"Road Ready Tire Co. manufacturers automobile tires. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,200 tires were as follows: Direct Materials: Standard cost 71,000lbs at $5.10 Actual Costs 70,600lbs at $5.00 Direct Labor: Standard Costs 1,300 hrs at $17.50 Actual Costs 1,330 hrs at $17.80 Factory Overhead: Standard Costs: Rates per direct labor hr., based on 100% of normal capacity of 1,350 direct labor hrs: Standard Costs Variable cost, $3.10 Actaul costs $4,000 variable cost Standard Costs Fixed cost, $4.90 Actual costs $6,615 fixed cost
Each tire requires 0.25 hour of direct labor.
Alternative Computation of Overhead Variances:
Factory Overhead
Actual Costs Applied Costs
Balance
Budgeted Factory
Actual Factory Overhead for Amount Applied Factory
Overhead Produced Overhead
Variable cost
Fixed cost
Total
F U
Controllable Volume 
Variance Variance
U
Total factory
overhead
cost variance 

    • 12 years ago
    100% correct answer A+++++++++++++++++++TUTORIAL GUARANTEED PERFECT
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      road_ready_tire_co.xlsx