scope & time management Creating WBS improves the chances of IT project being a success

profileAmazingExpert
 (Not rated)
 (Not rated)
Chat

Overview:

As the IT Project Manager, you have been assigned a project to deploy ten (10) wireless access points in your company’s warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.

Your submission will also be graded on the accuracy of your work package assumptions and duration estimates.

Section 1: Work Breakdown Structure (WBS)

Required Format (MS Project File)

1. Use Microsoft Project or Open Project (.mpp format) to create a WBS in which you:

a. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).

b. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.

c. Create a Work Breakdown Structure Code for each task.

d. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.

e. Create accurate work package assumptions and duration estimates.

Section 1 of your assignment must follow these formatting requirements:

? Microsoft Project or its open source alternative in .mpp format.

Section 2: Summary Document

Required Format (MS Word File)

2. Use Microsoft Word to write a one (1) page summary in which you:

a. Summarize how this activity improves the chances of your future IT project being a success.

b. Use at least one (1) quality resource in this assignment.Note:Wikipedia and similar Websites do not qualify as quality resources.

Section 2 of your assignment must follow these formatting requirements:

? Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all

    • 11 years ago
    scope & time management Creating WBS improves the chances of IT project being a success Use as Guide
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      scope__time_management_appendice.docx
    • attachment
      scope__time_management_project--wireless-access-system-2.mpp
    • attachment
      scope__time_management_wbs.docx
    • attachment
      scope__time_management_wbs.mpp