06238 -3pages- within 48hrs

profileltdprinwival
06238Topic_Pr.doc

06238 Topic: Project Management

Number of Pages: 3 (Double Spaced)

Number of sources: 1

Writing Style: APA

Type of document: Other (Not listed)

Academic Level:Undergraduate

Category: Business

Language Style: English (U.S.)

Order Instructions: Attached

I have already started this project please see uploads with instructions.

Course Project Part 5—Due Week 5 (graded, 35 points)

Assignment Tasks Deliverable(s) Points

Earned Value Analysis

1. Set the project status date to a date that is halfway through your project. Your project should show the tasks completed as of that date and any cost changes that have occurred. At least 10% of your task should reflect a cost overrun and 5% should come in below budget. You can choose which tasks to modify.

See below:

1. Complete the Earned Value Analysis (EVA) utilizing all three methods. Go to [REPORT>Costs>Earned Value Report]. See below:

2. Save the report as a PDF Earned Value Report – PDF

MS Project file 15 points

Project Status Communica-tion

Interpret the results of the EVA and write a narrative as a Project Status communication in an MS Word document. The interpretation of the following calculation is required:

1. Variance Analysis

2. Performance Index

3. Project Percentage Analysis Project Status with EVA interpretation (Word doc) 20 points