Labour and Equipment Cost
Dr X Shen©2020
Learning Objectives
How to estimate the costs of labour and equipment?
2
(Courtesy: Minesurveyor)
Dr X Shen©2020
Cost of Labour and Equipment
3
(Courtesy: amsimaging)
Dr X Shen©2020
Cost of Labour
• Straight-time wage, 8 h/day & 5 days/week • Overtime pay, 1.5 to 2 times of wage • Compensation insurance • Social security tax • Unemployment compensation tax • Liability and property damage insurance • Fringe benefits, e.g. apprentice and pension plans, and health and welfare insurance
4
Dr X Shen©2020
Hourly Rate of Labourers
Union Wage – Construction workers who are members of a
labour union – Wage rate established by a labour contract
between their union and the construction contractor’s management
– Union wage rates usually include fringe benefits
5
Dr X Shen©2020
Hourly Rate of Labourers
Open-shop Wage – Construction workers who are not members of
a union – Open-wage agreed to by each individual
employee and the employer
6
Dr X Shen©2020
Hourly Rate of Labourers
Prevailing Wage – Workers who are employed on projects
funded with state or federal money – Wage rate established by the prevailing wage
at the project location – The federal government and many states
have government-established wage for each construction craft for each geographic location
7
Dr X Shen©2020
Example 1 A iron worker works 10 h/day, 6 days a week. A base wage of AUD 20.97/h is paid for all straight-time work, 8 h/day, 5 day/week. An overtime rate of time and one half is paid for all hours over 8 h/day, Monday through Friday and double time for Saturday work. The social security tax is 7.65% and the unemployment tax is 3% of actual wages. The rate for workmen’s compensation insurance is AUD 12.5/100 of base wage, and public liability and property damage insurance rate is AUD 3.25/100 base wage. Fringe benefits are AUD 3.15/h. Calculate the average hourly cost of the iron worker.
8
Dr X Shen©2020
Cost of Equipment
• Construction equipment can be purchased or rented • The equipment is purchased when extensive use is required • The equipment is rented if it is used sparingly
9
Dr X Shen©2020
Cost of Purchasing Equipment
Cost of Owning (Ownership Cost) – Investment on money required to purchase
the equipment – Depreciation of the equipment over its useful
life – Taxes – Insurances – Storage when not in use
10
Dr X Shen©2020
Cost of Purchasing Equipment
Operating Cost – Cost of fuel – Cost of lubricating oil – Cost of maintenance and repair
11
Dr X Shen©2020
Cost of Fuel
• The fuel may be gasoline or diesel • Most machines normally operate for 45 minutes in an hour • The machine is not operated at its full capacity all the time, may only during heavy load conditions
12
Dr X Shen©2020
Cost of Fuel
Fuel consumption under normal temperature and pressure
– Gasoline engine: 0.22 Litre of fuel for each actual power (kW) developed
– Diesel engine: 0.15 Litre of fuel for each power (kW) developed
13
Dr X Shen©2020
Cost of Fuel
Operating factor when an engine works at its full power only for a fraction of operation cycle
– Engine Factor – Time Factor
14
Dr X Shen©2020
Example 2
A shovel is used in a digging operation. Its rated power is 120 kW. During an operating cycle of 20 seconds, the engine is operated at full power while filling the bucket in tough ground, requiring 5 seconds. During the balance of the cycle, the engine is operated at 50% of its rated power and the shovel is operated only for 45 min in an hour. Calculate the diesel required per hour.
15
Dr X Shen©2020
Cost of Lubricating Oil
The quantity of lubricating oil: – Size of the engine – Capacity of the crankcase – Conditions of the pistons – Number of hours between oil changes
16
Dr X Shen©2020
Case Study - Oil Sands Mining in Canada
17
Fort McMurray, Alberta, Canada (Courtesy: bnb.org)
Dr X Shen©2020
Mining Construction Equipment
18
Dr X Shen©2020
Mining Construction Equipment
19
Dr X Shen©2020
Mining Construction Equipment
20
Dr X Shen©2020
Autonomous Haulage in Australia
21
(Courtesy: Komatsu)
Dr X Shen©2020
Learning Objectives
How to estimate the costs of Labour and Equipment?
22
(Courtesy: Minesurveyor)
Dr X Shen©2020
23
Questions?