Unit IV Project 

 

Hazard Analysis and Risk Assessment Project 

 

Be sure to read all of the instructions. There are two documents to be prepared and submitted. 

 

1. Following steps 1-11 of the Hazard Analysis and Risk Assessment Guide in the course textbook (pp. 171-174), develop a risk assessment for a serious workplace hazard with which you are familiar, or use Addendum D to Chapter 11 (pp. 202-206) to help you select a hazard. Evaluate the hazard and its associated risks, and then complete the Hazard Analysis and Risk Analysis Project form (click here to access this form). To complete the Initial Risk Assessment and Post Control Risk Assessment sections, use the following codes based on the Risk Assessment Matrix in Table 11.10 (p.180) of the textbook: 

 

SEVERITY:

 

 1 – Catastrophic 

 

2 – Critical 

 

3 – Marginal

 

 4 – Negligible 

 

PROBABILITY (Likelihood of Occurrence):

 

 A – Frequent 

 

B – Probable 

 

C – Occasional 

 

D – Remote 

 

E – Improbable 

 

RISK CODE: 

 

H – High 

 

S – Serious 

 

M – Medium 

 

L – Low 

 

All sections of the form must be completed. Note that the “Post Control Risk Assessment Measures” section reflects the risk assessment AFTER applying the additional control measures. 

 

2. In a separate document of at least 500 words, explain the reasoning behind how you filled out each section of the form. Use references as needed to support the discussion. Also need references.

 

  • 7 years ago
  • 20
Answer(2)

Purchase the answer to view it

blurred-text
NOT RATED
  • attachment
    week_iv_project__.docx

Purchase the answer to view it

blurred-text
NOT RATED
  • attachment
    order_38678_95008.docx
  • attachment
    order_38678_95009.docx
Bids(1)