SAP GUI simple tutorials
Exercise: SAP PP1
ISM 3153
Florida International University
Note that you should upload the result to the Blackboard system. See the instructions inside.
|
|
PP 1: Display Stock/Requirements List |
|
Exercise Use the SAP Easy Access Menu to display the Stock/Requirements List. Time 5 min Task Review the material status of your Deluxe Touring bike (finished good) in the Dallas plant using the Stock/Requirements list. Name (Position) Lars Iseler (Production Order Worker) |
|
|
|
|
|
The Stock/Requirements list contains up-to-date information on the current status of inventory on hand, requirements, and receipts. It is a dynamic list that allows you to view changes made to material status. |
Stock/Requirements List |
|
1. To review the material status, follow the SAP Easy Access menu path: Logistics ► Production ► Production Planning ► Demand Management ► Environment ► Stock/Requirements List The following screen will appear. |
Menu path
|
|
|
|
|
2. First of all, you need to find the material number(s) for your Deluxe Touring bikes. In order to do so, click in the Material field and press F4 (or click on the search icon |
F4 |
|
|
|
|
3. Make sure that you are on the Material by Material Type tab. If not, you can use the |
|
|
4. In the Material Type field, select Finished Product (FERT). In order to display your Deluxe Touring bikes only, you need to define two more search criteria. First, in the Material Description field type Deluxe*. Second, in the Material field (which is the field for the unique material number) type *###. Remember to replace ### with your three-digit number, e.g. *014 if your number is 014. |
Finished Product Deluxe* *### |
|
5. Before pressing Enter or clicking on |
|
|
|
|
|
The result of this search should give you a list of: a) all finished goods, b) which name (short description) starts with Deluxe, c) which material number end with your number (###). |
|
|
|
|
|
6. You should get a list of three different Deluxe Touring bikes – black, red and silver (please note that the material numbers in your screen will be different). Double-click on your red Touring bike which will copy its unique material number (DXTR3###) into the Material field. |
DXTR3### |
|
7. In addition to the material number, in the Plant field select GBI’s manufacturing facility in Dallas (DL00). Then, press Enter or click on |
DL00 |
|
|
|
|
As you can see, GBI has currently no red Deluxe Touring bikes on stock. Repeat the same procedure for the other two deluxe bikes (black and silver). |
|
|
8. Click on |
|
|
|
|
|
|
PP 2: Display Bill of Material |
|
Exercise Use the SAP Easy Access Menu to display a bill of material. Time 5 min Task Review the components of your black Deluxe Touring bike and the components of the Touring Aluminum Wheel Assembly within the finished bike bill of material. Name (Position) Jun Lee (Production Supervisor) |
|
|
|
|
|
A bill of material (BOM) is a list of the components that are needed to create a given product. The list contains the description, the quantity, and unit of measure. The BOM can contain items of different item categories such as stock items, non-stock items, document items, and text items. |
Bill of Material (BOM) |
|
1. To review a bill of material, follow the menu path: Logistics ► Production ► Master Data ► Bills of Material ► Bill of Material ► Material BOM ► Display This will produce the following screen. |
Menu path
|
|
|
|
|
2. The system should have already defaulted in the material number (DXTR1###) and the plant (DL00) from the previous exercise. It also assumes that you would like to display the BOM valid today (note Valid From and Valid to dates). In addition, the system requests the usage of this BOM. Click in the BOM Usage field and use F4 to display possible usage types. Select usage type 1 for plant DL00. Then, press Enter to display the BOM of your black Deluxe Touring bike |
DXTR1### DL00 F4 1 |
|
|
|
|
The assembly indicator (column Asm; see the circled area above) marks the item with components that have their own BOM. In this case, it is the Touring Aluminum Wheel Assembly. |
|
|
3. Double-click on this checkbox (indicator for Wheel Assembly TRWA1###). This will produce the following screen. |
TRWA1### |
|
|
|
|
4. In the Display assembly screen, click on |
|
|
5. Repeat the procedure for your red and the silver Deluxe Touring bike to identify the differences in their bills of materials. You may open another (parallel) session to compare the BOMs in separate screens (use the |
|
|
6. Click on |
|
|
|
|
|
|
PP 3: Display Multi-Level Bill of Materials |
|
Exercise Use the SAP Easy Access Menu to display a multi-level BOM. Time 5 min Task Review the BOM for your black Deluxe Touring bike from a multi-level hierarchy level. Name (Position) Jun Lee (Production Supervisor) |
|
|
|
|
|
1. To display a multi-level BOM, follow the menu path: Logistics ► Production ► Master Data ► Bills of Material ► Reporting ► BOM Explosion ► Material BOM ► Multilevel BOM |
Menu path
|
|
2. In the following screen, enter (or find) Material DXTR1### (replace ### with your number), Plant DL00, and BOM Application PP01 (Production-General). Then, click on |
DXTR1## DL00 PP01 1 |
|
|
|
|
3. Click on |
Variable list |
|
|
|
|
4. After reviewing the components of your Finished Bike, find and select the following item in the system menu: Goto ► Graphic This should produce the following BOM hierarchy graphic. |
|
|
|
|
|
You can use the Zoom in and Zoom out buttons to resize the graphic. |
|
|
5. Click on |
|
|
|
|
|
|
PP 4: Display Routing |
|
Exercise Use the SAP Easy Access Menu to display a routing. Time 10 min Task Review the routing for your black Deluxe Touring bike. Name (Position) Jun Lee (Production Supervisor) |
|
|
|
|
|
A routing is a series of sequential operations carried out to produce an end product. Routings contain information on where work is to be performed, steps that need to be completed, and time lines assigned for each operation. |
Routing |
|
1. To review a routing, follow the menu path: Logistics ► Production ► Master Data ► Routings ► Routings ► Standard Routings ► Display (CA03) |
Menu path |
|
Enter Material DXTR1### and Plant DL00. If group number is populated with some value, please remove that value (i.e., make this blank).
