Discussion Board Forum 3
1.8 Case Study
RPO Construction has been hired to build a custom-made executive home in Vancouver, Washington. Two acres of property have been purchased on the banks of the Vancouver Harbor by a retired executive and his wife for the location of their new custom home. The single-family residence will be an 8,500 square feet, two-story structure consisting of wood frame, cement slab foundation, and tile roof. There will be a three-car garage attached, fully landscaped front yard with circle-around driveway, patio, and deck off the rear of the house overlooking the harbor. The deck will include an infinity pool and oversized spa with outdoor kitchen appliances. A dock with a boathouse will be constructed at the water’s edge with the patio decking connected by a wood staircase.
Details of cost are as follows: slab floor $32,000, total risk $9,000; septic sewer system cost $18,800, total risk $5,100; dock and boathouse cost$82,000, total risk is $11,000. Contractor agreed to a late completion penalty of $2,500 per day each day the project extends beyond the completion due date.