to computing limits. Anyone who tells you
anything to the contrary is simply trying to complicate your life unnecessarily."
In my article, I stated "I too do not want to complicate people’s lives unnecessarily; however, it is
important that someone’s over-simplification does not cause inappropriate behavior."
Wheeler kept criticizing my random data set parameter selection and the fact that I did not use real
data. However, Wheeler failed to comment on the additional points I made relative to addressing a
fundamental issue that was lacking in his original article, one that goes beyond the transformation
question. This important issue is the reporting of process performance relative to customer
requirement needs, i.e., a goal or specification limits.
This article will elaborate more on the topic using real data which will lead to the same conclusion as
my previous article: For some processes an appropriate transformation is a very important step in
leading to the most suitable action or non-action. In addition, this article will describe how this
metric reporting system can create performance statements, offering a prediction statement of how
the process is performing relative to customer needs. It is important to reiterate that appropriate
transformation selection, when necessary, needs to be part of this overall system.
In his second article, Wheeler quoted analysis steps from Shewhart’s Economic Control of Quality of
Manufactured Product. These steps, which were initiated over seven decades ago, focus on an
approach to identify out-of-control conditions. However, the step sequence did not address whether
the process output was capable of achieving a desired performance output level, i.e., expected
process non-conformance rate from a stable process.
Wheeler referenced a study "… encompassing more than 1,100 probability models where 97.3
percent of these models had better than 97.5-percent coverage at three-sigma limits." From this
statement, we could infer that Wheeler believes that industry should be satisfied with a greater than
2-percent false-signal rate. For processes that do not follow a normal distribution, this could
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
translate into huge business costs and equipment downtime searching for special-cause conditions
that are in fact common-cause. After an organization chases phantom special-cause-occurrences over
some period of time, it is not surprising that they would abandon control charting all together.
Wheeler also points out how traditional control charting has been around for more than 70 years and
how the limits have been thoroughly proven. I don't disagree with the three sampling standard
deviation limits; however, how often is control charting really used throughout businesses? In the
1980s, there was a proliferation of control charts; however, look at us now. Has the usage of these
charts continued and, if they are used, are they really applied with the intent originally envisioned by
Shewhart? I suggest there is not the widespread usage of control charts that quality-tools training
classes would lead students to believe. But why is there not more frequent usage of control charts in
both manufacturing and transactional processes?
To address this underutilization, I am suggesting that while the four-step Shewhart methodology has
its applicability, we now need to revisit how these concepts can better be used to address the needs of
today's businesses, not only in manufacturing but transactional processes as well.
To assess this tool-enhancement need, consider that the output of a process (Y) is a function of its
inputs (Xs) and its step sequence, which can be expressed as Y=f(X). The primary purpose of
Wheeler's described Shewhart four-step sequence is to identify when a special cause condition occurs
so that an appropriate action can be immediately taken. This procedure is most applicable to the
tracking of key process input variables (Xs) that are required to maintain a desired output process
response for situations where the process has demonstrated that it provides a satisfactory level of
performance for the customer-driven output, i.e., Y.
However, from a business point of view, we need to go beyond what is currently academically
provided and determine what the enterprise needs most as a whole. One business-management need
is an improved performance reporting system for both manufacturing and transactional processes.
This enhanced reporting system needs to structurally evaluate and report the Y output of a process
for the purpose of leading to the most appropriate action or non-action.
An example application transactional process need for such a charting system is telephone hold time
in a call center. For situations like this, there is a natural boundary: hold time cannot get below zero.
For this type of situation, a log-normal transformation can often be used to describe adequately the
distribution of call-center hold time. Is this distribution a perfect fit? No, but it makes physical sense
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
and is often an adequate representation of what physically happens; that is, a general common-cause
distribution consolidation bounded by zero with a tail of hold times that could get long.
From a business view point, what is desired at a high level is a reporting methodology that describes
what the customer experiences relative to hold time, the Y output for this process. This is an
important business requirement need that goes beyond the four-step Shewhart process.
I will now describe how to address this need through an enhancement to the Shewhart four-step
control charting system. This statistical business performance charting (SBPC) methodology
provides a high-level view of how the process is performing. With SBPC, we are not attempting to
manage the process in real time. With this performance measurement system, we consider
assignable-cause differences between sites, working shifts, hours of the day, and days of the week to
be a source of common-cause input variability to the overall process—in other words, Deming's
responsibility of management variability.
