Order 1278525: fundamental of construction

profiletutorthammy
2eChapter17Cliff.ppt

Trends
Chapter 17

Trends

In the face of a growing population and growing economies, a diverse housing inventory must be increased, transportation systems must be expanded and improved, and manufacturing and commercial facilities must be constructed.

Accelerated Construction

The implementation of complex construction projects involves diverse "skill sets." The skills to maintain safety, obtain a quality project, and achieve project completion milestones are constructability, enhanced construction management methods, contractor design input, and improved construction scheduling.

Innovative Contracting Methods

  • Qualifications-based-procurement,
  • Design-build
  • Best-value procurement
  • In Europe the use of nontraditional contracting and innovative financing techniques.

Construction equipment or automated/preprogrammed machinery (robots) will incorporate advanced guiding, monitoring, and coordinating technologies.

Technologies for Guiding and Monitoring

Motion trace of a tower crane’s hook imposed on a building floor plan view

Technologies for Guiding, Monitoring, and Coordinating

Construction equipment will incorporate advanced guiding, monitoring, and coordinating technologies.

Technologies for Guiding, Monitoring, and Coordinating

Many of these technologies were developed for the purposes of aeronautic navigation.

  • Inertial navigation systems
  • Active beacon navigation systems
  • Radio frequency identification systems.

Maturity Meters

Concrete maturity meters use thermocouples installed in plastic concrete, which automatically record hydration temperatures at given time intervals. With this data it is possible to estimate concrete strength.

Smart Structures

The ultimate dream is to integrate four operating areas into one single computerized system:

Energy efficiency

Life safety systems

Telecommunications systems

Workplace automation

RFID Technology

RFID technology provides the means to wirelessly transfer of information via a tag or transponder and a reader. RFID tags can be attached to almost any object including construction materials or equipment.

Smart Structures

The ultimate dream is to integrate four operating areas into one single computerized system:

Energy efficiency

Life safety systems

Telecommunications systems

Workplace automation

4-D visualization

By using computer graphics, engineers can form

  • Four-dimensional (4-D)

visual simulations of projects, creating a virtual building process on the computer.

4-D visualization

Virtual reality tools allow for better construction project:

  • Planning
  • Management
  • Documentation

Total Electronic Integration

There will be total electronic integration of the entire process of planning, design, and construction, linking together each step of the process in universally accessible electronic files.

Four-D Visualization allows

  • Linking model objects with schedule activities
  • Simulating construction
  • Communicating in a visual environment

Four-D Visualization

Walt Disney Imagineering (WDI) the planning, design, engineering, and project management area of The Walt Disney Company has been working with university researchers to develop a 4-D visualization-scheduling package.

Four-D Visualization

The driver behind effort is the cost of

  • errors and
  • omissions

in project plans.

Over the Wall Deliverables

image1.png

Over the Wall Deliverables

Mostly 2D CAD files

Many constituencies with different nomenclatures & standards

Thousands of sheets & pages

Thousands of paper- based transactions

Over the Wall Deliverables

Highly dependent on people

Difficult if not impossible to share data

No capture of reasoning - the why and how?

Four-D Visualization

Allows concurrent design & engineering

virtual and rapid prototyping

model-based processes in all phases of life cycle

Four-D Visualization

Allows concurrent design & engineering

broadly shared data

constructor input during early project stages

Imagineering Goal

To decrease life cycle cost through

simulation of design and construction.

The Goals

To decrease life cycle cost by:

  • capturing & clarifying the design rationale
  • leveraging data – making date easily available to all

The First 4-D tool

Provided the capability to:

Link model objects with schedule activities

Simulate construction

Communicate in a visual environment

Paradise Pier Project

Demonstrated what if scenarios for the project’s coaster erection.

Communicating with CM

Reduced time float for understanding

Identification of conflicts

Paradise Pier Project

image1.png

Paradise Pier Project

Demonstrated what if scenarios for the project’s coaster erection.

Communicating with GC

Pre- bid visualization

Snapshots of critical milestones

Video of real time sequence

August 21, 2000 simulation

image1.png

Paradise Pier Project

The first prototype 4-D system proved the communicating concepts. The planners were able to successfully examine what if scenarios for coaster erection.

Reality check

There were several issues that were identified during this prototype trial.

  • Level of detail should reflect level

of decision

  • Evolve nomenclature from schedule

for activities relating to elements

  • Animation versus simulation

Lessons Learned

  • Effective visual front- end
  • Validated construction schedule
  • Ran what if scenarios for coaster track erection
  • Demystified project scope to potential bidders
  • Nomenclature is vital to success

Coaster Track Steel Communication

Current methods - describe less than the whole picture, each participant had a different nomenclature for the same item. The system forced the adoption of a comprehensible set of descriptions of all elements and element attributes.

Nomenclature vital to success

Disney Concert Hall project

The goals were to enhance the Architect, Engineer, Constructor, and Owner productivity and to work as a team in developing the 4-D system.

Disney Concert Hall

Disney Concert Hall

Each element of this very complicated, the structure was broken down into a series of models.

Models

  • Surface models that modeled the visible surfaces
  • Surface pattern models of relevant architectural patterns
  • Models of the concrete top, bottom, and edge surfaces
  • Steel 3d Model prepared by detailers for every steel member.

Steel 3D Model

Conflicts

Architectural Concrete too late for curtain wall, - Revise Sequence

Conflicts

Conflicts

Emerging Technologies

Proactive computing

Non-monolith documents

Artificial life schedule optimization

Audit agents

Holographic storage

Nanotechnology

Exskeleton robots

Tacit knowledge extraction

Chapter 17 Homework

Due next class

  • 17.1
  • 17.8
  • 17.10