HD assignment on project management

profileSatocthcm09
10009_Saroj_THAPA_MAGAR_201700076_101114_165917504.docx

ASIA PACIFIC INTERNATIONAL COLLEGE

GROUP ASSIGNMENT COVER SHEET

STUDENT DETAILS

Student name:

Saroj Thapa Magar

Student ID number:

201700076

Student name:

Manjesh Thapa

Student ID number:

201700239

Student name:

Mausham Khadka

Student ID number:

201700851

Student name:

Saurav Manandhar

Student ID number:

201502813

Student name:

Bikal Khatri

Student ID number:

201800867

UNIT DETAILS

Unit name:

Unit number:

SBM 3307

Course name:

Project Development and optimization

Class day and time:

Thursday1-5

Lecturer and/or Tutor name:

Dr Sujak Bakir

ASSIGNMENT DETAILS

Title:

Unit project-1

Word count:

Due date:

31 march

Date submitted:

30 march

Campus (where you are enrolled):

APIC Sydney

DECLARATION

I/we hold a copy of this assignment if the original is lost or damaged.

I/we hereby certify that no part of this assignment has been copied from any other student’s work or from any other source except where due acknowledgement is made in the assignment.

I/we hereby certify that no part of this assignment has been submitted by me in any other (previous or current) assessment, except where appropriately referenced, and with prior permission from the Lecturer/Tutor for this unit.

No part of the assignment has been written/produced for me/us by any other person except where collaboration has been authorized by the Lecturer/Tutor concerned.

I/we am/are aware that this work will be reproduced and submitted to plagiarism detection software programs for detecting possible plagiarism (which may retain a copy on its database for future plagiarism checking).

Student’s full name:

Saroj Thapa Magar

Student’s full name:

Manjesh Thapa

Student’s full name:

Bikal Khatri

Student’s full name:

Saurav Manandhar

Student’s full name:

Mausham Khadka

Contents Selecting the best alternative for food storage 4 Developing the alternatives 5 Buying the cold room 6 Experience with similar projects 7 Project Duration: 7 People: 7 Bottom-up Estimating: Estimating from the Bottom to the Top 8 Fixed cost required for buying a cold room 8 Installing expense: 8 Rent: 8 Insurance and tax: 9 Variable costs for buying the cold room 9 Labor or contractor cost: 9 Material cost: 9 Transportation cost: 9 Maintenance cost: 9 Cost estimation Buying 10 Renting the cold room 10 Sustainability Plan 11 Reference 14

Selecting the best alternative for food storage

The team of Homeless Organization Named “Jay Nepal” has been working on a project for five years, the project that has the main aim of eradicating homelessness from our streets. It has achieved a lot through the past years and as stipulated below there are factors that have kept the shelter running just like any project.

Although it is a kind of homeless shelter that is considered during emergencies such as adverse weather conditions the shelter has been functional to cater to individuals. The shelter has sections such as the kitchen and the sleeping area, with 200 beds which mostly facilitates 200 people, till the last month was serving for 80 people. So, the shelter provides meals clothing and other facilities for the people that mostly comes from good wishers and government funding. It has been in operation for about five years and there is more the team has learned about the shelter for that time. The project was scheduled for 10 years so currently there are only five years remaining to establish the way forward that is it will continue its operations or it will be closed. That all depends on the stakeholders such as the federal government who are the major financiers of the project, covering costs such as salaries, security, supplies in terms of any requirements. That is of course in addition to other organizations such as the nonprofit organizations who come in to provide, extra staffs who work on a voluntary basis in helping through the activities, and at times provide grants and other requirements, basically, that’s what the University around us does. So basically, we have plenty of help from others that has made us successful through those past five years which supported the organization to make an addition of 70 people in the shelter in next one month. By then the total will be 150 people, the shelter will surge the challenges of providing extra foods, storage and other facilities to these people. Earlier there were five big refrigerators of 2000 liters capacity that was enough to store foods and groceries for 80 people. Thus, the organization will not able to fit and store all the food stuffs for 150 people in five refrigerators. So, the management team has developed the following alternatives to eradicate the storage problems.

Developing the alternatives

1) One proposed solution would be adding 5 more brand new refrigerators of same capacity.

2) Or another option would be buying 5 second hand refrigerators

3) Installing a new cold room near the location – Buying a cold room

4) Or renting the cold room

Basically, the cost of a brand-new fridge is $8000 so it will cost $40000 for adding 5 new fridges. Roughly it will take an addition fixed labor cost of $800 to set up and monthly electric bill as previous record around $3000 for 5 fridges. So, the new fridges in total will emerge a new electric bill of around $6000 per month. But the main issue with adding 5 new fridges will be the problem of space and the most importantly electric load which it can’t handle. Already with the usage of 5 fridges there has been issue regarding power cut off due to overloading of the sockets. That clearly represents with the installation of new additional fridges the problem will become more devasting. Hence the management team of homeless organization had denied the option of adding new fridges or buying some second hand fridges. Besides, the project is for five years and adding up some second hand fridges which don’t have any warranty that it will run for the required period will bring some extra issues that leads to waste of money and time in the future.

