We noted in the chapter that kanban is not a planning tool but a control mechanism. What did we mean by that? How does the MRP-kanban example in Example 16.4 illustrate the point?
pranav2008 (Not rated)
(Not rated)
12 years ago
Kanban system
NOT RATED
Purchase the answer to view it

- kanban_dq.doc