With the SBPC system, we first evaluate the process for stability. This is accomplished using an
individuals chart where there is an infrequent subgrouping time interval so that input variability
occurs between subgroups. For example, if we think that Monday's hold time could be larger than the
other days of the week because of increased demand, we should consider selecting a weekly
subgrouping frequency.
With SBPC, we are not attempting to adjust the number of operators available to respond to phone
calls in real time since the company would have other systems to do that. What SBPC does is assess
how well these process-management systems are addressing the overall needs of its customers and
the business as a whole. The reason for doing this is to determine which of the following actions or
non-actions are most appropriate, as described in Table 1.
Table 1: Statistical Business Performance Charting (SBPC) Action Options 1. Is the process unstable or did something out of the ordinary occur,
which requires action or no action?
2. Is the process stable and meeting internal and external customer needs? If so, no action is required.
3. Is the process stable but does not meet internal and external customer needs? If so, process improvement efforts are needed.
The four-step Shewhart model that Wheeler referenced focuses only on step number one.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
In my previous article, I used randomly generated data to describe the importance of considering a
data transformation when there is a physical reason for such a consideration. I thought that it would
be best to use random data since we knew the answer; however, Wheeler repeatedly criticized me for
selecting a too-skewed distribution and not using real data.
I will now use real data, which will lead to the same conclusion as my previous article.
Real-data Example
A process needs to periodically change from producing one product to producing another. It is
important for the changeover time to be as small as possible since the production line will be idle
during changeover. The example data used in this discussion is a true enterprise view of a business
process. This reports the time to change from one product to another on a process line. It includes
six months of data from 14 process lines that involved three different types of changeouts, all from a
single factory. The factory is consistently managed to rotate through the complete product line as
needed to replenish stock as it is purchased by the customers. The corporate leadership considers
this process to be predictable enough, as it is run today, to manage a relatively small finished goods
inventory. With this process knowledge, what is the optimal method to report the process behavior
with a chart?
Figure 1 is an individuals chart of changeover time. From this control chart, which has no
transformation as Wheeler suggests, nine incidents are noted that should have been investigated in
real time. In addition, one would conclude that this process is not stable or is out of control. But, is
it?
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
Figure 1: Individuals Chart of Changeover Time (Untransformed Data)
One should note that in Figure 1 the lower control limit is a negative number, which makes no
physical sense since changeover time cannot be less than zero.
Wheeler makes the statement, "Whenever we have skewed data there will be a boundary value on
one side that will fall inside the computed three-sigma limits. When this happens, the boundary
value takes precedence over the computed limit and we end up with a one-sided chart." He also says,
"The important fact about nonlinear transformations is not that they reduce the false-alarm rate, but
rather that they obscure the signals of process change."
It seems to me that these statements can be contradictory. Consider that the response that we are
monitoring is time, which has a zero boundary, and where a lower value is better. For many
situations, our lower-control limit will be zero with Wheeler’s guidelines (e.g., Figure 1). Consider
that the purpose of an improvement effort is to reduce changeover time. An improved reduction in
changeover time can be difficult to detect using this “one-sided” control chart, when the lower-
control limit is at the boundary condition—zero in this case.
Wheeler's article makes no mention of what the process customer requirements are or the reporting
of its capability relative to specifications, which is an important aspect of lean Six Sigma programs.
Let's address that point now.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
The current process has engineering evaluating any change that takes longer than twelve hours. This
extra step is expensive and distracts engineering from its core responsibility. The organization's
current reporting system does not address how frequently this engineering intervention occurs.
In his article, Wheeler made no mention of making such a computation for either normal or non-
normal distributed situations. This need occurs frequently in industry when processes are to be
assessed on how they are performing relative to specification requirements.
Let's consider making this estimate from a normal probability plot of the data, as shown in Figure 2.
This estimate would be similar to a practitioner manually calculating the value using a tabular z-
value with a calculated sample mean and standard deviation.
Figure 2: Probability Plot of the Untransformed Data
We note from this plot how the data do not follow a straight line; hence, the normal distribution does
not appear to be a good model for this data set. Because of this lack-of-fit, the percentage-of-time
estimate for exceeding 12 hours is not accurate; i.e., 46% (100-54 = 46).
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
We need to highlight that technically we should not be making an assessment such as this because
the process is not considered to be in control when plotting untransformed data. For some, if not
most, processes that have a long tail, we will probably never appear to have an in-control process, no
matter what improvements are made; however, does that make sense?