So, the team has decided to go for other alternatives of Installing a cold room. The best solution for installing a Cold room can be either buying it or renting it.

Buying the cold room

So, the project at hand is finding a cold room. According to the organization, the budget of the project is $50000 for finding the space and installing the cold room and the projects should be completed in 3 weeks.

· The first task of the project is cold room hunting that is looking for available offers (in the range of around Approximately $3,000 per week), followed by accepting the bid including proper exhaust system and preferably nearby location especially closer to the kitchen, for the first week.

· The next task is finding contractors who will hire labors providing them the total wage of around $17000 at the end of the task if they don’t come with the required supplement and equipment (i.e. Approx. 1215 per day for all the labors and the contractor) , including hauling expense and installing fee required for the materials and equipment to construct the cold room.

· The other task is finding vendors that will supply everything needed for the cold room which comes under the budget of around $30000 that is if the contractor doesn't come with them, for the second week.

· The final task should be to begin the work that should take the first days of the second week to the end of the third week.

Obviously, there are challenges that the team tend to check on, which are the factors that affect the cost estimation of the project. They include:

Experience with similar projects: this comes as a challenge whereby if the team has not been able to deal with similar projects in the future it would bring some uncertainty. But the team had dealt with similar projects in future hence it won't cause uncertainty.

Planning Horizon: the next that was in consideration during cost estimation is the horizon, whereby the longer the horizon that's where uncertainty sprouts. But this project can be compared to a mini project that only takes three weeks thus gave us the opportunity to have better estimate costs. (Roberts 2011).

Project Duration: this factor is simple, whereby a greater uncertainty is brought by projects that are longer, similarly to the planning horizon whereby a shorter duration will directly lead to the establishment for most of the costs.

People: the people in the project are skilled and are in a good number hence they will be useful when coming up with the cost estimates, but the challenge comes in when we are not sure whether there will be more people from the contractor from the organization, this will also lead to uncertainty. (Akintoye 2000)

The team decided on settling on the bottom-up estimation techniques because it is the one which is considered most accurate. This is because it also involves the team members, in the case that their inputs are required in the estimating process. This is possible because the team members work the project manager to comes up with the estimates from the task level developed at the Work breakdown structure. This means that it will provide cost and duration estimation, but it took some time because of the involvement of all the team members that will give them a higher level of commitment from the project team. (Gasik 2011)

Bottom-up Estimating: Estimating from the Bottom to the Top

This cost estimation method breaks down the project into small parts and estimates cost in more detailed way. Then the overall cost is estimated by adding all estimates. The team worked from the lowest detail in the work breakdown structure. The team developed the work package below that goes with the work breakdown structure.

Fixed cost required for buying a cold room

Installing expense: The total budget for installing the cold room is $50000 that is for 3 weeks till the cold room is completely installed which includes the following cost.

Rent: $3000 per week which becomes monthly $12000 equivalent to $720,000 at the end of five years (duration of the project is five years).

Insurance and tax: Including both tax and insurance of the cold room it will take around $5000 a year which equivalent to $25000 in five years.

Variable costs for buying the cold room

Labor or contractor cost: 1215 per day (since the constructing and fitting works started from second week and finish by end of third week i.e. 14 days it will cost roughly $17000).

Material cost: $30000 which includes the cost of lighting equipment, cooler, Racks and shelves, sealed doors etc.).

Transportation cost: Transportation cost will be included under material cost.

Maintenance cost: The cold room has to be maintained its well-functioning at least once in a six month which will cost around $3000. Hence, in total it will cost $30000 at the end of five years.

Cost estimation Buying

The team established from their individual tasks that it will cost $ 50000 installing cold room which includes contractor or labor cost, materials cost, transportation cost. The rent of the room will cost $720000 at the end of five years, that is to the addition of about an estimated $30000 for the maintenance in five years ($3000 every six month) and an additional $25000 for tax and insurance of the cold room. When all these figures will be added to the buying price of the cold room, we get $825000 estimated cost for buying the cold room.

Renting the cold room

The team established that there are companies who offer rented cold rooms that are portable, whereby it was seen feasible that it could fit in an idle space at the shelter. For the cost estimation of renting historical data from similar projects to estimate the costs will be used. Thus, for renting the cold room the team decided on settling on the top-down estimation techniques because it is the one which is considered most accurate. Based on the historical data of similar project as seen on other organization where companies had rented cold room selected INDEXES estimation techniques where the cold room vendor rented, he cold room for $ 3500 per week. Whereby there is the $ 60000 contract fee for the vendor. Whereby maintenance the vendor will provide as long as the contract is valid hence, concluding that within that five years there will be 60 months and the cost for maintenance of the cold room is estimated $ 10000 per month that adds up to $ 60000 plus the $ 100000 contract fee, renting cost comes up to an estimated $970,000 for the five years including $10000 insurance cost for five years.

By then the index figure for the similar project of renting cold room was 212 in 2012 with total cost of the cold room $970,000 including all costs. Referencing the project with similar function, type and size currently the index in 2019 has reached 286. Calculating the cost of renting a cold room in 2019 using index estimating techniques, $970,000(286/212) = $1308585.

