Project Mngt Definitions

profileah1234

In depth definitions applied to a project task, I will incorporate #'s

Building an egg launcher to catapult an egg 20ft across and 10 ft high

The egg must achieve free flight for at least 10 ft.

The egg must achieve a minimum height of 10 ft.

The egg must be released by the system at a height of no more than 2 ft

The egg must land and remain in a circular target area with a diameter of 3 ft.

Can't break egg

50% of egg must be open to the air and visible, and touchable

Refresh rate no more than 1 minute

System must come packed in a box that it can be dropped a distance of 4 ft, still operational

System fired 3 times, evaluated on 2

First fire test, next two eval

WBS = Work Breakdown Structure

PMB = Performance Measurement Baseline

 

  • 10 years ago
  • 5
Answer(0)