OPS571Final_Exam
(Not rated)
(Not rated)
1.Which of the following is considered a major process flow structure?
- [removed]Lead Time
- [removed]Fabrication
- [removed]Lean Manufacturing
- [removed]Project
2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
- [removed]Certification is sought by any firm assuming they pay annual dues.
- [removed]2nd Party – where a customer audits its supplier
- [removed]3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
- [removed]1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
- [removed]Quality management
- [removed]Time management
- [removed]Continuous improvement management
- [removed]Environmental management
4. Which is the one correct value stream principle?
- [removed]Look for efficiencies in the factory, office, physical, procedural, and technical operations.
- [removed]Eliminate waste that stops, slows down, or diverts the value stream.
- [removed]Concentrate on speeding up value-adding operations rather than removing waste.
- [removed]Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
- [removed]Determining the effective capacity over time
- [removed]Estimating design capacity
- [removed]Forecasting patient demand for a reasonable length of time
- [removed]Discovery of the bottleneck operation