total revenue being equal

profilecybacatx
 (Not rated)
 (Not rated)
Chat

Question 1

The volume that results in total revenue being equal to total cost is the



..a.         marginalvolume.


..b..break-even point.


..c..profit mix.


..d..marginal cost.


.




3 points  

QUESTION 2

. 
Activities K, M and S immediately follow activity H, and their latest start times are 14, 18, and 11. 
The latest finish time for activity H



..a..is 11.


..b..cannot bedetermined.


..c..is 18.


..d..is 14.


.




3 points  

QUESTION 3

. 
When activity times are uncertain,



..a..use the most likely time


..b.. assume they are normally distributed


..c..calculate the expected time, using (a + 4m + b)/6.


..d..calculate the expected time, using (a + m + b)/3.


.




3 points  

QUESTION 4

. 
Which of the following is always true about a critical activity?



..a..LF = LS.


..b..EF = ES.


..c..ES = LS.


..d..LS = EF.


.




3 points  

QUESTION 5

. 
Which of the following is a general rule for crashing activities?



..a..Crash the path with the fewest activities.


..b..Crash activities with zero slack.


..c..Crash only non-critical activities.


..d..Crash activities with the greatest number of predecessors.


.




3 points  

QUESTION 6

. 
When the value of the output cannot be determined even if the value of the controllable input is known, the model is



..a..digital.


..b..deterministic.


..c..analog.


..d..stochastic.


.




3 points  

QUESTION 7

.A simulation model uses the mathematical expressiios and logiclrelaionships of the



..a..real system


..b..computer model


..c..performance measures


..d..estimated inferences


.




3 points  

QUESTION 8

.A quantity that is difficult to measure with certainty is called a



..a..risk analysis


..b..project determinant


..c..probabilistic input


..d..profit/loss process


.




3 points  

QUESTION 9

.
The number of units expected to be sold is uniformly distributed between 300 and 500.  If r is a random number between 0 and 1, then the proper expression for sales is



..a..200(r)


..b..r + 300


..c..300 + 500(r)


..d..300 + r(200)


.




3 points  

QUESTION 10

.When events occur at discrete points in time



..a..A simulation clock is required


..b..the simulation advances to the next event


..c..the model is a discrete event simulation


..d..All of the alternatives are correct


.




3 points  

QUESTION 11

.In order to verify a simulation  model



..a..compare results from several simulation languages


..b..be sure that the procedure for calculation is correct


..c..confirm that the model accurately represents the real system


..d..run the model long enough to overcome initial startup results


.




3 points  

QUESTION 12

.Simulation



...does not guarantee optimality


...is flexible and does not require the assumptions of theoretical models


...allows testing of the system without affecting the real system


...all of the alternatives are correct


 

 

 

 

Chapter 9. Problem

  

Given this network with activities and times estimated in days,

 

  

Activity 

OptimisticMost

Probable 

Pessimistic 

 A256 

 B137 

 C6710 

 D51214 

 E345 

 F8912 

 G468 

 H368 

 I5712 

 J121314 

 K134 

  

a.What are the critical path activities?

b.What is the expected time to complete the project?

c.What is the probability the project will take more than 28 days to complete?

  

 

    • 12 years ago
    100% Quality Work A+ Tutorial Guaranteed Work for you use as Guide
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      total_revenue_being_equal.docx