The output of a process is a function of its steps and input variables. Doesn’t it seem logical to expect
some level of natural variability from input variables and the execution of process steps? If we agree
to this assumption, shouldn’t we expect a large percentage of process output variability to have a
natural state of fluctuation; i.e., be stable?
To me this statement is true for most transactional and manufacturing processes, with the exception
of things like naturally auto-correlated data situations such as the stock market. However, with
traditional control charting methods, it is often concluded that the process is not stable even when
logic tells us that we should expect stability.
Why is there this disconnection between our belief and what traditional control charts tell us? The
reason is that underlying control-chart-creation assumptions and practices are often not consistent
with what occurs naturally in the real world. One of these practices is not using suitable
transformations when they are needed to improve the description of process performance, for
instance, when a boundary condition exists.
It is important to keep in mind that the reason for process tracking is to determine which actions or
non-actions are most appropriate, as described in Table 1. Let’s now return to our real-data example
analysis.
For this type of bounded situation, often a log-normal distribution will fit the data well, since
changeover time cannot physically go below a lower limit of zero, such as the previously described
call-center situation. With the SBPC approach, we want first to assess process stability. If a process
has a current stable region, we can consider that this process is predictable. Data from the latest
region of stability can be considered a random sample of the future, given that the process will
continue to operate as it has in the recent past's region of stability.
When these continuous data are plotted on an appropriate probability plot coordinate system, a
prediction statement can be made: What percentage of time will the changeover take longer than 12
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
hours? Figure 3 shows a control chart in conjunction with a probability plot. A netting-out of the
process analysis results is described below the graphics: The process is predictable where about 38
percent of the time it takes longer than 12 hours.
Unlike the previous non-transformed analysis, we would now conclude that the process is stable, i.e.,
in control. Unlike the non-transformed analysis, this analysis considers that the skewed tails, which
we expect from this process, to be the result of common-cause process variability and not a source
for special cause investigation. Because of this, we conclude, for this situation, that the
transformation provides an improved process discovery foundation model to build upon, when
compared to a non-transformed analysis approach.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
The process is predictable where about 38% percent of the time it takes
longer than 12 hours.
Figure 3: Report-out.
Let’s now compare the report-outs of both the untransformed (Figure 1) and transformed data
(Figure 3). Consider what actions your organization might take if presented each of these report-outs
separately.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
The Figure 1 report can be attempting to explain common cause events as though each occurrence
has an assignable cause that needs to be addressed. Actions resulting from this line of thinking can
lead to much frustration and unnecessary process-procedural tampering that result in increased
process-response variability, as Deming illustrated in his funnel experiment.
When Figure 3's report-out format is used in our decision making process, we would assess the
options in Table 1 to determine which action is most appropriate. With this data-transformed
analysis, number three in Table 1 would be the most appropriate action, assuming that we consider
the 38 percent frequency of occurrence estimate above 12 hours excessive.
Wheeler stated, "If you are interested in looking for assignable causes you need to use the process
behavior chart (control chart) in real time. In a retrospective use of the chart you are unlikely to ever
look for any assignable causes …"
This statement is contrary to what is taught and applied in the analyze phase of lean Six Sigma’s
define-measure-analyze-improve-control (DMAIC) process improvement project execution
roadmap. Within the DMAIC analyze phase, the practitioner evaluates historical data statistically for
the purpose of gaining insight into what might be done to improve his process improvement project’s
process.
It can often be very difficult to determine assignable causes with a real-time-search-for-signals
approach that Wheeler suggests, especially when the false signal rate can be amplified in situations
where an appropriate transformation was not made. Also, with this approach, we often do not have
enough data to test that the hypothesis of a particular assignable cause is true; hence, we might think
that we have identified an assignable cause from a signal, but this could have been a chance
occurrence that did not, in fact, negatively impact our process. In addition, when we consider how
organizations can have thousands of processes, the amount of resources to support this search-for-
signal effort can be huge.
Deming in Out of the Crisis stated, "I should estimate that in my experience most troubles and most
possibilities for improvement add up to proportions something like this: 94 percent belong to the
system (responsibility of management), 6 percent [are] special."
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
With a search-for-signal strategy it seems as if we are trying to resolve the 6 percent of issues that
Deming estimates. It would seem to me that it would be better to focus our efforts on how we can
better address the 94 percent common-cause issues that Deming describes.
