Operation Research LP help
A steel company transfers steel from three factories (1, 2 and 3) to three construction sites (A, B and C). The production capacities of the three factories (1, 2 and 3) are 150, 175 and 275 tons, respectively. While the three construction sites (A, B and C) have requirements of 200, 100, and 300 tons, respectively. The table below summarizes the shipment costs per ton from each factory to each construction site.
|
|
Site A |
Site B |
Site C |
|
Factory 1 |
C1A |
C1B |
C1C |
|
Factory 2 |
C2A |
C2B |
C2C |
|
Factory 3 |
C3A |
C3B |
C3C |
Where C1A = 1 + [(134077) mod (1)], C1B = 1 + [(134077) mod (3)],
C1C = 1 + [(134077) mod (5)], C2A = 1 + [(134077) mod (7)], C2B =
1 + [(134077) mod (9)], C2C = 1 + [(134077) mod (8)], C3A = 1 + [(134077) mod (6)], C3B = 1 + [(134077) mod (4)], and C3C = 1 + [(134077) mod (2)].
a) Determine a basic feasible solution using the following three methods:
i. The North-west corner method.
ii. The Least-cost method, and
iii. The Vogel approximation method.
b) Determine the optimal solution using the steppingstone method. Start using the Vogel’s approximation feasible solution.