production operations
smartkidshow all work
Sam P. LeMean, Quality Assurance Analyst for Frenchie's Chocolate Kisses, wants to construct a control chart for determining that his factory is under control with regard to a particular quality variable) Accordingly, he collected four samples of six units each of output from his production line, with the following results:
SAMPLE # MEASUREMENTS
======== ======================
#1 17; 15; 15; 17; 16; 16
#2 16; 25; 18; 25; 21; 20
#3 23; 24; 23; 22; 23; 22
#4 15; 18; 16; 17; 19; 20
#5 25; 20; 19; 24; 22; 21
Part a)
Using the sample ranges as estimates of variability determine the center line, control limits, sketch the control chart and add the correct plot data (you can draw the lines using “insert”/”shapes” and then add the data points -- be creative) for Frenchie’s control chart. Is Frenchie’s mean in control? EXPLAIN.
Part b)
Determine the control limits, draw the control chart and add the correct plot data for the R-chart for Frenchie’s quality variable. Is Frenchie’s variability in control? EXPLAIN.
- 10 years ago
- 5
Purchase the answer to view it
- production_operations.docx
- This is a question
- if 25% of the producer's sugar is passed from the producer to the herbivore, how much sugar does the herbivore...
- Sociology Analysis Paper(4 pages)
- g(x)=2x^3+5x^2-11x-14
- palmer Industries had a surge in the demand for golf carts over the past three months and needed to improve...
- i need help on a 1 page paper
- FOR ASMA - REWRITE
- What is the mRNA of AATGTG AAC ACA TGC GCC C
- Need lots of homework help daily.
- Bangor Family Practice