Type down a report (Water Treatment)
About the Lucas County Maumee River Waste Water Treatment Plant:
In June 1970, a contract was signed by the City of Maumee, Lucas County, and the Ohio
Water Development Authority to finance, construct, and operate a regional wastewater
treatment facility to service Maumee, Waterville, Holland, and other limited portions of
unincorporated Lucas County. Construction was started on the new wastewater treatment
plant in March 1971. The Maumee River Wastewater Treatment Plant (MRWWTP) was placed
into service in early 1973 as a five MGD activated sludge treatment plant with a hydraulic
capacity of 12.5 MGD. The Lucas County Waste Water Treatment Plant is located in
Waterville, OH and operates 24 hours per day. This facility also generates electricity through
co-generation.
In 2003-2004, the Maumee River WWTP was expanded again to increase the design / peak
capacity by 7.5/17.3 MGD (Plant total is now 22.0/47.3 MGD). These improvements were
constructed as a totally separate liquid treatment train called the West Plant. The former
Plant B is now called the East Plant. The West Plant treatment includes influent screening
and grit removal for preliminary treatment, a primary clarifier, chemical addition for
phosphorus removal, two two-pass aeration basins for activated sludge treatment, two final
clarifiers, and an ultraviolet disinfection system. The new West Plant was constructed with
the future capability to be expanded to a design / peak capacity of 15.0/34.5 MGD.
In addition to the construction of the new West Plant, the County also made several
improvements to the East Plant, the Anaerobic Digesters, Sludge Storage Facilities, and the
Administration Building. The improvements to the East Plant included replacing the old
centrifugal blowers with new, energy-efficient single-vane centrifugal blowers; replacing the
coarse bubble diffusers in the aeration tanks with fine bubble diffusers; replacing the old
chlorination / de-chlorination system with and Ultraviolet Disinfection system; and, installing
bio-scrubbers for odor control at the aerated grit chamber and raw sewage pumping station.
The other changes to the MRWWTP included increasing the Anaerobic Digester gas line
sizes, adding an additional dewatered sludge storage pad, and adding new offices,
conference rooms, and storage space in the Administration Building
In 2010, the MRWWTP included improvements with the selection, purchase, and installation
of a new centrifuge for dewatering digested sludge. Lucas County received financing and
grants for the installation of the new dewatering centrifuge, and completed the project in
2010. The installation of the new centrifuge was adjacent to the belt filter press, where it
was used with a truck loading conveyor. The belt filter press is being retained as backup
dewatering equipment in the event the centrifuge is out of operation for service or repair.
The long range plan for the facility is to purchase a second centrifuge and construct a new
dewatering building adjacent to the sludge storage pads. The wastewater flows for the
Lucas County Sewer Service Area are projected to be met by the facility’s most recent 7.5
MGD plant expansion through the year in 2020.