To address this matter from a different point of view, consider extending a classical assignable cause
investigation from special cause occurrences to determining what needs to be done to improve a
process’ common-cause variability response if the process does not meet the needs of the customer
or the business.
I have found with the SBPC reporting approach that assignable causes that negatively impact process
performance from a common-cause point of view can best be determined by collecting data over
some period of time to test hypotheses that assess differences between such factors as machines,
operators, day of the week, raw material lots, and so forth. When undergoing process improvement
efforts, the team can use collected data within the most recent region of stability to test out compiled
hypothesis statements that it thinks could affect the process output level. These analyses can provide
guiding light insight to process-improvement opportunities. This is a more efficient analytical
discovery approach than a search-for-signals strategy where the customer needs are not defined or
addressed relative to current process performance.
For the example SBPC plot in Figure 3, the team discovered through hypotheses tests that there was
a significant difference in the output as a function of the type of change, the shift that made the
change, and the number of performed tests made during the change.
This type of information helps the team determine where to focus its efforts in determining what
should be done differently to improve the process. Improvement to the system would be
demonstrated by a statistically significant shift of the SPBC report-out to a new-improved level of
stability. This system of analysis and discovery would apply for both processes that need data
transformation and those that don't, that is, the SPBC system highlights and does not obscure the
signals of process change.
Detection of an Enterprise Process Change
Wheeler stated, "However, in practice, it is not the false-alarm rate that we are concerned with, but
rather the ability to detect signals of process changes. And that is why I used real data in my article.
There we saw that a nonlinear transformation may make the histogram look more bell-shaped, but in
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
addition to distorting the original data, it also tends to hide all of the signals contained within those
data."
Let's now examine how well a shift can be detected with our real-data example, using both non-
transformed and transformed data control charts. A traditional test for a process control chart is the
average run length until an out-of-control indication is detected, typically for a one standard
deviation shift in the mean. This does not translate well to cycle-time-based data where there are
already values near the natural limit of zero. For our analysis, we will assume a 30-percent reduction
in the average cycle time to be somewhat analogous to a shift of one standard deviation in the mean
of a normally distributed process.
In our sample data, there were 590 changeovers in the six-month period. The 30-percent reduction
in cycle time was introduced after point 300. A comparison of the transformed and untransformed
process behavior charting provides a clear example of the benefits of the transformation, noting that,
for the non-transformed report-out, a lower control limit of zero, per Wheeler's suggestion, was
included as a lower bound reference line.
In Figure 4a, the two charts show the untransformed data analysis, the upper chart appearing to
have become stable after the simulated process change. When a staging has been created (lower
chart in Figure 4a), the new chart stage identifies four special cause incidents that were considered
common-cause events in the transformed data set, as shown in the lower chart in Figure 4b.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
Figure 4a: Non-transformed Analysis of a Process Shift
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
Figure 4b: Transformed Analysis of a Process Shift
The two transformed charts in Figure 4b show a change in the process with the introduction of the
special-cause indications after the simulated change was implemented.
When staging is introduced into this charting, the special-cause indications are eliminated; i.e., the
process is considered stable after the change.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
Using Wheeler’s guidelines, a simple reduction in process cycle time would appear to be the removal
of special causes. This is fine in the short term, but as we collect more data on the new process and
introduce staging into the data charting we would surely, for skewed process performance, return to
a situation were special-cause signals would reoccur, as shown in the lower chart in Figure 4a. We
should highlight that these special cause events appear as common-cause variability in the
transformed-data-set analysis shown in the lower chart in Figure 4b.
If you follow a guideline of examining a behavioral chart that has an appropriate transformation, you
would have noted a special cause occurring when the simulated process change was interjected.
From this analysis, the success of the process improvement effort would have been recognized and
the process behavior chart limits would be re-set to new limits that reflect the new process response
level.
Since the transformed data set process is stable, we can report-out a best estimate for how the
process is performing relative to the 12 hour cycle time criteria. In Figure 5, the SBPC description
provides an estimate of how the process performed before and after the change, where 100-63 = 37%
and 100-87 = 13%. Since the process has a recent region of stability, the data from this recent region
can provide a predictive estimate of future performance unless something changes within the process
and/or its inputs; i.e., our estimate is that 13 percent of the cycle times will be above 12 hours.
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
The process has been predictable since observation 300 where now about
13% of the time it takes longer than 12 hours for a changeover. This 13%
value is a reduction from about 37% before the new process change was
made.
