Project Proposal: WBS & Project Schedule 2

PROJECT PROPOSAL – WBS & PROJECT SCHEDULE

Project Plan

This project involves constracting a library mural within a duration of 12 months. The local neighborhood and community would be involved in the construction of the project. The critical elements of the scope of this project are designing, planning, construction, and finishing phases. However, to ensure the project is implemented as per the schedule, the activities that are in the critical path would be prioritized to prevent unnecessary delays.

Communication Plan

Communication is very important between the parties involved in the implementation of the project because it enhances cordinantion and teamwork. An efficient communication system will be put in place for better sharing of the information among the stakeholders. This will ensure that accurate information shared between the architectural department, office of the project manager, resident engineer, and the construction team at large. Any update concerning the changes in design, schedule, and milestones to be prioritied. All updates would be posted on the company’s website for easy access to information.

Work Breakdown Structure (WBS)

The Work Breakdown Structure (WBS) shows how the project would be implemented. The actual general breakdown structure is below.

Work breakdown structure

Shelves, tables, chairs

Alarms

Flooring

Fix window pans

Fix lights, sockets, switches

Painting

Piping

Wiring

Install doors & windows

Gutters

Iron sheets

Tiers & struts

Roofing

Construct pad footings

Cons. Columns, slabs, & walls

Excavate

Leveling

Assemble team

Site prep.

Assemble resources

Remove veg.

Preparing drawings

Design approval

Design changes

Construction

Finishing

Design

Planning

Design

Erect fense

Hand over

Project Network

Code

Tasks

2

PLANNING

2.1

Assembling resources

2.2

Assembling construction team

3

Site preparation

3.1

Removal of vegetation

3.2

Leveling

3.3

Excavation

3.4

Erecting a protective fense

4

CONSTRUCTION

4.1

Construction of pad footings

4.2

Construction of columns, slabs, and walls

4.3

Roofing

4.3.1

Erection of tiers and struts

4.3. 2

Nailing of iron sheets

4.3.3

Erection of gutters

5

FINISHING

5.1

Installation of doors & windows

5.2

Wiring

5.3

Piping

5.4

Fixing of wires, lights, switches, consumer unit, sockets,

5.5

Paiting

5.6

Installing window panes

5.7

Flooring

5.8

Installation of shelves, tables, & chairs

5.9

Installation of alarm system

6

Hand over the project

Archect Drawings

3.1

2.1

Design Approvals

start

2.2

5.1

5.4

5.2

5.3

5.5

5

4.3.3

4.3.2

4.3.1

3

4.2

4.3

End

5.9

5.8

5.7

5.6

4.1

4

3.3

3.2

3

2

Design

Design Changes

Tasks

Duration (days)

Start

Finish

PLANNING

1/30/20

2/15/20

Assembling resources

2

Assembling construction team

3

Site preparation

3

Removal of vegetation

2

Leveling

2

Excavation

5

Erecting a protective fense

2

CONSTRUCTION

3/1/20

7/15/20

Construction of pad footings

15

Construction of columns, slabs, and walls

50+

Roofing

5

Erection of tiers and struts

2

Nailing of iron sheets

2

Erection of gutters

1

FINISHING

8/3/20

8/15/20

Installation of doors & windows

6

Wiring

5

Piping

4

Fixing of wires, lights, switches, consumer unit, sockets,

5

Paiting

5

Installing window panes

3

Flooring

1

Installation of shelves, tables, & chairs

8

Installation of alarm system

10

Hand over the project

3