Planning and Scheduling spreadsheet

profilechris6267

Using the downloadable software, templates provided, or other preferred software, such as Microsoft Excel:

  • Complete a WBS for your project.

Work Breakdown Structure

This list of activities needs to contain enough detail so you can effectively plan and schedule your event.

  • Using the completed WBS as a reference, next complete a Gantt chart of your project using the template provided. If you discover in the process you overlooked activities make sure to include them in the WBS.

Gantt Chart

  • In a paper that is a minimum of 2 pages long, identify the Critical Path for your project. Using the WBS and the Gantt chart you constructed for this project analyze how much longer you will need to start planning in advance of your event in order to complete the project? Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.). For more information on APA, please visit the Online Library, which is available through the Resources tab
  • 10 years ago
  • 15
Answer(1)

Purchase the answer to view it

blurred-text
NOT RATED
  • attachment
    gantt_chart.xlsx
  • attachment
    work_breakdown_table.xls
  • attachment
    critical_path_method.doc