MGT 3059 Week 4 Assignment 2: Factory Location Problem

profileHelphere
 (Not rated)
 (Not rated)
Chat

A manufacturer of circuit board parts has factories in a city at the location coordinates shown below. Each coordinate unit (roughly 100 feet) represents a city block. The yearly demand at each factory is also given.

Factory

Demand

X-Coordinate

Y-Coordinate

Glen Mills

20,000

20

150

Media

7,000

55

45

Brandywine

5,000

80

90

Springfield

2,000

90

30

Management has decided to build a new factory to supply raw material to these factories. The location of the new factory should be central to the existing factories.

What should be the map coordinates of the new factory? Graph the locations of the four factories and the proposed raw material factory. Is the location of the proposed raw material factory where you expected it to be based on the coordinates of the other factories? Why or why not? What is the main contributing factor leading to the location of the proposed raw material factory?

 

 

 

    • 10 years ago
    MGT 3059 Week 4 Assignment 2: Factory Location Problem
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      mgt_3059_week_4_assignment_2.xlsx