Operations Mgmt With Std Dvd Problem
Computer upgrades have a nominal time of 80 minutes. Samples of five observations each have been taken, and the results are as listed.
SAMPLE
123456
79.280.579.678.980.579.7
78.878.779.679.479.680.6
80.081.080.479.780.480.5
78.480.480.379.480.880.0
80.880.180.880.678.881.1
________________________________________
Factors for three-sigma control limits for and R charts
FACTORS FOR R CHARTS
Number of Observations in Subgroup,
nFactor for
Chart,
A2Lower
Control Limit,
D3Upper
Control Limit,
D4
2 1.88 03.27
3 1.02 02.57
4 0.73 02.28
5 0.58 02.11
6 0.48 02.00
7 0.42 0.081.92
8 0.37 0.141.86
9 0.34 0.181.82
10 0.31 0.221.78
11 0.29 0.261.74
12 0.27 0.281.72
13 0.25 0.311.69
14 0.24 0.331.67
15 0.22 0.351.65
16 0.21 0.361.64
17 0.20 0.381.62
18 0.19 0.391.61
19 0.19 0.401.60
20 0.18 0.411.59
________________________________________
a.Using factors from above table, determine upper and lower control limits for mean and range charts.(Round your intermediate calculations and final answers to 2 decimal places. Leave no cells blank - be certain to enter "0" wherever required.)
Mean Chart Range Chart
UCL
LCL
________________________________________
b.Decide if the process is in control.
Yes
No
12 years ago
Purchase the answer to view it

- operations_mgmt_with_std_dvd_problem_sol.docx