Project Proposal: WBS & Project Schedule 2
PROJECT PROPOSAL – WBS & PROJECT SCHEDULE
Project Plan
This project involves constracting a library mural within a duration of 12 months. The local neighborhood and community would be involved in the construction of the project. The critical elements of the scope of this project are designing, planning, construction, and finishing phases. However, to ensure the project is implemented as per the schedule, the activities that are in the critical path would be prioritized to prevent unnecessary delays.
Communication Plan
Communication is very important between the parties involved in the implementation of the project because it enhances cordinantion and teamwork. An efficient communication system will be put in place for better sharing of the information among the stakeholders. This will ensure that accurate information shared between the architectural department, office of the project manager, resident engineer, and the construction team at large. Any update concerning the changes in design, schedule, and milestones to be prioritied. All updates would be posted on the company’s website for easy access to information.
Work Breakdown Structure (WBS)
The Work Breakdown Structure (WBS) shows how the project would be implemented. The actual general breakdown structure is below.
Work breakdown structure
Shelves, tables, chairs
Alarms
Flooring
Fix window pans
Fix lights, sockets, switches
Painting
Piping
Wiring
Install doors & windows
Gutters
Iron sheets
Tiers & struts
Roofing
Construct pad footings
Cons. Columns, slabs, & walls
Excavate
Leveling
Assemble team
Site prep.
Assemble resources
Remove veg.
Preparing drawings
Design approval
Design changes
Construction
Finishing
Design
Planning
Design
Erect fense
Hand over
Project Network
|
Code |
Tasks |
|
2 |
PLANNING |
|
2.1 |
Assembling resources |
|
2.2 |
Assembling construction team |
|
3 |
Site preparation |
|
3.1 |
Removal of vegetation |
|
3.2 |
Leveling |
|
3.3 |
Excavation |
|
3.4 |
Erecting a protective fense |
|
4 |
CONSTRUCTION |
|
4.1 |
Construction of pad footings |
|
4.2 |
Construction of columns, slabs, and walls |
|
4.3 |
Roofing |
|
4.3.1 |
Erection of tiers and struts |
|
4.3. 2 |
Nailing of iron sheets |
|
4.3.3 |
Erection of gutters |
|
5 |
FINISHING |
|
5.1 |
Installation of doors & windows |
|
5.2 |
Wiring |
|
5.3 |
Piping |
|
5.4 |
Fixing of wires, lights, switches, consumer unit, sockets, |
|
5.5 |
Paiting |
|
5.6 |
Installing window panes |
|
5.7 |
Flooring |
|
5.8 |
Installation of shelves, tables, & chairs |
|
5.9 |
Installation of alarm system |
|
6 |
Hand over the project |
Archect Drawings
3.1
2.1
Design Approvals
start
2.2
5.1
5.4
5.2
5.3
5.5
5
4.3.3
4.3.2
4.3.1
3
4.2
4.3
End
5.9
5.8
5.7
5.6
4.1
4
3.3
3.2
3
2
Design
Design Changes
|
Tasks |
Duration (days) |
Start |
Finish |
|
PLANNING |
|
1/30/20 |
2/15/20 |
|
Assembling resources |
2 |
|
|
|
Assembling construction team |
3 |
|
|
|
Site preparation |
3 |
|
|
|
Removal of vegetation |
2 |
|
|
|
Leveling |
2 |
|
|
|
Excavation |
5 |
|
|
|
Erecting a protective fense |
2 |
|
|
|
CONSTRUCTION |
|
3/1/20 |
7/15/20 |
|
Construction of pad footings |
15 |
|
|
|
Construction of columns, slabs, and walls |
50+ |
|
|
|
Roofing |
5 |
|
|
|
Erection of tiers and struts |
2 |
|
|
|
Nailing of iron sheets |
2 |
|
|
|
Erection of gutters |
1 |
|
|
|
FINISHING |
|
8/3/20 |
8/15/20 |
|
Installation of doors & windows |
6 |
|
|
|
Wiring |
5 |
|
|
|
Piping |
4 |
|
|
|
Fixing of wires, lights, switches, consumer unit, sockets, |
5 |
|
|
|
Paiting |
5 |
|
|
|
Installing window panes |
3 |
|
|
|
Flooring |
1 |
|
|
|
Installation of shelves, tables, & chairs |
8 |
|
|
|
Installation of alarm system |
10 |
|
|
|
Hand over the project |
3 |
|
|