1. Project Overview 3

1.1 Purpose 3

1.2 Project Objective 3

1.3 Project component 3

1.4 System Boundary 4

2. Project Plan 5

2.1 Work breakdown Structure 5

2.2 Project Estimation 6

3. System Integration Best Practice’s 6

3.1 Project Practices 6

3.2 System Integration Architecture Flow Chart 7

4. Requirement Specification 8

5. Enterprise System Integration Approach Evaluation and Selection 9

6. Proposed System Integration Components Architecture 10

7. Implementation Framework 11

8. System Integration Implementation 12

9. Reference 13

Quality Payment Program

Integration Specification

<Page 1 of 11>

1. Project Overview

Purpose

Project Objective

Project component

This system will use the following major components:

· Engineer

· Data

· Hardware

· Software

· Network

https://www.mbaknol.com/wp-content/uploads/2010/08/Components-information-system-mbaknol.png

Diagram 1 System Components

System Boundary

System boundary will include:

· Farewells

· System Environment

· Security Application components (HTTPS)

· Information System.

Example Flow Diagram

Diagram 2 System Boundary

Project Plan

Work breakdown Structure

Quality Payment Program System

1.1 Initiation, Concept and Planning

1.1.1 Engineer review / Architectural review

1.1.2 Stakeholder selection review

1.1.3 Project Review

1.2 Requirement Analysis and Design

1.2.1 Project Requirement Review

1.2.2 Create Preliminary Design Review

1.2.3 Develop a detail Design Review

1.3 Development And Testing

1.3.1 System Environment Review

1.3.2 System Environment Validation

1.3.3 Design System Implementation

1.3.4 Procure Hardware/Software

1.3.5 Install Development System

1.3.6 System Testing Phase

1.3.7 Install Live System

1.4 Implementation

1.4.1 System Implemented

1.4.2 Documentation

1.4.3 Go Live

1.4.4 Sign off from the Stakeholder

1.5 Operation And Maintenance / Disposition

1.5.1 Post Implementation

1.5.2 Annual Testing of the security component of the system

1.5.3 Update Documents

1.5.4 Disposition / End live

Project Estimation

The project is proposed to start by October 4th, 2017 and all projects deliverables are ready and submitted by November 7th, 2017.

System Integration Best Practice’s

Project Practices

Because CMS as an organization is committed to strengthening their own information system development life cycle processes. For the organization to respond quickly to business demands and as specified by FISMA law. CMS created the Expedited Life Cycle (XLC) to help coordinate and develop IT projects.

These XLC provide steps by steps process in developing a system, create a good communication between the stakeholder and the project manager to communicate. Through the planning / initiation phase, it allows the system engineer and designers to communicate with each other and decide whether the clients’ requirements of the system are meets.

System Integration Architecture Flow Chart

Service exposure

Requirement Specification

(TBD)

Enterprise System Integration Approach Evaluation and Selection

(TBD)

Proposed System Integration Components Architecture

(TBD)

Implementation Framework

(TBD)

System Integration Implementation

(TBD)

Reference

Shelly, G., & Rosenblatt, H. (2012). System analysis and design. Mason, OH: Cengage Learning.

Clark,K. (March 18, 2005) Comparing web APIs with service-oriented architecture and enterprise application integration

https://www.ibm.com/developerworks/websphere/library/techarticles/1503_clark/1305_clark.html

https://qpp.cms.gov/docs/Quality_Payment_Program_Overview_Fact_Sheet.pdf

https://security.ufl.edu/wp-content/uploads/2014/06/Bad-System-Diagram.png

https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-Information-Technology/XLC/index.html

https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-Information-Technology/XLC/Phases.html

https://security.ufl.edu/it-workers/risk-assessment/creating-an-information-systemdata-flow-diagram/#prettyPhoto