Maths 533 Project C (A+++++++++++ Work and on the basis of new data) Only for refernce old work

profileJustQuestionAnswer
 (Not rated)
 (Not rated)
Chat

PROJECT PART C:  Regression and Correlation Analysis

Using Minitab, perform the regression and correlation analysis for the data on SALES (Y) and CALLS (X) by answering the following questions.

                          

1.   Generate a scatterplot for SALES versus CALLS, including the graph of the best fit line.

      Interpret.

 

2.   Determine the equation of the best fit line, which describes the relationship between

      SALES and CALLS.

 

3.   Determine the coefficient of correlation. Interpret.

 

4.   Determine the coefficient of determination. Interpret.

 

5.   Test the utility of this regression model (use a two tail test with α =.05).

      Interpret your results, including the p-value.

 

6.   Based on your findings in 1–5, what is your opinion about using CALLS to predict SALES?

      Explain.

 

7.   Compute the 95% confidence interval for beta-1 (the population slope). 

      Interpret this interval.

 

8.   Using an interval, estimate the average weekly sales for weekly calls that are 150.

      Interpret this interval.

 

9.   Using an interval, predict the weekly sales when weekly calls are 150. 

      Interpret this interval.

 

10.  What can we say about the weekly sales when weekly calls are 300?

      Explain your answer.

 

 

In an attempt to improve this model, we attempt to do a multiple regression model predicting SALES based on CALLS, TIME, and YEARS.

 

 

11.  Using Minitab, run the multiple regression analysis using the variables CALLS, TIME, and

      YEARS to predict SALES. State the equation for this multiple regression model.

 

12.  Perform the global test for utility (F-Test). Explain your conclusion.

 

13.  Perform the t-test on each independent variable. Explain your conclusions, and clearly state

      how you should proceed. In particular, state which independent variables should we keep, and

      which should be discarded.

 

14.  Is this multiple regression model better than the linear model that we generated in parts 1–10?

      Explain.

 

15.  All DeVry University policies are in effect, including the plagiarism policy.

 

16.  Project Part C report is due by the end of Week 7.

 

17.  Project Part C is worth 100 total points. See grading rubric below.

 

 

Summarize your results from 1–14 in a report that is two pages or less in length and explains and interprets the results in ways that are understandable to someone who does not know statistics.

Submission: The summary report and all of the work done in 1–14 (Minitab Output + interpretations) as an appendix.

 

Format:

      A.   Summary Report

      B.   Points 1–14 addressed with appropriate output, graphs, and interpretations. Be sure to

            number each point 1–14.

 

 

Project Part C: Grading Rubric

Category

Points

%

Description

Questions 1–12 and 14

5 points each

65%

addressed with appropriate output, graphs, and interpretations

Question 13

15 points

15%

addressed with appropriate output, graphs, and interpretations

Summary

20 points

20%

writing, grammar, clarity, logic, cohesiveness, adherence to the above format

Total

100 points

100%

A quality paper will meet or exceed all of the above requirements.

 

 

SALESCALLSTIMEYEARSTYPE
4617112.75ONLINE
3413417.04NONE
4416515.73ONLINE
4518613.03ONLINE
4218014.82ONLINE
4718412.42ONLINE
3312620.23NONE
4417214.43GROUP
4216113.91GROUP
3714915.43NONE
4618112.24ONLINE
4014516.00NONE
4314017.02GROUP
5219813.52ONLINE
4114917.30ONLINE
4216812.93ONLINE
3212417.52NONE
4214916.51GROUP
3813518.21GROUP
4918518.62ONLINE
3915418.31NONE
4314915.61ONLINE
5019313.21ONLINE
3715318.70NONE
3915215.03GROUP
4317014.74GROUP
4419214.61GROUP
4516516.43ONLINE
4015015.33GROUP
4317415.62ONLINE
4216815.00ONLINE
4817815.13ONLINE
4416416.53GROUP
5119111.82ONLINE
3713914.40NONE
3713817.71NONE
4617115.95ONLINE
4417011.20ONLINE
4115318.03GROUP
4215415.12GROUP
4014414.03NONE
3713416.92NONE
4717717.20ONLINE
3915714.54NONE
4013420.23GROUP
3713118.31GROUP
3512918.44NONE
4418315.14ONLINE
4316914.05GROUP
4215516.02ONLINE
4818212.82ONLINE
3714312.01NONE
4115713.51ONLINE
4316714.83ONLINE
4014215.82NONE
4216812.12GROUP
4317514.82GROUP
3915018.02GROUP
4115517.91GROUP
4616316.62ONLINE
4016213.64GROUP
4418914.13ONLINE
4415320.92ONLINE
4115813.43ONLINE
4316011.24ONLINE
4617312.11ONLINE
4317818.32GROUP
4718913.11ONLINE
4918411.44ONLINE
4517414.02ONLINE
4818814.60ONLINE
3714915.81GROUP
4015914.62GROUP
4416014.82ONLINE
4116617.41GROUP
5217814.91ONLINE
4917812.02ONLINE
4817613.31ONLINE
3914315.52NONE
4115918.82ONLINE
3814914.72NONE
4015116.62GROUP
4818613.11ONLINE
4719413.12ONLINE
3815214.24GROUP
3814619.72NONE
4518810.02ONLINE
3913919.33GROUP
4920112.51ONLINE
4115611.83GROUP
3613219.52NONE
4216116.33ONLINE
4115214.61ONLINE
4517816.42ONLINE
3815716.43GROUP
4115414.31GROUP
4415621.60ONLINE
4417012.51ONLINE
4417015.80ONLINE
3714617.73NONE
  • 12 years ago
Maths 533 Project C (A+++++++++++ Work and on the basis of new data) Only for refernce old work
NOT RATED

Purchase the answer to view it

blurred-text
  • attachment
    project_c.docx