PROJECTS

profilesmartman1212
01-IT243-PROJECT-Details_Updated.docx

IT243 TEAM PROJECT

Brief description

Students will conduct a systems analysis project by performing 3 phases of SDLC (planning, analysis and design) for a small (real or imaginary) organization. The actual project implementation is not required (i.e. No coding required.) They need to apply what they have learned in the class and to participate in the team project work.

Important dates

Proposal

Presentation

Final Report Submission

Week 4 and 5

Week 14

Week 15

Process for the project

Performing a

Submitting a

group of 2-3

Submitting a

final project

students and

proposal that

report by the

giving your

describes the

stated due

Team a name

selected topic

date

Selecting a

Each group

topic/project

should

defend their

work through

an oral

presentation

What to include

This project should follow the main steps of the first three phases of the SDLC (phase 1, 2 and 3). Here is a list of these main requirements that are expected to be followed by all project groups.

Planning Phase

•Project identification/ Project Proposal

•Adopt a SDLC

development

methodology

•Develop a work plan (Task identification or Gantt chart)

Analysis phase

•Determine main business requirements

•Create Use Cases

•Model Processes (Data Flow Diagramming)

•Model data (ER modeling)

Design phase

•Select an architecture design

•Screens Design (create the User Interface Structure Design), and sample system screens. No need to be in HTML, they can be just drawing of how the screen will appear.

•Class Design Diagram

Implementation

phase

Not

included

Marking criteria

In total, 10 marks are allocated to this project which will be split as follow:

1 mark for

5 marks for

4 marks for

the project

the final

the

10 marks

proposal

report

presentation

GENERAL POINTS

Groups will be created in the blackboard where members of each group can share ideas

and submit their work.

A single submission is enough; therefore, each group should have a leader to do this job. Two templates will be given to students to use them in the project work

Not respecting the deadline will result in 0 mark.