Problem 4: Output/Cycle time
See attached file to answer the questions below:
Balance the assembly line for the tasks contained in the table. The desired output is 240 units per day. Available production time per day is 480 minutes.
a) What is the desired Cycle time in seconds? (4 points)
b) What is the theoretical minimum number of stations? (4 points)
c) Use trial and error to work out a solution in the table below. Your efficiency should be at least 90%. (10 Points)
d) Calculate the efficiency of your solution. (2 points)
13 years ago
12
Answer(2)![blurred-text]()
![]()
![blurred-text]()
![]()
Purchase the answer to view it

NOT RATED
- efficiencysolution.doc
Purchase the answer to view it

NOT RATED
- all_answers.docx
Bids(0)
other Questions(10)
- Accounting
- Your organization’s datacenter is located on one of the floors of the building that the organization rents. It has 6...
- Write a paragraph that includes two interesting either/or sentances and two neither/nor sentances about the Ding-A-Ling Brothers Circus, the worst...
- Ava has 1 1/2 sacks of flour. Each sake weighs 5 pounds. how many pounds of flour does Ave have?
- If a car is speeding up and the engine force is 250 N, what can you say about the size...
- describe briefly the purposes of government set out in the preamble to the constitution
- the length of a rectangle is 3 times the width. the perimeter is 96 cm. find the width and the...
- Problem 18- If you borrow $4,000 at $500 interest for one year, what is your effective interest rate for the following rate for the following payment plans? A) Annual payment B) Semiannual payments C) Quarterly payments D) Monthly payments
- The Genesis operations management team is now preparing to implement the operating expansion plan. Previously the firm’s cash position did...
- 0.978 + 32.8 * 7- 1 1/2=