Hence the cost of renting will cost over 1 million dollars.

Hence the installing up the cold room has been seen as the best solution for the team as per the estimation which is the better choice. This because the estimated cost for renting comes to over 1 million (i.e. $1308585) and the estimated cost for buying the cold room comes to $825000.

Comparing the Order of Magnitude between buying and renting the cold room.

renting the cold room is $1308585 that becomes 1.308585 * 10^6 i.e. 6.

Buying the cold room is $825000 that becomes 8.25000 * 10^5 i.e. 5.

Thus, buying can fit the budget and the time frame the organization gave. But also, the team focused on sustainability and project optimization and came up with the following.

Sustainability Plan

The team took an audit of the organization and checked what resources we had in place in order to establish what needs to be added or what is enough, based on the continuation of the project when the federal funding is complete in order to achieve the long-term vision. Basically, the feeding and grooming the homeless project is something that has been done before, we could tell by looking at the files since almost all of the team members are new. Currently, the organization has only the team members who are the same people who will be on the field, none of them can do the cooking hence the need for hiring a catering team. Or alternatively, we could come up with funding that can be used to liaise with the shelter so that we can provide the food to be cooked and help in serving. The next resource we have is transportation but it will not be sufficient we will need to hire since there will volunteers who will come to help with the project for a month which will be rather costly. The other resource we have would be through our social media sites and our website where we can use them as avenues to gather as much support as possible because of the big task ahead of us. (Gasik 2011)

This came to the conclusion that other funding will be needed, simply because it will affect the activities of the organization and definitely strain the staff. They will be burdened which will directly translate to not performing well, that leads to not achieving the goals of the project. This made the team result in coming up with a possible network of supporters in this area. That is parties that have worked with the organization previously or potential supporters this time around. This might be individuals or organizations. But on the other hand, the team had a contingency plan, which was maybe charging a fee for people who will come to support the cause, whereby the proceeds will be channeled back to the project for various activities. This could be done through maybe making souvenirs that could be bought so that the participants have something to show after the successful completion of the project. It’s better than just charging them without showing appreciation, it could be printed t-shirts or even bandanas. The organization had previously done that and it worked whereby they could not outside funding. But since outside sources are needed the time resulted in the following websites www.cfda.gov and www.grants.gov which are potential sources for funding.

The team was able to come up with a list that we would use to as sources for future funding to ensure that everything will be in place. These include:

Other Federal Funds: The Funds that we are receiving from the government are just a fraction of the funding the federal government offers, hence doing more digging in the funding put aside for community development projects that are community initiated. This will be fulfilled by showing them how our projects fit into the categories for funding or rather more funding.

Organization Funds: their times the organization is able to provide funding just to finish the project. This is very rare and occurs in the times that some projects have defaulted. Hence the team, in this case, will come up with a letter of support from the governing body.

Private Foundations Grants known as Continuation grants: by providing information to a private organization of how our project fits into their programs we can grant to support the continuation of the project.

State Funds: State also provide continuation funds; the only things require is providing information on how the project fits into the program of grants which the team is dealing with. That is, they require that the project directly benefits the immediate community whereby our project is just that.

Unrestricted Revenue: The project can generate revenue as the team previously touched on, this can be from fees charged, selling of goods whereby the revenue can be used to generate the project. The team came up with charging fees and selling of souvenirs, whereby we kept it important that the proceeds should not be used prior to exhaustion of the federal funds.

Universities: Universities provide funds for programs and projects or provide project staff who are mainly degree candidates, this may be part of their community social responsibility. For instance, Asia Pacific International College has been partnering with the organization before, so what is required is just a request.

Partnerships: regional and local partners may come in to assist in continuing projects when funding has ended, this was also considered as a method of sustainability by the team.

The above choices in place will definitely help the project to completion, whereby the team concluded with all those options we cannot miss all of them hence seem effective. But to also keep in mind that these options are only for continuing projects and should help the team conclude the project. In the case where the federal funding can complete the project, it is safe to spell out the extra resources will be used to benefit the community in the long run even after the project has come to completion, this will ensure transparency between the organization and other stakeholders.

Reference

Jung, Y and Woo, S, 2004. Flexible work breakdown structure for integrated cost and schedule control. Journal of construction engineering and management130(5), pp.616-625.

Akintoye, A, 2000. Analysis of factors influencing project cost estimating practice. Construction Management & Economics18(1), pp.77-89.

Roberts, P., 2011. Effective Project Management: Identify and Manage Risks Plan and Budget Keep Projects Under Control. Kogan Page Publishers.

Gasik, S., 2011. A model of project knowledge management. Project Management Journal42(3), pp.23-44.

Australian Financial Review 2019. Diesel generators cost $339m in SA power fix. [online] Available at: <https://www.afr.com/business/banking-and-finance/diesel-generators-cost-339m-in-sa-power-fix-20171221-h08axd/> [Accessed 16 Mar. 2019].

Nrel gov 2019 [online] Available at <https://www.nrel.gov/docs/fy16osti/66579.pdf/> [Accessed 21 Mar. 2019].