Then, click on |
DXTR1### DL00 |
|
|
|
|
2. Select |
|
|
|
|
|
3. Select This will display the following operation graphic (this example is simple and every operation is sequential. However, a network structure is possible) |
|
|
|
|
|
4. Click on Extras ► Scheduling ► Schedule This should produce the following screen. |
|
|
|
|
|
5. Enter Scheduling type 1 and Lot size 10. Click on |
1 10 000000000001 |
|
6. In order to view the schedule in a Gantt chart, click on Time unit ► Minute Also, display the legend by clicking on |
|
|
|
|
|
7. Click on |
Yes |
|
|
|
|
|
PP 5: Display Routing/BOM in Engineering Workbench |
|
Exercise Use the Engineering Workbench to display a routing and a BOM. Time 10 min Task Review the BOM and routing simultaneously. Name (Position) Jun Lee (Production Supervisor) |
|
|
|
|
|
The Engineering Workbench (EWB) provides an environment where you have the ability to create, change, and delete BOM and routings. More importantly, it gives us the ability to create work lists and work on specific parts of a BOM or routing without locking the entire object. |
Engineering Workbench (EWB) |
|
1. To review BOMs and routings simultaneously, follow the menu path: Logistics ► Production ► Master Data ► Engineering Workbench |
Menu path |
|
2. In the following window, find and select Current Working Area FK (Test Work Area) using the F4 help and click on |
FK |
|
3. In the EWB: Selection Criteria for BOM Headers screen, enter (or find) Material DXTR1### (replace ### with your number) and Plant DL00. Then, click on |
DXTR1### DL00 |
|
4. In the EWB: BOM Headers Overview screen, if the |
PP01 |
|
5. In order to see the icons |
|
|
|
|
|
6. Click on |
|
|
|
|
|
The subtree marked with |
|
|
7. Double-click on operation 0020 (Attach seat to frame) to call up specific information. Here, you could change the routing details for this operation if necessary. |
0020 |
|
8. Click on |
Yes |
|
|
|
|
|
PP 6: Display Work Center |
|
Exercise Use the SAP Easy Access Menu to display a work center. Time 15 min Task Review a work center in GBI’s plant in Dallas. Name (Position) Jun Lee (Production Supervisor) |
|
|
|
|
|
A work center is a location where operations are carried out for an order. Capacities (setup, machine, and labor) are assigned to work centers so that they can be allocated and consumed within an order in a controlled and predictable manner. The work center capacity is created in and assigned to a single work center. |
Work center |
|
1. To review a work center and the capacity assigned to it, follow the menu path: Logistics ► Production ► Master Data ► Work Centers ► Work Center ► Display |
Menu path |
|
2. Enter Plant DL00. In the Work center field, use the F4 help to display all three work centers in Dallas. In the search results, double-click on the DL Assembly work center to select it which should copy its number (ASSY1000). Click on |
DL00 F4 ASSY1000 |
|
3. On the Basic Data tab, find out who is the person responsible. |
|
|
4. On the Default Values tab, click in the Control key field (ASSY) and select F4. On the following screen, single-click on the ASSY. Then, select |
ASSY F4 |
|
|
|
|
5. Select |
|
|
6. On the Scheduling tab, click in the Processing formula field and select |
|
|
7. After selecting |
100 EA 1 2 7 MIN 7 MIN |
|
|
|
|
8. Click on |
|
|
|
|
|
9. Select 10. Capture the screen (schedule tab). |
|
|
On the Costing tab, what Controlling Area and Cost Center are defined?
|
|
|
11. Click on |
|
|
|
|
Please capture this screen (after 9. Select “End Formula Test”). Please upload this image (e.g., image file or Word document) to the blackboard