Figure 5: SBPC Report-out Describing Impact of Process Change.
I wonder if much of the dissatisfaction and lack of use of business control charting derive from the
use of non-transformed data. Immediately after the change, the process looks to be good, and the
improvement effort is recognized as a success. However, in a few weeks or months after the control
chart has been staged, the process will show to be out of control again because the original data is no
longer the primary driver for the control limits. The organization will assume the problem has
returned and possibly consider the earlier effort to now be a failure.
In addition, Wheeler’s four-step Shewhart process made no mention of how to assess how well a
process is performing relative to customer needs, a very important aspect in the real business world.
Conclusions
The purpose of traditional individuals charting is to identify in a timely fashion when special-cause
conditions occur so that corrective actions can be taken. The application of this technique is most
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
beneficial when tracking the inputs to a process that has an output level which is capable of meeting
customer needs.
False signals can occur if the process measurement by nature is not normally distributed, for
example, in processes that cannot be below zero. Investigation into these false signals can be
expensive and lead to much frustration when no reason is found for out-of-control conditions.
The Wheeler suggested four-step Shewhart process has its application; however, a more pressing
issue for businesses is in the area of high-level predictive performance measurements. SBPC
provides an enhanced control charting system that addresses these needs; e.g., an individuals chart
in conjunction with an appropriate probability plot for continuous data. Appropriate data
transformation considerations need to be part of the overall SBPC implementation process.
With SBPC, we are not limited to identifying out-of-control conditions but also are able to report the
capability of the process in regions of stability in terms that everyone can understand. With this form
of reporting, when there is a recent region of stability, we can consider data from this region to be a
random sample of the future. With statistical business performing charting approach, we might be
able to report that our process has been stable for the last 14 weeks with a prediction that 10 percent
of our incoming calls will take longer than a goal of one minute.
I expect that the one real issue behind this entire discussion is the idea of "what is good enough?"
Wheeler shared a belief that a control charting method that allows up to 2.5 percent of process
measures to trigger a cause and corrective action effort that will not find a true cause in a business as
"good enough." Wheeler goes so far as to relate the 95 percent confidence concept from hypothesis
testing to imply that up to 5 percent false special cause detections are acceptable. Using the above-
described concept of transforming process data where the transformation is appropriate for the
process-data type will lead to process behavior charting that matches the sensitivity and false-cause
detection that we have all learned to expect when tracking normally distributed data in a typical
manufacturing environment.
Why would anyone want to have a process behavior chart that will be interpreted differently for each
use in an organization? The answer should be clear: use transformations when they are appropriate
and then your organization can interpret all control charts in the same manner. Why be "good
enough" when you have the ability to be correct?
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]
The "to transform or not transform" issue addressed in this paper led to SBPC reporting and its
advantages over the classical control-charting approach described by Wheeler. However, the
potential for SBPC predictive reporting has much larger implications than reporting a widget
manufacturing process output.
Traditional organizational performance measurement reporting systems have a table of numbers,
stacked bar charts, pie charts, and red-yellow-green goal-based scorecards that provide only
historical data and make no predictive statements. Using this form of metric reporting to run a
business is not unlike driving a car by only looking at the rear view mirror, a dangerous practice.
When predictive SBPC system reporting is used to track interconnected business process map
functions, an alternative forward-looking dashboard performance reporting system becomes
available. With this metric system, organizations can systematically evaluate future expected
performance and make appropriate adjustments if they don't like what they see, not unlike looking
out a car's windshield and turning the steering wheel or applying the brake if they don't like where
they are headed.
How SBPC can be integrated within a business system that analytically/innovatively determines
strategies with the alignment of improvement projects that positively impact the overall business will
be described in a later article.
DISCUSS ( 11 )HIDE COMMENTS
LOGIN TO COMMENT( LOGIN / REGISTER )
ABOUT THE AUTHOR
Forrest Breyfogle—New Paradigms
CEO and president of Smarter Solutions Inc., Forrest W. Breyfogle III is the creator of the integrated
enterprise excellence (IEE) management system, which takes lean Six Sigma and the balanced
scorecard to the next level. A professional engineer, he’s an ASQ fellow who serves on the board of
advisors for the University of Texas Center for Performing Excellence. He received the 2004 Crosby
Medal for his book, Implementing Six Sigma. E-mail him at [email protected]
NOT Transforming the Data Can Be Fatal to Your Analysis
A case study, with real data, describes the need for data transformation.
[Type here]