Mill Creek Company located in Lakeside

profilexoon
 (Not rated)
 (Not rated)
Chat

Mill Creek Company, located in Lakeside, Oregon, manufactures travel trailers and toy haulers. Mill Creek’s management team has just completed the budget for the upcoming year and has estimated the following costs:

Name of Budgeted Cost Budgeted Cost
Plant insurance $ 86,100 
Testing raw materials 45,000 
Manufacturing equipment setup 7,200 
Quality inspections 57,000 
Property taxes 23,000 
Electricity, plant 14,000 
Electricity, manufacturing equipment 51,250 
Depreciation, plant 18,800 
Depreciation, manufacturing equipment 36,700 
Maintenance worker (manufacturing equipment) 22,500 
Indirect labor (manufacturing equipment setup) 8,300 
Design engineering 220,000 


Required:
1. Assign each of the budgeted costs above to one of the following activity cost pools:
• Engineering
• Equipment setup
• Quality control
• Factory facilities
• Manufacturing equipment

2. Compute the total cost of each pool.

3. Indicate whether the activities in each pool are unit, batch, product, or facility level.

4. Identify the most likely driver for each cost pool from the following list:
• Number of inspections/tests
• Square feet
• Machine hours
• Engineering hours
• Number of setups

Use the following table to organize your answer. The engineering cost pool is done as an example. Other pools may have more than one cost item included.

    • 12 years ago
    100% correct answer A+++++++++++++++++++TUTORIAL GUARANTEED PERFECT PLAGIARISM FREE WORK
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      mill_creek_company_located_in_lakeside.xlsx